Large capacity industrial gas boiler

When the 40 tons SZS series gas and oil fired large capacity industrial boiler is running, the fuel enters the burner from the external air source, and automatically generates a high temperature flame through the automatic adjustment and automatic ignition function. The front end of the furnace enters the convection heating surface on the upper side of the burnout chamber, and then enters through the upper part of the front smoke box. the second part. The convection heating surface exits the boiler from the rear of the rear smoke box and is vented to the atmosphere. The saturated steam is generated by heating, and the working fluid is output from the main steam valve to the operating system.

Tai Chi, Jiaozuo City, Jiaozuo City Sports Center is one of important sports infrastructure, a total area of ​​11.73 hectares, held several international events. With strict management in Henan Province for air emissions of pollutants, Jiaozuo City, also launched the governance of coal-fired large capacity industrial boilers, thermal power and other equipment. Jiaozuo Sports Center actively cooperate with municipal workers, took the lead from coal to gas activities, the serious pollution of the original extent of coal-fired boilers to replace gas boilers. Gas boiler cleaning binding understanding of the market, to achieve cooperation with the finalization fast boiler by providing a fast side 2.8MW integrally condensing gas hot water boiler (WNS2.8-1.0 / 95/70-YQ), it is used to Sports Center provides heating and hot water.

Method for safe operation of steam large capacity industrial boilers steam boiler before use, must be checked for damage of the insulating layer, to check the burner is operating correctly, and to check the position of the opening degree of the valve to ensure it is correct. Must be checked for automatic control instruments and equipment safety equipment accessories, equipment, in order to comply with the requirements. Check item prior to ignition of the steam boiler: open valve before oil circulation pump, oil heating valve is opened, adjusted reasonably high level of the tank, the gas pressure is determined before the natural gas burner ignition must be within the range, the power good . Refers to the operation of the steam boiler is refluxed pressure activated device circulating pump, the circulating pump outlet, inlet, outlet, and the system, it is in the normal range. Circulation pump run for 30 minutes. After the stability of the system, the next step. Open the gas tube steam boiler manual valve, button start-up burner, natural gas burner into the furnace, and then the ignition, the flame remains stable, i.e. is in a safe operating condition. In the firing process steam boiler, if you accidentally quenching phenomenon occurs, the device will automatically interlock burner saver appear. It must be promptly cut off the natural gas pipeline to start the furnace purification. Replacement of the residual gas in the furnace and closed. The system load requirements, temperature requirements and thermal oil outlet, the burner can automatically adjust the size of the fire source.

Recently, I saw a news about oil gas fired power plant large capacity industrial boiler in Nigeria. The article talking about the first phase of Nigerian gas fired power plant inaugurated.