10t Natural Gas boiler Low Price

Second, grasp the "coal to gas," the key link.

1, removal of the original coal-fired boiler slag machine, coal hopper, coal equipment, chain grate, gearbox and so on.

2, by calculating the heat transfer in the furnace, the furnace geometry is determined, the center position of the furnace flame. Re-casting furnace, the furnace using the refractory castable

Natural gas as a clean energy, can be reduced nearly 100% of the sulfur dioxide and dust emissions, 60% of carbon dioxide emissions and 50% of nitrogen oxide emissions, and help to reduce acid rain, global warming alleviate, reduce proportion of the amount of coal energy important energy; corresponding gas 10t boiler low price has gradually been used and popular.

The fact that we determined to achieve cooperation with the fast 10t boiler low price is a very wise decision, after a period of time put into the boiler efficiency significantly much higher than our original boiler efficiency, significantly reduce fuel costs, the economic benefits brought by the boiler is obvious. --customer feedback

Henan coal-fired 10t boiler low price plan according to Henan authorities learned that, as of October 31 this year, to central heating in provincial cities, provincial tube county, county and other built-up areas within the area covered so the organs and institutions and railways, housing residential, hotels, baths and other coal-fired boilers are dismantled or clean the transformation of objects. 11 months ago will be completed 849 sets of 10 tons of steam coal-fired boilers and removal of the following, or the transformation of clean energy. For the clean energy transformation principle is that burning natural gas, liquefied petroleum gas, electricity, biomass briquettes, coal gas and other clean energy programs in addition to the completion of the boiler or dismantling of the unit, the province will also give some financial subsidies. Will also Chaigai boiler as markers official standard for the principle of demolition is not able to recover the use of a standard boiler. That theme boiler must be removed, the chimney must be removed, associated piping and wiring must be removed or cut off, boiler-related write-off procedures. If you can not practice the subject matter must be removed to dismantle motors, blowers and other major equipment