4t Energy Saving Dealer boiler Jordan

When the loose internal gas 4t energy saving dealer boiler jordan scale or slag, after cooling boiler shutdown, let go of boiler water, then rinse to descaling.

Fire safety means 4t energy saving dealer boiler jordan room and a fuel gas (C) and CPI production plant, facilities should foam, vapor, etc., and an indoor fire water supply should be set. A boiler room building is, when two fire resistance rating, without providing indoor fire water supply. The number of fire extinguishers configuration generally based on a configuration of 50 m2, boiler room but not less than two.

For the continuous improvement of the province's environmental air quality, enhance people's happiness index, Henan Province Government Office issued the "2019 campaign of air pollution control implementation plan." Details are as follows.

1, to carry out special treatment industrial furnaces

Based on the melting furnace, the melting furnace, sintering machine (furnace), roasting furnace, a heating furnace, heat treatment furnace, a drying furnace (kiln), coke oven gas furnace 9 categories, to carry out an intensive investigation, the establishment of industrial furnaces Details inventory management, enhance the implementation of classification regulation. Not included in the investigation of industrial furnaces list, all included in the autumn and winter peak load shifting discontinued inventory.

2, to carry out clean alternative

Of coal, petroleum coke, residual oil, heavy oil as the fuel of a heating furnace, heat treatment furnace, a drying furnace (kiln), and actively promote the use of natural gas, electricity and other clean energy and the use of plant waste heat, heating power plant and the like instead.

3, to carry out comprehensive improvement of industrial boilers

Before the end of October 2019, in addition to undertaking tasks and will not have the alternative livelihood conditions, the province's basic complete 35 steam tons / hour boiler clean energy transformation or removal of coal-fired. Transformation methods include the removal, an alternative central heating, gas coal, coal to electricity, use geothermal, wind, solar, biomass with a bag filter. Chaigai on schedule to complete the coal-fired boilers, based on 40,000 yuan / tons of steam prize money up. Forbidden to use has been shut down and eliminate waste coal-fired boilers to cash rewards and subsidies.

4, strengthen upgrading gas-fired boiler

Before the end of October 2019, the provincial municipality and county (city) district built more than 4 tons of steam and low nitrogen gas boiler complete transformation after transformation, soot, sulfur dioxide, nitrogen oxide emissions are not higher than the concentration of 5,10,50 mg / cubic meter.

5, strengthen upgrading oil-fired boiler

Before the end of October 2019, the provincial municipality and county (city) district built more than 4 tons of steam and fuel (including alcohol-based fuel) boiler low nitrogen complete transformation after transformation, soot, sulfur dioxide, nitrogen oxides emission concentration is not high in 10,20,80 mg / cubic meter.

6, vigorously promote urban central heating

Full use of existing resources and central heating facilities, the existing large-scale heat sources and central heating pipe network in the area, in-depth investigation heating demand, and promote the rich heating capacity extends to reasonable radius and root out the potential heating, heating reduce blind spots. Before the end of October 2019, Zhengzhou, Anyang, Jiaozuo, Puyang City, built-up area of ​​central heating penetration reached more than 90 percent, Xinxiang City, central heating penetration reached more than 85%; Luoyang, Xuchang, Jiyuan City, central heating penetration reached 3 more than 80%; Sanmenxia central heating penetration 75% or more; unsealing, Pingdingshan, Hebi, 4 Zhumadian City, central heating rate of 70%; Luohe, Shangqiu, Nanyang 3 City central heating penetration reached 60% .

What preparation needs to be done before installing the condensing 4t energy saving dealer boiler jordan?

With the improvement of material living standards, modern people generally have higher requirements for the temperature state of their environment. Since the advent of research and development, condensing boilers have successfully attracted the attention of a large number of social groups. After an in-depth understanding of the performance of condensing boilers, many social groups are scrambling to buy. At the same time, the installation of a full range of condensing boilers has become an urgent problem for many buyers, so what preparatory work should be done before installing the condensing boilers?

1, it is well known that environmental protection has become an issue of great concern in today's society, and the relevant departments have formulated a series of rules for the installation and use of boilers. Those enterprises and institutions that do not meet the requirements will not be able to install the condensing boilers smoothly even if they have purchased them, so be sure to verify that they are qualified for installation before installing the condensing boilers.

2. The second item is to check whether the parts are complete or not the existing condensing boilers in the market usually need to go through many links from the factory to the formal operation in which the transportation and storage are the necessary links for the boiler to be put into the market. If the relevant work is not done in these links, the performance of the condensing boiler may be affected. Therefore, it is necessary to check the appearance of the boiler and the completeness of the fittings before installing the condensing boiler.

3, the installation of auxiliary mobile equipment will be ready because most condensing boilers are relatively large and difficult to move, if the installation depends solely on manual handling or movement is not very realistic. Only by means of large-scale hook-hanger equipment can the condensing boiler be placed in the intended installation position, so the enterprise that buys the condensing boiler will need to prepare the auxiliary moving equipment before installing it.