8th szs gas hot water boiler in palm oil mill

After the chemical plant boiler installation inspection What: What are the chemical plant boiler installation inspection and risk prevention measures after inspection of chemical plant boiler installation there is worth in-depth inquiry, as this real impact on the quality of the boiler installation, while for people's personal safety and the development of the industry have a certain influence. Only in-depth exploration stage after inspection of industrial boiler installation, in order to understand where the test content and methods to fully play the role of these test methods, and the timely detection of hidden dangers, do preventive work. To clean up, while regulating their own operation behavior. After the chemical plant boiler installation inspection of the basic content of 1, test environment and ensure the safety of operations. It is well known in industrial boiler construction process plays an important role, is an integral part of one of the devices, it is necessary to strengthen the quality inspection for the boiler, in particular post-installation testing more critical. Therefore, the basic content of inspection it is necessary to conduct in-depth analysis. First, check to ensure replacement parts. 2, the overall test of the pot. After checking for the environment and the safety of the operation, we should consider checking the overall quality of the boiler inspection. Checks the contents of this section, the main seams comprising the drum, the interface and the gas tube boiler, the liquid leaks and the like. In addition, the bottom of the boiler, also have in-depth and detailed examination to ensure that the overall quality of clearance. 3, test water quality management and water treatment equipment. Test water quality management and water treatment equipment is also crucial part, this is an important test session, because if this part of the problem, most likely boiler erosion occurs, so that the life of the boiler equipment decreased, this is not conducive to the smooth development of production work, it will also affect the actual benefits. Therefore, for this part of the examination will do the painstaking, careful, in particular, to strengthen the sampling and testing for water quality, see if it meets the relevant requirements. 4, testing for chemical plant boiler annex. Fan, oil level indicator, pressure gauge, thermometer, locks and other equipment. Boiler accessories. For these boiler accessories require regular inspection and examination, at the time of inspection should pay attention to these accessories and the device is fully functional. 5, test for the chemical dust and smoke desulfurization apparatus boiler. In order to promote environmental protection, industrial flue gas to reduce pollution and waste on the environment, the country has long been on flue gas emissions and wastewater imposes strict requirements. Thus, in the conventional detection boiler, flue gas desulfurization and dust removal means for detecting is essential.

To implement the central authorities on the construction of ecological civilization and major decisions and plans, "the Jiangsu provincial government office on efforts to reduce coal year 2019 work" (Su Zheng Ban Fa ﹝ 2019 ﹞ 45) requirements, carry out the "263" special action, continued reduction of non-electric industry (including captive power plant) coal consumption, in the middle of this month, Nanjing people's government Office issued the "Nanjing 2019 work program minus coal." Compared with the 2016 base, the city of Nanjing in 2019 non-industrial enterprises in the coal power industry regulations reduction target is 3.88 million tons, 13.3 million tons less than total control.

"Plan" clearly requires, Nanjing will further reduce the implementation of industrial coal, increase the elimination of backward production capacity and inefficient excess capacity Yajian efforts to accelerate the implementation of the chemical industry regulation to enhance and accelerate the implementation of Nangang, Meishan Steel coke production capacity out of work year after year, to speed up eliminate backward production capacity of coal, cement clinker production capacity in an orderly exit.

At the same time, to promote structural reduction of coal, the implementation of ecological and environmental protection requirements of the Yangtze River economic belt along the Yangtze River to promote the orderly relocation of key enterprises and industrial transformation and upgrading, the city's coal consumption structure and strive to achieve a fundamental change; accelerate the aging coal-fired non-compliance unit outage work.

According to the requirements, "plan" put forward, Nanjing will also strengthen reduce coal progress warning. Less coal combined monthly schedules, reducing the monthly publication Coal risk warning, the cumulative assessment carried out in accordance with the red, yellow and green three levels. Less progress of coal coal consumption does not exceed a custom schedule for the green light; cumulative coal consumption over a predetermined schedule within 2% of the yellow light, will be issued urge communicated, to be a reminder and a warning; the cumulative coal consumption over a predetermined plan of 2% or more for the red light, will be relevant area (park) conduct interviews, and urge them to implement technical, administrative and other measures to encourage companies to reduce coal consumption over consumption.

4 tons of fuel boiler Product description: 4 tons of fuel oil boiler is heated by a burner, fuel atomization effect, fuel combustion, can not see the chimney smoke, so the green fuel boilers, energy efficient. After spraying fuel through the burner into the furnace in the atomized droplets, and easily mixed with air and the rapid combustion heat flash. Compared with coal-fired boiler with the same capacity, and parameters, which furnace volume heat intensity may be increased about twice. But to reduce the thermal load of the burner zone, in order to avoid overtemperature waterwall tubes in this area, so the furnace volume is only reduced by about 1/3. Because the ash content of fuel oil is small, without slagging in the convection heating surface, it allows the furnace exit gas temperatures as high as 1300 ~ 1350 ℃, and narrow a pitch between the convection heating surface to increase the flue gas velocity, thereby increasing the heat transfer coefficient of the heating surface, the heating area savings and steel. Features: 1, the boiler burner automatic combustion control in accordance with instructions, stop, separate control box has a number of security, performance, security and stability, low maintenance. 2, the inner fire tube inserted spoiler retardant, smoke slow speed, to strengthen the heat exchanger, combustion heat conducting large extent to the water, the low temperature flue gas discharged from the smoke chamber, reducing heat loss and save fuel. 3, the water level sensor water level real-time monitoring, to continuously monitor the water level is normal furnace. While controlling the temperature and replenishment level sensor solenoid valves, the boiler water may be continuously supplied. 4, centrifugal multi-layer insulation glass wool, steel for packaging famous white color, heat loss, anti-rust appearance. 5, the product is widely used in hospitals, schools, hotels, hotel, bath center and other enterprises. Boot check: 1, various instruments, whether the instrument to confirm the adequacy of fuel tank, and the inlet valve is opened. 2, confirm the soft capacity and the water tank boiler water quality meets the requirements of the main valve is opened and boiler feed water inlet valve. 3, rotation of the oil filter to remove debris. 4, drain the remaining water in the boiler, while the opening operation of the low level alarm and chain. Boiling furnace process: 1, before the new boiler furnace should be boiled to remove impurities and dirt inside the boiler, or trisodium phosphate soda cooking oven may be employed to prepare a 20% concentration was added furnace (not note the solid directly into the furnace). 2, after closing the steam valve and the water table Hancock, opening the vent valve according to the procedure stoker firing power may be low heat and temperature rise at the beginning, when there is moisture in the furnace, close the vent valve when the valve is discharged from the vent, the furnace pressure is raised to be at around 0.1MPa, the boiler should be checked for leakage and various accessories such as fittings, if any leakage should be promptly fastened. 3, when the pressure in the furnace reached 0.3MPa, the normal shutdown program shutdown, let the furnace pressure decreased to 0.1MPa or less, the drain valve open, give up all the water in the furnace. 4, opening into the hole, rinsed with soft water inside the boiler until the washing water coincides with the degree of acid-base soft water, after closing and opening into the hole Hancock water gauge. 5, after the completion of cooking stove washing, all restore normal operation, before normal operation stoker.

Vertical gas oil fired 8th szs hot water boiler in palm oil mill in the process of buying you buy gas hot water boiler, the professional encounter problems. Here, the authors analyze them with you. Gas hot water boiler is the number of how many RMB yuan required by the gas hot water boiler, burner desired, RMB number, random (circulation pump, control panel, valves) how much RMB synthesis. To choose how many factors renminbi gas hot water boiler needs, effective include: Name mutually exclusive, factory production, production capacity methods, testing, program design, selection of steel and so on. Among the most important factors are as follows: productivity source manufacturers ㈠- production plant productivity, will definitely be selected, quality goods. Due, a productive unit, not only to enjoy more the proportion of the market, accounting for a myriad of experience. Outside, In addition, the authority of product design technology. The size of the design level, quality of goods and the pressure is quite big. Directly or indirectly affect the reliability of goods subsequent use, energy efficiency, credibility, and good operational level. Choice of 2 steel steel grade specifications, is the cornerstone of goods production capacity. Excellent formal standard steel, sealed a solid effect of the gas hot water boiler ensured. Unsafe or non-standard steel plate used in many small brands, will cause gas hot water boiler of goods, poor reliability, high energy consumption, in addition to this there is a certain credibility inconvenience, with the operator, for example, even if modest framework procurement costs, but Pearl bomb bird. Ⅲ- automatic production capacity level of gas hot water boiler developed manufacturing time in, fuse, rolling, cutting, the most important method. Of these three methods, if you compare it certainly is artificially controlled, fully automated development, highlighting strengths are distinct. ISO due to production, have increased accuracy, minimal deviation. This is also a big name gas hot water boiler of goods, an important factor smaller than a name. Due to its production capacity last, but then closer to the level of program design, good success reached formal standard setting. Inspection procedures Ⅳ- some factories in China, there is very little gas hot water boiler through rigorous goods, factory technology testing. Stress testing is complete, the goods as excellent. This is definitely working methods fulfill responsibilities very seriously. Excellent test program, comprising at least about: Stress Test experiment, experiment inert gas, the test weld seams, the sealing of the test, there is a trial period cycle. Indispensable, indispensable. Only in this way will ensure excellent goods to the operator, so that operators in the subsequent use, avoid substandard goods produced, pressure to the operator's normal production and operation. Grade ⑸- repair maintenance of most of the smaller brands, there is very little maintenance repair and maintenance. Sale are entrusted to act as agent. However, most of the agents, and there is no authoritative professional strength team. After the failure to produce, will have repeated prevarication, or simply can not solve the consequences. Above, summarized, gas hot water boiler how much the yuan, the stress factors. Now normally, there are outstanding, how many yuan sophisticated gas hot water boiler needs goods, plus gas hot water boiler burner, most in per ton, $ 100,000 or so.