Commercial 10t gas steam boiler Agent Brunei

SUMMARY gas commercial 10t steam boiler agent brunei maintenance gas boiler twice monthly maintenance inspection item A. Fuel supply line: a filter cleaning gas oil; ignition gas conduit 2 airtightness inspection; 3 checks whether the flow line... B. inspection of the instrument: a flushing water table; 2 Syphons flushing; valve experiment. C. Check burner:.... The flame detector (photocell) cleaning the light receiving surface; second inspection oil pump pressure is normal; 3 checks the combustion flame is normal; 4 check burner, the burner sound is abnormal; 5 Cleaning revolutions cup; 6 o'clock washing water rod. . Check D. Intake system: a washing water filter; 2 reaches rated pump head and flow; 3 a check valve is working properly... E. daily drainage tank and the cleaning debris. Water quality testing, water testing furnace. F. Check the combustion consumption is normal. Every three months in addition to the maintenance items plus the inspection item inspection items: Electric Part A: 1 line is loose aging, failure; 2 check the reliability of electrical components, overload; Protection relay 3 is normal; B.... open soft low deactivation tank valve exclude sludge; C to test the boiler and then point interlocking means: 1. low water position; overpressure 2; 3 flameout 4. The exhaust gas temperature ultrahigh; D. et quality tobacco. detection: analysis of tobacco smoke constituents comprising temperature detecting tail, combustion is working properly checked. E. burner and boiler cleaning outer cleaning. Paul A. large projects each year hosts a body part of a comprehensive clean-up tobacco pipes, water pipes, front and rear smoke box, part of the furnace and the burnout chamber and smoke tubes ash collection. 1. inspection openings comprehensive inspection hole hand hole, manhole sealing soundness, and timely replacement of defective seals. 2. The overall comprehensive testing instruments, valves, comprising detecting pressure gauge and safety valve, the pressure controller and the electrode level controller tuning. Part B. burner: Burner cleaning turn round cup, ignition means, filter, pump, motor and impeller systems, throttle link means to add a lubricant. Re-awarded for combustion testing. C. access control section detecting electrical components, control lines, the control box clean ash collection, each control point is detected. D. water supply system maintenance water treatment plant to check whether water quality standards, a comprehensive clean soft water tank, to check the functioning of the pump and lift, clean check valve spool and so on.

Our other fast boiler in the boiler industry strength already heard, through cooperation proves that our choice is correct. This water-tube boilers installed very quickly, basically no delay our production process, bring benefits to the enterprise. --customer feedback

Gas boiler heat loss through the combustion of fuel gas boiler, will release some heat, which will supply part of the user, some will be recycled and part is inadvertently wasted. So these are wasted heat lost through the ways in which it (1) heat losses:? Flue gas exhaust gas boiler part of the heat into the atmosphere, causing the boiler heat losses, it is each boiler term heat loss Dazhong biggest one. The main factors influencing the heat loss is higher exhaust gas temperature and the amount of smoke exhaust gas temperature, the greater the amount of smoke, the greater the heat loss. Low exhaust gas temperature depends mainly on the number and operating conditions of the heating surface; the amount depends on how much leakage exhaust case and the furnace excess air, flue. (2) heat loss incomplete combustion gas: a part of the unburned combustible gas is discharged with the flue gas to heat loss caused by heat in the flue gas. The main factors affecting the incomplete combustion gas heat loss is the excess air and furnace structure. Excess air coefficient is too small, uneven air is mixed with fuel, easy to generate carbon monoxide and other combustible gases; excess air coefficient is too large, the furnace temperature is lowered, the combustible gas is not easy ignition and combustion. Furnace volume is too small, combustible gases in the furnace too late to enter the combustion flue gases caused by incomplete combustion heat loss. (3) heat loss: the furnace heat loss, frameworks, pipes, door opening caused by heat dissipation to the surroundings. Size depends on the heat loss factors of the size of the surface area of ​​the furnace gas commercial 10t steam boiler agent brunei, heat insulating properties and thickness, the outside air temperature and the flow velocity. Electric heating reactor common external damage: an electrically heated reactor despite external corrosion has a high etching resistance against acid and alkali resistance, but our electrical heating by the heating apparatus is a kettle layer and an outer tire iron constituted. Such a medium is iron acids and bases are not corrosion-resistant. If we would have the production process if the reactor cover or screwed pipe joints without seal failure or leak acid tire iron reactor apparatus for electrically heating the outer corrosion. Corrosion support member 2. The reactor was heated electrically heated reactor during installation, support or other support member may be mounted directly on the floor, due to the long manufacturing operations on the floor may be deposited with corrosive media, so that for support our reactor electrically heated apparatus corrosion, resulting in the supporting force of each of the support produces a change resulting in a change in stress in the damage produced during heating layer. 3. The electrically heated reactor stress spout in the electrically heated reactor, when the steel of the pipe and the pipe joint, since the thermal deformation and the reaction was heated electrically heated autoclave vessel or duct stressed cold might damage the pipe.

Which Xining Xining industrial boilers industrial boilers looking to find Which? There are a lot of companies need to produce industrial boilers in Xining area, industrial boilers had previously been dominated by coal, but now the purchase of multi-boiler is gas-based. This is also in line with the requirements of the current environmental policy. For the procurement of industrial boiler business, then Xining region, for businesses can be compared within the boiler manufacturers nationwide. The company Xining After initial screening decision Xianxiang fast boiler manufacturers for consultation. In this regard, fast boiler manufacturers for the accounting data for the current production status of the enterprise Xining, concluded that the plant with 1 table 6 tons of industrial gas commercial 10t steam boiler agent brunei on it. Initially, the company for the transport of Xining boiler still have concerns, however, listened to a detailed introduction side boiler fast personnel of the relevant technology. Completely dispel concerns. At present, the price of the model of industrial steam boiler at around 720,000. Recently, the Xining to fast Boiler companies will conduct field investigation, will talk about specific issues related to time after purchase.