Dealer 6 ton Natural Gas boiler Vietnam

We know the difference between fuel oil and gas dealer 6 ton boiler vietnams, gas or oil-fired boiler choice is not difficult to solve: first, to see if fuel oil sales unit is located within close range, then give up if no oil-fired boiler, long-distance transport will increase fuel cost. Second, you can understand the situation to the relevant units subscribed natural gas pipelines, though such early to spend more, but in the long run, can save a lot of money as a unit.

In recent years, with the continuous development of dealer 6 ton boiler vietnam industry, all kinds of equipment, including gas-fired boiler, have been further developed and applied. We know that the production of every kind of equipment can be widely used. It has its own advantages, so what are the main advantages of the gas-fired boilers we are talking about today? According to the introduction, it can be understood that gas-fired boiler does not need to accumulate coal ash, so it can eliminate the occupied area. When the gas-fired boiler is used for fuel transportation, the other auxiliary machines are less, the power is small, and the running time is short, so the electricity consumption is saved at a very high level. Production of heat transfer oil boiler. The others, because of the gas-fired boiler, Now it will run out of dust and pollution, and natural gas will be used as a clean energy source. In gas-fired boiler operation, there is no pollution, is easy to achieve. Environmental requirements every night. The daily use of gas-fired boilers needs to be maintained. When the boiler is not used, it should be maintained and maintained. This can not only extend the service life, but also reduce the problems in the process of use. First, when the boiler is not in use, all internal heat transfer oil must be discharged, because if there is oil, the quality will change. If a leak occurs, it will affect the surrounding environment and will need to be cleaned after release. Keep boiler interior clean and keep other impurities. Its Check the parts of the gas-fired heating furnace periodically to see if there is any loosening. After maintenance, the boiler can be stored, can be used directly after the next use, there will be no other problems. Editor reminds everyone, gas-fired boiler after a period of time, will occur loss. If the loss is too high, it will affect its use, especially in some transmissions and connections. Some lubricants are added to these parts to reduce loss and make boiler performance more stable.

Gas-fired steam dealer 6 ton boiler vietnam abnormal situation, how should we deal with it? When we use gas steam boiler, failure or abnormal phenomena it is inevitable, but in order not to affect the normal use, in the event of a problem gas steam boiler to be timely processing solutions, then the face of all kinds of circumstances, we should how to handle it? Share some of the ways we deal with unusual circumstances. If only gas steam boiler circulating pump abnormalities, such as its current decreases, the pump outlet pressure back to zero, which indicates no oil pump is idle, it may be caused by oil vaporization. Yang identify the reasons therefore first vaporized measures; such as clogging of the filter circulating pump bypass opening evacuated immediately clean the filter; heat transfer fluid as a result of added aqueous or decomposed gases are not excluded in the system, should immediately open the vent an exhaust valve. Circulation pump pressure constant, the current increases and the flow drops, deterioration of the thermally conductive fluid, the viscosity increased, should be replaced or regenerated. New heat transfer fluid as a result of decomposition of aqueous or excluded gases in the system, should immediately open the vent valve of the exhaust gas. When the current is lower than normal circulation pump, the circulation pump efficiency is decreased, the flow rate decline may be heating pipes plug fouling, stainless steel chain should be cleaned. If the gas steam boiler before and after the filter increased in pressure, the pump inlet pressure drops, the filter may be stuck, the opening of the bypass, disassemble and clean the filter. In addition to its low furnace outlet temperature liquid phase heat carrier, mainly for lack of heat fouling problems, it is timely soot blowing. Gas steam boiler grate more common problem is stuck, there are reasons including breaking grate or the grate off loose pins; coal grate has stuck to metallic inclusions; arched grate; slag is sinking the tip of the grate stuck. In response to this phenomenon, the required reverse hand grate plate debris removal, replacement breaking grate after the start, then jammed as startup, stop the rotation of the reasons detailed inspection to resolve. But also to re-adjust the adjustment screw on both sides of the grate tension, if still does not work, we need to replace the sprocket.

Handan: Before the end of October to complete the transformation of more than 10 tons of steam gas dealer 6 ton boiler vietnam burning low nitrogen

A few days ago, Handan City issued "on the deadline to complete the nitrogen oxide gas boiler governance" (the "Notice"), clear objectives, tasks nitrogen oxides governance gas boiler, expected to be completed more than 10 steam tons of gas before the end of October this year, low NOx combustion boiler reconstruction. "Notice" to the objectives and tasks of nitrogen oxide gas boiler control, time requirements, safeguard measures have been clearly defined.

First, the implementation of the transformation of ultra-low emissions

By the end of June 2020, the existing non-electrical gas steam boiler, hot water boiler, Stoker stoker furnace and completed the transformation of a low nitrogen combustion, soot, sulfur dioxide and nitrogen oxides reach 5mg / m³, 10mg / m³ , 30mg / m³, the new gas combustion boiler synchronizing means and is mounted low nitrogen meet emission standards. 20 tons of steam / hour or more gas-fired boiler installation atmospheric pollution automatic monitoring facilities, and networking with the environmental protection department, install a distributed control system (DCS system). 20 t steam / hour to be mounted gas-fired boiler exhaust gas nitrogen oxide analyzer.

Second, the phased completion of the task of transformation of governance

10 before the end 2018, to complete the combustion of the transformation Boilers nitrogen over 10 tons of steam, to complete the 1-10 tons of steam (having a steam tons and 10 tons of steam) combustion transform low nitrogen gas boiler before the end of October 2019, 2020 at the end of 6 before completing the transformation of low-nitrogen combustion gas steam boiler 1 ton. Counties (cities, districts) according to the actual situation, to be completed in advance of nitrogen oxides governance gas boiler.

Third, both subsidies and penalties

"Notice" requirement for acceptance of project management, to give appropriate subsidies comprehensive financial subsidies to control air pollution. Due to the unfinished task of governance be ordered to stop production of governance. For excessive emissions, fraud, unauthorized outage environmental protection facilities, waste-water treatment snuck issues such as rectification and punishment according to law; wrongdoing, be held criminally relevant personnel.