200kg vertical gas fuel steam boilers Dealer price

Gas boiler precautions required during installation methods, or steps :( a) a foundation base of the boiler should be provided is determined according to the local soil, manufacturers design reference by the civil sector again. After reaching the base strength boiler, the boiler should drawings inspection and acceptance, and to draw the whole boiler three reference lines: a, longitudinal reference line - drum center or the center of the combustion apparatus. b, lateral reference line - the center of the front axle or chain grate slag centerline of the machine. C, elevation reference line - can be selected from a number of locations about four weeks, respectively, on the basis of the marking, the relative offset between the markers should not exceed 1mm. Furnace in place. After assembly the lower part of the boiler in place first, then the upper assembly large, the upper and lower portions need to find a combination of two positive pads firmly, should be both inside and outside the two casting. Installation location and size deviation test methods according to GB50273 "boiler installation engineering construction and acceptance" implementation. (B) lifting the boiler, during lifting, should be suspended on a lifting lug drum boiler ready large, the boiler on a foundation base coincides with the pre-drawn reference line. The longitudinal centerline of the boiler and the foundation, the deviation is not more than 3 mm, and the inclination with the center line of the drum hammer correction, allowing the central drum inclination is not larger than 5 mm, otherwise use horns foundation base and the junction pad level. Maximum level (c) Installation of boiler network (1), water supply conduit installation requirements typically require as backup pool below the normal water level line of the boiler, so as not to shutdown, boiler feedwater flowing into a large number of drainage caused to start the next . At the outlet of the tank (i.e., an inlet feed line) should be installed wire screen. (2), a main steam line installation requires the main steam lead pipe straight run section should be more than 0.5 m, the bending radius should be 4-5 times the diameter of the pipe, the trap should be fitted at the lowest line in order to prevent water hammer pipe, while to be reliable insulation. (3), the safety valve should be installed in the valve installation requirements after the hydrostatic test, the safety valve shall be fitted exhaust pipe, the exhaust pipe of the safety guide outside the boiler house, allowed valving the exhaust pipe. (4), mounting a lower water table level table downcomer must access a safe place, Hancock rotating flexible water table, not leaking, water table must be installed to the lighting device, easy to observe. (5), a pressure gauge mounting means so that when the scale gauge vertical plates, should be painted red gauge scale to show the maximum allowable pressure boiler, rotating flexible plug gauge, not leaking, water flow, pressure gauges insulation prohibited. (Iv) the boiler chimney installation requirements, when lifting the chimney, the chimney should be straight, horizontal direction lead length should not be too long, generally less than 5 meters, the height of the chimney should comply with relevant national standards. To add chimney rain cap, the weight of the chimney should not fall directly on the boiler chimney take over the host. Installation (e) combustion system: 1, according to the combustion system of FIG power line control circuit, a control signal line and the control line is electrically connected, the program should be installed reliable ignition and flame failure protection devices. Combustion process controller provides a separate set of contact start-stop control. May be formulated in a variety of burner start-stop loop cascade control relay 10A is a fuse, relay start-stop control stops the control terminal may be connected to the burner, may directly control the power of the burner. Both constant pressure sensor, water power, fuel, gas pressure set value is detected after the automatic controller opens. Time pressure sensor, water supply, oil, gas, and their detection circuit, alarm and found the problem immediately shutdown flame protection, the controller automatically displays the point of failure, an alarm sounds machine.

What is the relationship between the boiler and the steam turbine and boiler WNS: boilers, boiler WNS What is? Boiler and turbine, What is the relationship? In addition, before the vote bottom steam heating boiler ignition, which has the specific role? These issues are important with regard to the product boiler and keywords, so the following immediately to give a specific answer, so, we also benefit from some of the harvest and inspiration, and to deepen familiarity and level of understanding of the boiler. 1. What is a WNS boiler? WNS boiler, the specific terms of the case, which refers to WNS 200kg vertical fuel steam boilers dealer price, means automatic oil or gas steam boiler. And which uses all wet back horizontal and efficient combustion threaded pipe, and with good insulation design. Thus, in the thermal efficiency of the boiler, it is 85% or more. Moreover, this kind of boiler, also with a reasonable structure, process performance, etc., so, there is a good use effect. 2. Before boiler ignition vote bottom steam heating, which has a specific role? Before firing boiler, a steam-heated cast hearth words, in which the specific role, is as follows: a role: the metal can be uniformly heated, and the temperature difference h Amount love young drum wall thermal stress, thereby shortening the boiler Start Time. Role two: increase the temperature of the boiler furnace, which allows the boiler combustion stability after ignition. Three functions: to improve the boiler water temperature, and speed up the process of building the boiler water cycle. The role of four: to improve economic performance during startup boiler.

The use of central heating hot water boiler is the best choice for winter heating in northern China. Shanxi Province is located in Chang Darrow Heating Co., Ltd. mainly provides heating and post-service maintenance of heating equipment, heating clients involved in enterprises and institutions, office buildings, residential housing and a variety of commercial and other entertainment venues. With the wide blue sky covered Battle of the project, China's gradual increase in the proportion of heating for cleaning, heating, Ltd. Dalong Chang respond positively to the call of national policy, high pollution intensity wishing previously used, low thermal efficiency of coal-fired boiler to replace the traditional use hot water boiler clean fuel. After comparing many boiler manufacturers, choosing the optimal selection, determined and professional cooperation parties do fast boiler fuel boiler cleaning equipment. Providing a fast side 35 MW gas tube hot water boiler (SZS35-1.6-Y.Q) according to their actual needs.

4 tons of 200kg vertical fuel steam boilers dealer price before firing what needs to be done to prepare a deal boiler conduct a comprehensive inspection before Sheung Shui, the water is softened before boiler water filling. 2, Sheung Shui should check whether there is water leakage valve, leaks should be immediately removed when found. 3, the check Sheung water temperature, pressure gauges, water level, no good production of inlet and outlet valves, smoke profile, said shutter is flexible, the flue gas channel is smooth duct, each cleaning doors are tight. 4, before firing coal with water 8-10%.