4 2 mw mixed gas boiler in malaysia

Overview of 3 ton Firetube Gas Fired Steam Boiler

3 ton Fire tube gas fired steam boiler as one of the implementation subitems awarded by the world bank GEF efficient environmental protection boiler project, which is developed by ZG Boiler for the technical cooperation with the German, has reached the advanced world level, and is in the leading level of domestic boiler industry.

3 otn Fired tube gas fired steam boiler for sale in ZG Boiler adopts the international popular three return structure with big volume design of combustion chamber, and it can make the burning more fully. The corrugated furnace structure not only increases the heat transfer area, but also satisfies the free expansion after the furnace is being heated. It has a wide fuels adaptability, not only gas, but also oil, light oil, heavy oil, city gas, biogas and so on all can be its fuels.

Three kinds of ventilation 4 2 mw mixed boiler in malaysias often used at runtime to be continuously supplied to the boiler the combustion air required, and the resulting flue gas continuously drawn, a process called draft process of the boiler. Once the venting is stopped, the boiler will stop running; usually mechanically ventilated, i.e., by means of a pressure head generated by the fan to overcome smoke flow resistance of the duct. Mechanical ventilation currently used in the following three. A negative pressure ventilation chimney addition to using, the former also mounted chimney draft fan to overcome the resistance of all of the smoke, the air duct. This small capacity of ventilation, smoke wind resistance is not so large boiler system is more applicable. Second, while a balanced draft and induced draft fan blower mounted in the boiler smoke, air system. Port to the suction passage into the furnace from the wind (including through an air preheater, and a fuel combustion device layer) overcome the resistance of the entire duct fan; furnace outlet to the outlet stack (including a negative pressure outlet furnace, boiler slag tube after anti heating surface portions of the device and the dust removal) all by flue draft fan to overcome the resistance. This ventilation can effectively into the air, and the furnace flue boilers and all run under negative pressure, boiler room of the safety and health conditions better. If compared with negative pressure ventilation, boiler air leakage is small. Currently in heating boilers, the most balanced ventilation. Third, the only positive draft blower mounted in the boiler smoke in the air system, with its head against the resistance of all the smoke duct. Then the furnace and flue boiler are all working under pressure, and thus the furnace wall and door units are required tightly sealed to prevent leakage of flames and smoke high temperature hurt. This ventilation improves the strength of the heat of combustion furnace, boiler smaller volume equivalent capacity. By eliminating air leakage boiler furnace, flues, and improve the thermal efficiency of the boiler. Positive pressure ventilation, currently has applications in the oil and gas boilers. Boiler draft ventilation is generally balanced and positive pressure ventilation. These are the three common boiler ventilation method, in the process, to constantly add fuel, while also promptly clean up the burned ashes.

The party hot water 4 2 mw mixed boiler in malaysia output fast enough to provide high efficiency, give us save a lot of fuel costs, and exhaust gas discharged tested in full compliance with environmental regulations on emissions of air pollutants in Henan Province. Fast boiler responsible attitude also left us with a deep impression, overhaul maintenance problems for a number of aspects of boiler operation and post, sent a very professional technical staff and our butt, fireman guide our people, for the quick sale of party, we are also very satisfied. --customer feedback

This standard at age requirement 4 2 mw mixed boiler in malaysia flue soot, sulfur dioxide and nitrogen oxides emission concentration maximum permissible emission limits, and the blackness. This standard applies to coal-fired capacity and intended use of the fuel and emissions of air pollutants manage outside gas boiler boiler, and construction project environment (65t / h) In addition to power generation boilers and pulverized coal is greater than a single output 45.5MW impact assessment, design, final acceptance and after the completion of the sewage management.