biomass pellet wood fired thermal oil boiler

Recently, the China Engineering Co., Ltd. hot and fast Boiler Co., Ltd. signed a strategic cooperation agreement, both sides of the trust based on good, long-term development strategy for the two sides to consider, powerful alliances, work together to open up the market to achieve a win-win. China Thermal Engineering Co., Ltd. is a consulting, design, general contracting, investment, development, management operations in one, involving multiple areas of integrated enterprise. Huare company has a municipal utility industry thermal qualification, professional qualification of city gas engineering, construction industry, construction qualification, design pressure pipeline GB1, GB2, GC2 qualifications, municipal utilities (gas and heating) consulting qualification, by continuously strengthen the quality management, establish a sound quality assurance system, and successfully passed the ISO9001 quality system certification, occupational health and safety management system certification, environmental management system certification.

The reason the gas biomass pellet wood fired thermal boiler burner increased noise analysis when making use of the gas boiler and found this small fire normal, but this time turn the fire, extinguished or flashing instability. First speaking, that is because of this fire damper of the air volume setting is too large; i.e. after an oil fire because the micro-switch valve (damper outermost that group) inappropriate setting (set lower than the fire damper of the air flow larger) burner gas noise increases, mostly because the oil shut-off valve which is closed or lack of oil into the oil filter clogging; or, this is because of low temperature into the oil, the viscosity is too high or the pump into the oil temperature is too high; oil pump failure; fan motor bearing damage; there is because the fan impeller dirty equipment resulting in large noise. The above-described failure when using gas boiler, but also because the viscosity is too high oleaginous easy to be atomized (heavy oil); cyclones and because improper disc and the nozzle pitch; Note that because the fire is worn or dirty nipple; also because this preparatory tank the heating temperature is too high, causing the oil pump oil feed steam does not conform; or because the fuel inside the boiler resulting aqueous oil. When the above-described fault gas boiler used to perform this process, the test should be done gradually decreases; after heating temperature should be; adjusting the distance (between 0 ~ 10mm); clean or replace; is set to about 50 deg.] C to about; or drain oil change.

For example, the low-nitrogen condensing oil and gas biomass pellet wood fired thermal boiler adopts advanced condensing technology to make secondary use of the high-temperature flue gas generated by the boiler operation, fully absorb the waste heat of the flue gas, and the boiler efficiency can reach 98%, which can save a large input cost for the paper mill. And the boiler adopts the world's advanced technology--FGR technology, using flue gas recirculation, the flue gas generated by the boiler operation is re-entered into the furnace through the connecting pipe, and the function of low nitrogen oxides is achieved by lowering the combustion temperature, which is a green energy-saving energy-saving pioneer. .

Acceptance of low nitrogen renovation project management approach gas-fired biomass pellet wood fired thermal boilers in order to successfully carry out the transformation of the company low-nitrogen, low nitrogen transformation and acceptance process will now be regulated in response to acceptance of work under different circumstances, thus does not affect the progress of the company's overall transformation of low-nitrogen, It is organized as follows. The company low-nitrogen transformation acceptance criteria refer to "Beijing Gas (oil) boiler low nitrogen transformation Yijiangdaibu fund management approach" in low-nitrogen transformation acceptance requirements, low nitrogen transformation of the company and the manufacturers signed contracts for acceptance, and a phased acceptance carried out the way, it is divided into the following four stages: prior to acceptance confirmation from the manufacturer, pre-acceptance, government low nitrogen transformation and acceptance, final completion and acceptance. First, the low nitrogen gas boiler renovation project before pre-acceptance confirmation from the manufacturer to achieve the requirements of the contract 1. The actual standard for this type of project, the next step is direct acceptance process. 2. The actual contract can not reach the required standard (manufacturers to lower the acceptance criteria) for such projects, communication with the manufacturers of xx, re-sign a supplementary agreement or contract, according to a new contract or acceptance protocol standards. 3. The actual contract not up to the required standard (manufacturers do not agree or do not allow the government to reduce the acceptance criteria) for such projects, communication by the xx with the manufacturers, to terminate the contract, non-acceptance. Second, a low nitrogen gas boiler renovation project pre-acceptance satisfy items (1 projects above) pre-acceptance required to start the pre-acceptance operates in the following claims. 1.xx after the company confirmed that manufacturers have reached the standard contract, the company launched an internal pre-acceptance, and notify the relevant Division, Center for Technology Management, Operations Management Center attended. 2. Pre-acceptance of the project can be divided into environmental inspection and acceptance of two parts, the project must meet the acceptance requirements of environmental protection (standards and materials), to enter the next "low nitrogen transformation of government acceptance" stage. Unqualified acceptance content, fill out the on-site rectification notice, rectification, manufacturers, construction units, divisions, technical, operational and other relevant units to sign it by the deadline. 3. If the project environmental impact there is acceptance, boiler and other major security issues, not by pre-acceptance; In addition, pre-acceptance by the environmental protection, engineering, pre-acceptance deadline for correction. 4. In response to these contents rectification notice, by the manufacturer or xx arrange the construction unit to develop corrective plan submitted to the relevant divisions, technical, operational management center knows, in order to determine the final acceptance plan. Third, the low nitrogen gas boiler renovation project government low-nitrogen transformation project through the pre-acceptance and acceptance of environmental protection, and acceptance by the Government Division organized low-nitrogen transformation inspection department, relevant content is organized as follows. 1. A low nitrogen acceptance by the division of the transformation EPA invited, and notifies the acceptance time OA xx, center management technology, operation and management center. 2. The notification by the equipment manufacturers xx company to deal with the EPA project acceptance. 3. Technology Management Center, operation and management center according to the situation, coordination, cooperation division of the Environmental Protection Agency to complete the inspection. 4. acceptance by EPA, proceed to "completion and acceptance of the final" stage. 5. If the EPA does not pass inspection, subject to the opinion of the EPA, the Environmental Protection Agency if given a second chance acceptance, arrange for rectification by the Environmental Protection Agency xx grasp, and to give the exact time of commissioning compliance, and older than the Environmental Protection Agency to give the second acceptance time more than 3 days; EPA if not given a second chance of acceptance, the acceptance consequences borne by the manufacturer and by the execution of the contract with reference to the subsequent procedure. Fourth, low nitrogen gas boiler renovation project completed after final completion and acceptance 1. EPA acceptance, notify the manufacturer xx by the company, the construction unit to start the rectification work. Factory or construction unit for rectification according to plan in accordance with the rectification notice requirements. 2. The respective divisions, technical management center, operation and management of the center to collaborate rectification work, with supervision. 3. After the completion of the rectification project, organized by the xx-related divisions, technical management center, operation and management center participate, final completion and acceptance, to complete the transfer.