6t Natural Gas steam boiler Price Commercial Armenia

The partnership, fast boiler for the user responsible attitude to have left a deep impression on our fireman boiler operation is not very skilled, fast deliberately sent a party of professional and technical personnel for our on-site supervision of installation, commissioning and training to ensure that the latter can operate our good boiler fireman. --customer feedback

There are build on the control of emissions of nitrogen oxides boiler in order to achieve NOx emissions from combustion boilers of less than 30mg / m3, reached the world advanced level. Austrian far low nitrogen fuel gas boiler Staged Combustion Process of the invention into three regions in the furnace combustion techniques, primary combustion zone into the small portion of the fuel, the fuel required for the combustion air into the furnace in stages, the air volume of 80% left and right into the main combustion zone, the primary combustion zone of the upper (downstream of the flame) of the fuel injected into the secondary combustion and the formation of Carrying out a reducing atmosphere in the third zone into the combustion air required Further, complete burnout process. To create a discharge for the control of nitrogen oxides boiler fuel and air in order to achieve staged combustion gas boilers achieve emission limits is very basic configuration of environmental protection facilities, comprising an electrostatic precipitator or bag filter, gas boiler efficient desulfurization apparatus, a selective catalytic reduction (SCR) or selective non-catalytic reduction (SNCR) and the like denitration apparatus. All aspects of air pollution sources to install automatic monitoring facilities, 6t steam boiler price commercial armenias and networking with the environmental protection department, install a distributed control system (DCS system), real-time monitoring of gas boiler pollutant emissions. All-premixed combustion technology implementation of a number of Austrian far improved combustion technology after years of build have on the control of emissions of nitrogen oxides boiler fuel and air in order to achieve staged combustion. This technique can be gas boiler NOx emissions chain by 70% -60%. At present, to solve pollution problems of small and medium industrial gas boilers have four energy saving way. First, clean fuels covered by the remaining gas boilers, boiler premix combustion technology implementation of a number of improved combustion technology after years of Austrian far as natural gas boilers, biomass boilers and so on; Second, the rising water boiler technology.

Industrial gas 6t steam boiler price commercial armenia room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger. Industrial gas boilers small volume itself, and these need not be equipped with auxiliary equipment, simply set up between a host and auxiliary room, set on more messy, covering economy. Industrial gas boiler city gas source is generally taken from the intermediate pressure gas supply line, the gas pipeline laying gas sampling point to the boiler room, then according to quell's brand, type and caliber regulating device applications, scheduling outlet pressure range, by metering the put into use. Establish a set fee just gas network tariffs, pipeline fees, hot walks pipeline fee. Gas pipeline network overall cost of capital is the sum of the gas company funds charged to the user, it can be determined depending on the circumstances around the gas company. Usually adopted buried gas pipeline type, buried depth is generally about 0.8m ~ 1.0m, seamless steel pipe can be selected or PE pipes, pipe surrounding sand 15cm ~ 20cm plating, hot water pipe laying relatively simple, somewhat messy steam pipe walks . 3, industrial gas boiler room planning results in the presence of 3.1. Selection of the size of the heat load of the boiler and its expansion tend to choose the boiler capacity, the number of great links. The larger heat load, single boiler capacity should be large. The near future can be greatly increased thermal load, it is also relatively large capacity boiler can choose, it will expand the load thought. The only thought to increase the long-term thermal load, the expansion device may leave the boiler placeholder deployment end in the boiler room, or space left on the total FIG. However, in the practice of project planning, often there is a lack of expansion heat load estimates, constitute improper boiler selection, pre-operation to cause unnecessary trouble. 3.2. Gas boiler gas regulator trivial results generally used in high-pressure (less than 5kPa) and medium voltage (5 ~ 150kPa) trivial. Gas usually before entering the boiler room will arrive this requirement. Now the gas hot water boiler is equipped with a high level of automation subsided, a calm requires the gas pressure is lower, so before further demand into a calm pace pressure boiler manufacturers themselves generally equipped. Gas pressure regulating trivial demands reliable equipment, but on the size of the gas pipeline valve is open due to the gas pressure when scheduling the gas pressure is high or low, and tempering will cause off, start and stop frequently subsided's configuration, thereby affecting the boiler work. 3.3. Gas boiler quality results planning standard gauge, the quality can not be ensured when the gas, should be provided or dust, oil and water, respectively, and a total closed drain valve before the gas main pipe before the regulator device. Most of the oil production plant in the use of oil with anger, it is often said of moisture in the summer cold weather, moisture and light hydrocarbons and other substances containing moisture, condensation will constitute a line blockage, an initiative to quell the flame, impact Heating. 3.4. Chimney condensate results because of the high thermal efficiency of industrial gas boiler, a low exhaust gas temperature, typically 180 degrees, the boiler room planning criteria (GB50041-2008) rules industrial gas boiler room chimney should be reinforced concrete or steel chimneys chimney. Chimney will appear directly in the outdoor summer steel chimney condensate freezing results, constitute icing light rusty steel chimney, would constitute a temporary corrosion, freezing severe affect chimney smoke. 3.5. The amount of air to quell the outcome's when quell Industrial gas boiler is in the boiler room, the air between the boiler must be satisfied the requirements apply to quell the device, otherwise there will be no abundant natural gas to quell working carbon monoxide poisoning.

Horizontal pressure 6t steam boiler price commercial armenia efficiency of a number of cases China basically making impressive work of coal to gas, horizontal steam boiler with a very large reduces dust infected, the same time emissions of nitrogen oxides and other dangerous gases It has been suppressed. Efficiency is a measure of horizontal steam boiler critical navigation, a good number of cases began to say together to study the topic under pressure horizontal steam boiler efficiency. Through the analysis of relevant departments, horizontal steam boiler heat loss from two important parts: the full value is not ideal combustion and exhaust heat waste. Reducing exhaust waste heat should be modified in the tail horizontal steam boiler flue gas heat reuse install, or a more leading boiler condensate recovery system. Full combustion values ​​are not substandard summarized: the traditional horizontal steam boiler selection ejector combustion engine, resulting in air-fuel ratio can not be flexibly adjusted. Many of the non-selected horizontal steam boiler burner blast automatic machines, air-fuel ratio does not lead to over several following cases: air-fuel ratio over the chance of the more important sub-2: An excessive gas stream, having a full cool air is excess heat acting , leading to increased energy use horizontal steam boiler, steam boiler efficiency horizontal weakened; when the airflow is not enough, will produce insufficient combustion, caused by horizontal steam boiler efficiency is reduced.