8t h rice husk fired steam boiler in palm oil mill

Henan daily operation of the gas boiler 1. Contact chemical maintenance, turbine attendant prepare enough desalinated water, oxygen, water passing temperature no higher than the drum wall temperature 50 ℃; Sheung during hot drum wall temperature should be , metal temperature is not more than 40 ℃. 2. After the new installation or repair before Henan Gas Boiler Feed recorded once ministries indicate expansion. 3. Sheung summer time less than 2 hours, at least 4 hours in winter, when the temperature and Sheung drum wall temperature difference of less than 40 ℃ 4. How Henan gas reheater boiler corrosion protection? (1) turbine playing gate , to ensure that a boiler blower, preferably a cross ID fan, two reserved oil gun. (2) open to the air reheater exhaust steam reheater hydrophobic air door and the door be preserved, to be preserved reheater predetermined temperature below 400 deg.] C for steam. (3) controlling the drum water level within an allowable range. (4) to ensure that the chamber negative pressure 50--100Pa, each of the flaps open, baffle for ventilation less than 5 minutes, stop sending, Fan, each of the flaps closed tailgate may be appropriate to accelerate Sheung speed.

Oil-fired boilers include oil-fired water boilers, oil-fired hot water boilers, oil-fired heating boilers, oil-fired bath boilers, oil-fired 8t h rice husk fired steam boiler in palm mills and so on. Oil-fired boilers are boilers fueled by light oil (such as diesel oil, kerosene), heavy oil, residual oil or crude oil. Oil-fired boiler, gas-fired boiler, electric heating boiler is more economical than electric heating boiler and more convenient to use than gas-fired boiler compared with vertical oil-fired hot-water boiler.

Stoke coal-fired hot water boiler operating temperature range of its coal-fired hot water boiler, which operate in Stoke on what specific requirements will be? Its internal plumbing, how much temperature is generally able to withstand? And coal-fired hot water boiler hot water, whether it is secondary energy? These are associated with coal-fired boilers hot water boiler, so the following to explain the good answer, I hope that everyone in to get what you want. 1. Stokes fired hot water boiler operating requirements (1) before Stoke, first baffle opening smoke wind boiler, let the natural ventilation, the time is about 10 minutes. If mechanical ventilation is employed, then over time, for about 5 minutes. In this manner, the boiler furnace and combustible flue gas remaining in the exhaust clean. (2) For the boiler fire, it is strictly prohibited the use of volatile oils, to avoid problems. For Stoke-speed coal-fired hot water boiler, attention can not be too fast, in general, is not less than half an hour. Also, before Stoke, should open the circulating pump, so the job. 2. coal-fired hot water boiler interior water pipes, on the temperature, how many can afford to live? For coal-fired hot water boiler pipes inside this kind of boiler, it could afford, in general, hundreds or thousands of degrees is no problem. And it's also related to the boiler pressure. If the pressure is higher, the higher the temperature in the boiler furnace, so that the internal water circulation faster. 3. coal-fired hot water boiler, hot water, whether it is secondary energy? Coal-fired hot water boiler hot water, which belongs to secondary energy. This is because the secondary energy, which can also be called secondary energy, or artificial energy, primary energy is converted to a processed or derived, such as gas, coke, gasoline, heavy oil and steam and hot water. So, the question, the answer is yes. For coal-fired hot water boiler, the question raised above, as well as specific answers given, so that everyone can be a comprehensive knowledge and understanding of this kind of boiler, so as to carry out well the practical application of their work, and add some expertise. Furthermore, the use of effects and use value of the product to be improved.

Thalia T6, once the promotion listing on the widely recognized by customers, only six months to get the favor of the promotion of a large number of country prefix units directly under the Central Government Offices Administration of the International Tourism Bureau, the SAC Building Materials Service Center, China Research Institute of Standardization, etc. a number of units are selected this product for heating and hot water. Party fast to continue to make breakthroughs, build quality as the goal, synchronized with the national "energy conservation" development policy, to provide users with a real set of green energy-saving, high efficiency and low nitrogen as one of the intelligent boiler equipment.