14th oil fired hot water boiler in qatar for seafood industry production

Recently, the Fujian Provincial People's Government formulated and issued the "Fujian Blue Sky win the Battle of three-year action plan to implement the program" (the "Program"), "plan" will fully implement the spirit of the party of nineteen, in strict accordance with the National Ecological environmental protection requirements, adhere to the development of new concepts, rule by the people, respect the source of prevention, treating the symptoms and so on, determined to win the battle of the blue sky.

"Program" Total thirty-nine, according to Xiao Bian finishing, a total of six boilers relevant content for your reference.

1, deepen industrial pollution control. As of the end of 2020, the completion of the sewage pipe catalogs specified in the license issued by the licensing industry issues, increase exceeded, waste-water treatment, fraud and other illegal activities. Promote key industries pollution control upgrades, the focus control area will strictly implement the Ministry of Environmental Protection issued the "Notice on the implementation of air pollutant emission limits in particular", the use of natural gas, Fuzhou, Quanzhou, in principle, two new projects to further promote the building construction ceramics ceramics pollution remediation; Zhangzhou City, the implementation of boiler "coal to gas" project.

2, optimizing energy structure. Until 2020, primary energy consumption control in 142 million to 1.62 million tons of coal, coal in primary energy consumption is reduced to 41.2%, increase the proportion of clean energy to 28.3%.

3, accelerate natural gas applications. Speed ​​up the construction of natural gas infrastructure, improve the natural gas pricing mechanism, to further increase the use of natural gas.

4, an alternative propulsion power. Transportation, construction, industry, food, agriculture, tourism and other fields to accelerate alternative energy work. By 2020 the proportion of energy use accounts for about 29%.

5, deepen the comprehensive improvement of coal-fired boilers. Eliminated, shutting down 300,000 kilowatts of coal-fired boilers environmental performance is not up to energy security. And to carry out comprehensive improvement of the way and central heating coal-fired boiler. Cities above county level out of 10 tons of steam / sales and less coal-fired boilers, no new 35 steam tons / hour of coal-fired boilers.

6, strengthen the construction and management of the combustion zone ban. Each urban renovation to increase the range of high-pollution fuel combustion zone ban according to a division range, and punishes violation of the ban on burning zone management requirements.

7, improve energy efficiency. Dual control sustained energy consumption and working examples intensity. Strict management of energy-saving, energy-saving equipment industry and other key areas of work, to promote energy-efficient technology and low nitrogen products.

8, expand industrial furnaces governance. Localities to develop according to their industrial furnace implementation of comprehensive improvement program for non-compliance of industrial furnaces, small and medium sized furnace gas generator out of efforts to encourage the use of electricity, natural gas and other clean energy.

All cities in Fujian Province will strictly follow the "program" the development requirements of the implementation of the measures, so that the people responsible life, contribute to environmental protection goals.

Pressure fuel boilers interpretation of the overall daily operation and maintenance of oil-fired boilers with atmospheric corrosion knowledge structure, including boiler and auxiliary equipment of two parts. Boiler furnace, drum, burner, water wall superheater, economizer, air preheater, and the furnace wall, etc. The main frame member constituting the core part of the steam production, called boiler. Boiler body is in two main parts and drum furnace. Also known as the furnace combustion chamber, fuel combustion for space. The solid fuel on to the grate, referred to as a fire bed combustion furnace Stoker, also known as fire bed furnace; solid fuel furnace liquid, gas or pulverized, is injected into the combustion chamber is called the fire chamber burner, also known as the furnace fire chamber; air coal particles burn hold it was boiling, and the furnace is inferior fuel suitable for combustion is called fluidized bed furnace, also called fluidized bed furnace; coal particles so that an air flow rotated at high speed, and strongly called fire cylindrical cyclone furnace hearth. Boiler pressure fuel daily operation and maintenance link and chemical corrosion, turbine attendant prepare enough desalinated water, oxygen, water passing temperature no higher than the drum wall temperature 50 ℃; Sheung during hot drum wall temperature should be after the temperature of the metal is not more than 40 ℃ before a new installation or repair departments boiler Feed records an indication of expansion. Sheung summer time less than 2 hours, at least 4 hours in winter, when the temperature and Sheung drum wall temperature difference of less than 40 how ℃ boiler reheater corrosion protection? after turbine fight gate, boiler guarantee a blower, an induced draft fan is running the best cross retain two oil gun. turn reheaters to the empty exhaust steam reheater hydrophobic doors and air doors corrosion, anti-corrosion of the reheater steam temperature is lower than a predetermined deg.] C for 400 control drum water level within an allowable range. anticorrosive time less than 20 minutes after stopping two oil gun operation. guarantee furnace pressure when 50--100Pa, each of the flaps open, baffle for ventilation less than 5 minutes, stop sending, fan, each of the flaps closed tailgate may be appropriate to accelerate Sheung speed.

Fuel steam boiler and reciprocating pump works fast boiler company Henan editor that works with you about the structure of the fuel steam boiler fuel steam boiler and reciprocating pump: its compact structure, small size, high efficiency, easy to use, environmental pollution small, medium and large cities in our country is increasingly widely been used. Small fuel gas-fired boilers are generally carried out in the factory oil (gas) volume, water, air volume of commissioning, pressure gauge, safety valve adjustment, and burners, pumps and other auxiliary equipment commissioning, in order to normal operation after the entire boiler factory. A check 1. Check pump and before the filter is normal ignition into the oil boiler, gas furnace check the gas pressure is normal, not too high or too low, the valve opens the supply of oil or gas. 2. The valve on the flue must be fully open (wind deflector or throttle), otherwise the hair wash the affected, causing risk of accidents. 3. Check the control cabinet of each knob, should be in the normal position. For example: oil, gas fuel of choice, should be placed on the fuel combustion; manual / automatic water knob should be placed in the automatic position; fire / flame position small knob, on the small fire position; on the associated combustor knob position. If left in the chamber 4. The product oil or debris should be cleaned. 5. Check the boiler ignition sequence control and fire protection means should be flexible and reliable. Blast doors on the boiler should be flexible, tight. 6. Other inspection items with the same steam boiler (details see this Chapter). All the above work can only be completed after the ignition is started. Second, the fuel gas boiler ignition start (a) auto-ignition process boiler according to claim 1. For process control "Steam Boiler Safety Technology Supervision" predetermined fuel gas boiler to be fitted reliable ignition and flame protection program control means, and for ignition program, the total ventilation time before the ignition and the principles set forth requirements. Fuel gas-fired boiler automatic ignition control procedures are procedures for the operation command center, the heart of the program controller is fully automatic operation, the process control system fully into account all the necessary interlocks to prevent operating errors and accidents caused by equipment failure, It represents good security. Core within the process control system is a controller are basically three: (1) a mechanical process controller; (2) electronic program controller; (3) real-time control microcomputer program controller. But whatever the controller uses, roughly five main steps procedure: automatic furnace purging process, the program auto-ignition, flame protection program, program safety interlock protection, the combustion load adjustment procedure. There leak gas boiler control program. Belonging to the reciprocating pump displacement pump, it is to rely on reciprocation of the piston or plunger of the pump cylinder, the pump cylinder working volume cyclically expanded and reduced to suction fluid. Reciprocating pumps generally consists of two basic components, to achieve an end pressure energy is converted into mechanical energy, and part of the liquid fed directly, or said hydraulic cylinder end portions; and the other end is a power transmission part, said power end. Henan is committed to fast boiler steam boiler manufacturing, product quality, reasonable prices and widespread industry praise, if you have any needs, please contact us!

Features 14th fired hot water boiler in qatar for seafood industry production description: hot water boilers currently on the market are mainly classified according to different fuels, which are divided into electric water boiler, gas hot water boiler, hot water boiler fuel oil and coal-fired hot water boilers. Fuel (gas) hot water boiler diesel or natural gas as fuel, the water is heated by a burner, to provide heating and to achieve life, bath with hot water, a high degree of intelligence boiler, heating speed, low noise, no dust. Today small introduction pressure hot water boiler composed of four characteristics;