Energy Saving steam boiler 2t Fully Automatic Philippines

Energy-saving technical measures for heating operation of hot-water boiler

(I) Pipe insulation

Which uses common knowledge on maintenance and gas hot water boiler there?

Gas hot water boiler by the pump, burner, heat transfer equipment, automatic control of electrical and complex mechanical structures in one of the high-tech a hot water supply, heating, with heating, hot water conduit system is correct or not will greatly affect the correct connection, installation, commissioning, operation and maintenance and other safety performance and service life.

This 3 ton food factory natural gas boiler is a ZG boiler wns series fire tube boiler. It adopts a wet back three-return structure. The natural gas is fully mixed with the air through the burner, completely burned in the corrugated furnace, and the first chamber is turned into the first The return pipe is turned to the second return pipe and finally enters the rear smoke box and is discharged by the chimney. The boiler is equipped with a condenser and an economizer to reduce the exhaust gas temperature, reduce heat loss, and improve boiler thermal efficiency.

Jilin Province is located in northeast China, colder winter. Jilin Province is the autumn and winter air pollution problems are most acute period is the peak period of fog and haze. To reduce the frequency of occurrence of fog and haze, to reduce emissions of air pollution, according to "implement the central Jilin Province Environmental Protection Inspector feedback reform program", Jilin cities to carry out the 2018 autumn and winter special law enforcement inspection of non-electric coal-fired boilers. Specific implementation of the program as follows.

2018 autumn and winter non-electric coal-fired boiler special law enforcement inspection action plan

First, the objectives

Through the "2018 autumn and winter special law enforcement inspection of non-electric boiler coal" action to further increase the intensity of emissions of air pollutants such as excessive penalties for violations combat, urge local governments and environmental protection departments to effectively implement the "Jilin province to implement the central environmental protection inspector feedback reform program, "Forced enterprises to speed up 10 tons of steam coal-fired boilers small and out of more than 20 tons of steam and non-electric coal-fired boiler pollution control facilities upgrade progress to ensure stable discharge standards.

Second, the scope of the inspection

Cities (prefectures) and Changbai Mountain Administrative Committee, Meihekou, Gongzhuling City, Hunchun.

Third, check the time

2018 Nian September 1 to November 30.

Fourth, inspection methods and content

Cities (prefectures) and counties under the jurisdiction of Changbai Mountain Administrative Committee to set up inspection teams to units in the area to take a cross peer review mode, Meihekou, Gongzhuling City, Hunchun to self-oriented.

The principle of mutual cross-check on the environmental violations found, the city's environmental protection departments at all levels in accordance with "should check to make investigation, should make a fine penalty, should be moved to make-shift" of errant given time out of the boiler, not dust removal facilities renovation no construction of desulphurization facilities are not required to install, networking, using automatic monitoring equipment, excessive discharge of pollutants and other acts take full advantage of "environmental law" and supporting measures to implement daily basis penalties, limited production shutdown, sequestration, administrative detention measures to deal with.

Focus on examination of the following:

(A) the progress of 10 tons of steam coal-fired boilers little out of work. According to "implement the central Jilin Province Environmental Protection Inspector feedback reform program," according to the time limit set by local governments, the progress of the phase-out of coal-fired boiler 10 tons of steam since 2014, the province's illegal 1570 newly registered units to be checked.

(B) more than 20 tons of steam coal-fired boiler non-electric dust removal, desulfurization facilities upgrade progress, automatic monitoring equipment installation, networking, usage. By ShengTing 6, July scheduling, the current to complete the rectification stage 717, stage 108 does not start the rectification, the rectification is 277, automatic monitoring equipment table 140 is not installed, the slow progress of the rectification. To complete the transformation around the boiler on-site verification, focusing on inspection facilities dust removal, desulfurization facilities upgrading and installation of automatic monitoring equipment, networking, usage. Percentage being modified, check the current progress of the major transformation of the situation, progress of the project, the time frame for completion, safeguard measures taken, it requires the use of boiler units issued commitments. For failure to start the transformation, to identify the main reason for not starting. If we do not transform the way in which the pin number to take all necessary construction and renovation tasks must be completed in accordance with the requirements of 30 September.

(C) boiler emissions standards. To install automatic monitoring equipment to monitor them than to confirm the validity of the data. For failure to require the installation of automatic monitoring equipment, shall be punished in accordance with relevant laws and regulations, at the same time supervisory monitoring, to determine whether to achieve a stable discharge standards.

Fall and winter heating season is the peak of Jilin Province, to ensure the normal heating units, we must also pay attention to boiler problems in the process of environmental protection. For the high-emission, high-polluting coal-fired boiler and other fuel boiler, to be banned or corrective action.