life natural gas steam atmospheric pressure fire tube boiler manufacturers

Recently, the State Administration of China's market, the National Development and Reform Commission, Ministry of Ecology Environment jointly issued the "Notice on Strengthening Environmental Protection and Energy life steam atmospheric pressure fire tube boiler manufacturerss" (the "Notice"), put forward specific requirements for environmental aspects of energy-saving boiler work.

"Notice" the implementation of the guidance, "the CPC Central Committee and State Council on the overall strengthening of environmental protection and resolutely fight tough fight pollution prevention advice" and other documents, adhere to safety first, prevention first, the five principles of energy saving, comprehensive management implement energy saving boiler from the production, import, sale, use and other aspects of business to post the main responsibility, and strengthen supervision and management of Eng environmental Protection in the "special equipment Catalog" range of boilers, and comprehensively promote energy-saving environmental governance boiler.

First, across the country, in principle, to a new 10 steam tons / hour of coal-fired boilers and, in key areas (and the surrounding areas of Beijing, Tianjin, the Yangtze River Delta region and Fenwei plain) and the rest of the city built the county level and above New District, in principle, to 35 tons of steam / hour of coal-fired boilers.

Second, the new coal-fired boiler emission concentration of air pollutants key areas need to meet ultra-low emission (6% on the basis of the reference oxygen, soot, sulfur dioxide, nitrogen oxides emission concentration of not more than 10,35,50 mg / m) requirements.

Third, the area reserved execution key boiler air pollutant emission limits or special places more stringent emission standards, 65 t steam / hour coal-fired boiler and above all of the ultra-low emissions and energy transformation embodiments, a low nitrogen gas boiler is substantially complete transformation.

"Notice" also stressed the upgrade boilers with energy and environmental conservation requirements. Boiler units to implement the main responsibility for ensuring that the boiler energy efficiency and emissions of air pollutants meet legal regulations, technical specifications and requirements of the relevant standards in China.

Fourth, for the boilers do not meet environmental requirements, and use shall take appropriate measures for improvement, if after rectification not meet the requirements, be allowed to continue to use.

Fifth, the boiler unit to apply for emission permits in accordance with laws and regulations, and to establish their own monitoring system, strict discipline and preservation of the environment management accounting, timely and relevant departments to prepare and submit emission permits implementation report.

Sixth, the boiler unit to promptly take the initiative to report the boiler equipment obsolete, and apply for cancellation of the boiler use registration shall not be obsolete boilers to move equipment or put into use again.

2. Oxygen corrosion

For the biomass fuel boiler pressure parts,the water side is mainly electro chemical corrosion,the fire side (or flue gas side) is mainly chemical corrosion.The oxygen corrosion belongs to electrochemical corrosion, it is mainly caused by the dissolved oxygen in water.At room temperature,the dissolved oxygen concentration is about 9.1mg / L,according to the GB1576-2001 “industrial boiler water quality” requirement ,the rated steam pressure should not be more than 1.0MPa,the dissolved oxygen concentration should not be more than 0.1mg / L,otherwise,it is likely to lead to metal corrosion.

Industrial gas steam life steam atmospheric pressure fire tube boiler manufacturers room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger.

SUMMARY gas steam life steam atmospheric pressure fire tube boiler manufacturers maintenance gas boiler twice monthly maintenance inspection item A. Fuel supply line: a filter cleaning gas oil; ignition gas conduit 2 airtightness inspection; 3 checks whether the flow line... B. inspection of the instrument: a flushing water table; 2 Syphons flushing; valve experiment. C. Check burner:.... The flame detector (photocell) cleaning the light receiving surface; second inspection oil pump pressure is normal; 3 checks the combustion flame is normal; 4 check burner, the burner sound is abnormal; 5 Cleaning revolutions cup; 6 o'clock washing water rod. . Check D. Intake system: a washing water filter; 2 reaches rated pump head and flow; 3 a check valve is working properly... E. daily drainage tank and the cleaning debris. Water quality testing, water testing furnace. F. Check the combustion consumption is normal. Every three months in addition to the maintenance items plus the inspection item inspection items: Electric Part A: 1 line is loose aging, failure; 2 check the reliability of electrical components, overload; Protection relay 3 is normal; B.... open soft low deactivation tank valve exclude sludge; C to test the boiler and then point interlocking means: 1. low water position; overpressure 2; 3 flameout 4. The exhaust gas temperature ultrahigh; D. et quality tobacco. detection: analysis of tobacco smoke constituents comprising temperature detecting tail, combustion is working properly checked. E. burner and boiler cleaning outer cleaning. Paul A. large projects each year hosts a body part of a comprehensive clean-up tobacco pipes, water pipes, front and rear smoke box, part of the furnace and the burnout chamber and smoke tubes ash collection. 1. inspection openings comprehensive inspection hole hand hole, manhole sealing soundness, and timely replacement of defective seals. 2. The overall comprehensive testing instruments, valves, comprising detecting pressure gauge and safety valve, the pressure controller and the electrode level controller tuning. Part B. burner: Burner cleaning turn round cup, ignition means, filter, pump, motor and impeller systems, throttle link means to add a lubricant. Re-awarded for combustion testing. C. access control section detecting electrical components, control lines, the control box clean ash collection, each control point is detected. D. water supply system maintenance water treatment plant to check whether water quality standards, a comprehensive clean soft water tank, to check the functioning of the pump and lift, clean check valve spool and so on.