Industrial Distributor 20t Natural Gas fired boiler Maldives

3 tons of gas chemical plant steam industrial distributor 20t fired boiler maldives how much the price of gas chemical plant 3 tons of steam boiler price how much? For the chemical industry, for both the coal era or the early era are now inseparable from the gas steam boiler, so, for the procurement of chemical plant steam boiler must go through a wide range of contrast, this is the case, we need to chemical enterprises procurement staff for a detailed comparison between the various boiler plant. Recently, there is a chemical plant to fast boiler advice to purchase a 3 tons of gas steam boiler, hope fast boiler manufacturers here to help account for the price, there is a look at the tonnage of their choice is appropriate. In this regard, fast boiler for the actual situation of the chemical plant in understanding concluded that the need to use a chemical plant four tons of gas steam boiler. 3 tons is not the case now meet the production. After the chemical industry saw rapid technical personnel accounting data side, it is more recognized. The model is currently in the fast boiler price of around 50 million. So, for chemical plant three tons of gas steam boiler price has accumulated clear.

You must know the industrial distributor 20t fired boiler maldives energy problems (induced draft fan power consumption rate, steam consumption) draft fan causes problems 1.1 boiler flue dust and fouling, in particular air preheater fouling, resulting in increased resistance to smoke duct . 1.2 boiler flue, tail heating surface and dust leakage. 1.3 Leakage Rate large air preheater. 1.4 furnace excess air coefficient is too large. 1.5 unit load changes, run the adjustment is not timely, resulting in furnace pressure is too large. 1.6 unit load or low frequent starts and stops. 1.7 coal into the furnace worse, from the design value. 1.8 low efficiency filter. 1.9 draft fan blade badly worn, low operating efficiency. 1.10 fan outlet flue gas desulfurization big resistance. 1.11 soda boiler pipes for leaks. 2, 2.1 to 2.1.1 operational measures to solve the problem of the strict implementation of soot blowing system to prevent the heated area ash, blocking ash, flue gas system to reduce resistance. 2.1.2 holding the induced draft fan, the flue gas separator baffles and dampers in the fully open position. 2.1.3 The experiment showed combustion boiler, proper control of excess air in the furnace. 2.1.4 adjustment chamber negative pressure, air leakage reduction furnace and the flue. 2.2 routine maintenance and testing 2.2.1 induced draft fan performance test to determine the optimum operating point and efficient workspace. 2.2.2 boiler, air preheater, a flue, ESP and other system leakage inspection, process. 2.2.3 timely check processing chassis, shaft seal leakage. 2.3C / D repair, eliminating defects 2.3.1 down strict accordance with movement clearance adjusting fan. 2.3.2 induced draft fan blade defect action elimination hand vane opening adjustment. 2.3.3 Importers and induced draft fan baffle opening check. 2.3.4 duct tightness check process. 2.3.5 wave plate replacement air preheater, rinsed sector plate gap adjustment. 2.3.6 eliminate dust defects and improve collection efficiency. 2.3.7 clean flue gas desulfurization system, flue resistance is reduced. 2.3.8 eliminate soda boiler pipe leakage defects. 2.4A / B repair and transformation 2.4.1 Check and repair the fan blades, replace seriously damaged blades if necessary. 2.4.2 for energy saving fan efficiency below 75%. 2.4.3 The fan motor frequency transformation. 2.4.4 of the precipitator, if necessary, transform and improve collection efficiency.

Gas-fired steam industrial distributor 20t fired boiler maldives will need to follow those steps: Due to the special nature of dual-use oil and gas boilers, thereby preparing the initial installation and construction from its long-term project to the acceptance stage there will be any problem to pay attention to the need to comply with, what does? Gas-fired steam boiler needs to follow the procedure step by step to complete. In this process, the need to comply with, what does? Boiler installation and construction of oil and gas dual front, first in accordance with the procedures to handle boiler installation approval procedures, pending approval of Quality and Technical Supervision after!

According to our learned Wenzhou Municipal People's Government on February 12 issued a notice "Wenzhou Blue Sky win the Battle of action to implement the program (draft)", the details are as follows.

Accelerate the implementation of the relevant arrangements for the deployment of national, provincial and develop natural gas and other clean energy. According to Yi gas of the gas, the electric power should be the principle, and actively guide enterprises to implement energy clean energy alternative, 2020, the basic completion of provincial trunk pipeline construction, the basic realization of natural gas every county, to further improve the urban and rural distribution pipe network construction , the city's natural gas consumption reached 570 million cubic meters, the proportion of non-fossil fuels in total energy consumption to reach the provincial requirements. Orderly development of hydropower, safe and efficient development of nuclear power, optimizing wind energy, solar energy development layout, local conditions to develop biomass energy, geothermal energy and so on. Where the conditions of availability of resources, to encourage the development of county biomass cogeneration, biomass briquette boilers and biogas. Orderly development of natural gas peaking power plants and other interruptible user, in principle, to new natural gas cogeneration and gas chemical projects. Continue to implement the priority generation and purchase of electricity system to ensure the city's renewable energy generation full protection of the acquisition.

Strict new coal project access, the implementation of the reduction of coal instead. According to the State to win the Battle of the sky three-year action plan calls for no new 35 steam tons / hour high-polluting fuel boilers. By 2020, the city's coal accounts for the proportion of total energy consumption fell to 42.8% or less, the city's total coal consumption decreased by 5% compared with 2015. According to focus on the use of coal and clean use of principles, focusing on reduction of non-coal for electricity, increase the proportion of electricity from coal in 2020, the city's electricity and central heating coal proportion of total coal consumption reached provincial requirements. Continue to promote alternative energy coal and oil, replace reached the provincial requirements.

For shutting down the unit's capacity, coal consumption and emissions targets, allowed to trade or replacement, can co-ordinate arrangements for building the capacity of ultra-low emission coal-fired units. Strict control of new coal-fired units installed capacity in the region rely on new clean energy generation and transmission to meet outside the main electricity consumption. In the premise of protecting the power system security and stable operation of 2020, to accept the outgoing power levels to at least 38%.

Consolidate construction achievements combustion zone ban, increase efforts to eliminate small coal-fired boilers. According to the National to win the Battle of the sky three-year action plan calls for phasing out the 10 steam tons / hour and coal-fired boilers, the county level and above urban area basically out of coal-fired tea furnace, operating a stove, grain storage and drying equipment, etc. facilities; basically eliminated the city's 10 steam tons / hour and 35 steam tons / hour of coal-fired boilers; 35 steam tons / hour and more polluting fuels and energy-efficient boilers to complete the transformation of ultra-low emissions; low nitrogen gas boiler basically completed the transformation; city built-up area of ​​biomass boilers implement ultra-low emissions transformation.