oil boiler fryer for potato chips

Burner and flue installation and electrical installation and the fuel supply system of the burner 1, burner 1) before installation read "burner manual", according to the installation requirements. 2) Burner mounting flange, the middle requirements, to ensure the burner to the boiler fryer for potato chips flue gas does not leak at the interface. 2, the installation of fuel supply system (see schematic) Note: To prevent a fire caused by generation of static electricity in the fuel tank, the tank should have a good grounding. 1) supply system tank top tank top-feed system suction recommended distance between the back plane and the tubing inside diameter of the oil pump axis, the total length of the suction pipe Hm, m, no greater than DL6-34DL40-75DL100-250Di = 10mmDi = 14mmDi = 16mm0.51.03030401.535452.03535452.540503.0404050 Notes: (1) when there is an elbow or valve on the suction pipe, each of the length of the suction pipe to be minus 0.25m. (2) Di recommended internal diameter suction pipe and return pipe. 2) the distance between the bottom of the tank bottom of the tank supply system supply system pipe inner diameter recommended oil pump axis and a plane, the total length of the suction pipe Hm, m, no greater than DL6-34DL40-75DL100-250Di = 10mmDi = 14mmDi = 16mm1.03030401.535452.03535452.540503.04040504.045 Notes: (1) when there is an elbow or valve on the suction pipe, each of the length of the suction pipe to be minus 0.25m. (2) Di recommended internal diameter suction pipe and return pipe. 3, gas pipe installation requirements Burner gas line itself has been connected, the intake port, the intake pipe bends should be minimized and good sealing performance requirements, to prevent leakage. (Iv) a chimney installation, to prevent leakage, the leakage of smoke, to prevent smoke inhalation chamber. 2, a vertical mounting, a right angle bend bends should be avoided. 3, the top of the chimney must be water-resistant measures. (E) mounting a power switch with electrical connection box 1, the power switch should be considered easy to operate, away from heat, fixation, meet the design requirements. 2, the use of 220V (380V), 50HZ power source, and a ground line. 3, voltage instability in the region use, should be safe regulators. Or affect the normal operation of the combustion engine. 4, the power cord to the electrical box must be connected in strict accordance with the requirements, otherwise, there will be dangerous!

Zhejiang Yiwu issued the "Yiwu winning Blue Sky Battle 2019--2020 action plan." Plan to improve air quality, enhance people's happiness index target put forward concrete measures of implementation, as follows.

1, vigorously develop clean energy. In-depth implementation of the "creation of a national clean energy demonstration Zhejiang Province Action Plan (2018-2020 years)" "Zhejiang three-year action plan for natural gas development (2018-2020 years)" and "Jinhua" Thirteen Five "Renewable Energy Development planning". According to "gas of the gas should be '' should the electric power" principle, energy companies actively guide clean energy alternative embodiment, in 2020, the proportion of the power in the final energy consumption of clean energy consumption accounting for the higher level, the city gas consumption amounted to 150 million cubic meters.

2, control total coal consumption. Strengthen energy consumption and total energy consumption intensity dual control, strict new coal project access, new (modified, expanded) construction project coal consumption reduction of coal instead. By 2020, the city's total coal consumption by 2015, down from more than 5%. Continue to promote alternative energy coal and oil, replace reached the national requirements. No new 35 t steam / hour or less polluting fuels boilers. Strengthening coal quality control, promote clean coal utilization. Before the end of 2020, clean coal utilization rate of 92%, the proportion of electricity than to accept deliveries in 2017 significantly increased.

3, to carry out comprehensive improvement of coal-fired boilers. Increase efforts to eliminate small coal-fired boilers, the urban built-up area basically eliminated tea furnace, operating a stove, grain storage and drying equipment, coal-fired facilities; basically out of 10 steam tons / hour and 35 steam tons / hour coal-fired boilers. 35 t steam / hour and more polluting fuels boilers completed ultra-low emissions and energy transformation. Low nitrogen gas boiler basically completed the transformation. Strict control of the new urban area of ​​biomass boilers. Biomass boilers should be dedicated boiler, blended prohibit other fuels such as coal, and other supporting efficient dust bag embodiment, non-coal, oil, natural gas-fired boilers and the like directly Burning biomass briquettes.

4, the positive development of central heating. Cogeneration units to increase the technological transformation efforts, speed up the heating pipe network construction, improve the heating capacity and the full release before the end of 2020, phasing out the cogeneration district heating pipe network coverage and high pollution coal-fired boilers in the range. In the area where no cogeneration district heating conditions, a plurality of existing small coal-fired boilers, an alternative construction of large-capacity coal-fired boiler in accordance with the principles of the reduction or the equivalent.

5, deepening the construction of high-pollution fuel combustion zone ban. According to "adjust Yiwu prohibit the use of polluting fuels sales area plan" (Yi Zheng Ban Fa [2018] No. 180) documentation requirements, a comprehensive investigation and eliminate high-polluting fuel facilities within the city, to ensure that no dead ends, no blind spots, Finish high pollution fuel combustion zone ban burning building before July 2019.

6, improve energy efficiency. Vigorously develop, promote energy efficient technologies and products to achieve key energy industries, energy-saving equipment standard full coverage. New energy-intensive projects per unit of product (output) energy consumption should reach the international advanced level. Local conditions to improve building energy efficiency standards, and increase efforts to promote green building, city guide implementation of green building standards for new buildings. Renovation of existing residential buildings to promote energy conservation, encourage rural energy-saving housing.

CBM low pressure steam boiler fryer for potato chips types

WNS series oil/gas low pressure steam boiler

Fuel oil (heavy oil), natural gas, dry gas, gas and coal as a boiler fryer for potato chips fuel, in order to prevent an explosion or detonation furnace in operation, the wind must be at least 5 minutes before ignition; ignition should be given a torch and is not permitted heat ignition furnace; furnace temperature operation combustible material is not too high, blast, to balance with the amount of the wind.