Industrial boiler Distributor 6 ton Bhutan

Maintenance of content necessary evaporation industrial boiler distributor 6 ton bhutan boiler 1t / h or less, operation and maintenance once a month; evaporation over 1t / h (including 1t / h), the three-month operation and maintenance time. In practical applications, due to lower equipment failure rates Zheng pot, high-quality selection, so the vast majority of customers choose maintenance once every six months or even a year, following is the main content of boiler maintenance: 1, the water table (1) Check the water level table cock, remove leaking steam leakage phenomenon (2) check the lighting apparatus 2 to repair the damaged parts replacement, a safety valve (1) should be no leakage check valve (2) check the seal should be no damage, exhaust pipe 3 should be smooth, pressure gauge (1) check the joints trap and three-way cock, the leakage clearance (2) is rotated three cocks inspection gauge pointer should be restored to zero (3) should be smooth trap 4, and the valve conduit member (1) and the outer surface of cleaning up painting, repair insulation (2) access line, and a drain valve leakage phenomenon vapor (3) replace the packing, gaskets 5, pipe tobacco and tobacco smoke tank cleaning pipe, smoke box, 6 to reduce smoke flow resistance, boiler, furnace walls, furnace and other (1) cleaning, inspection drum surface free of grease, dirt ash, no deformation, bulge, crack, no leakage welding, weld without cracking (2 ) check the furnace, remove slag, repair damaged Fire bricks, repair of damaged grate and the transmission member (3) access to the coal, slag and replacement of consumable means (4) inspection manholes, hand holes, the leakage clearance (5) changing the water washing.

14 MW WNS condensing gas-fired industrial boiler distributor 6 ton bhutan for universityRemin University of China is the first newly established formal university founded by the Communist Party of China. It is a comprehensive research-oriented national key university with humanities and social science as the mainstay. Until September 2017, the school has 3,315 teachers and 22,749 students. Facing such a large group, domestic water and heating in winter are very serious and ignorable projects. Through the bidding activities, three 14 MW WNS condensing gas-fired hot water boilers and two 6 tph WNS condensing gas-fired steam boilers of Zozen Boiler were successfully awarded. For this series of boilers, Zozen Boiler adds condenser to the end of flue, which can recycle the flue gas and increase the thermal efficiency of the boiler to more than 98%, thus save operating costs.

10 t expect gas steam industrial boiler distributor 6 ton bhutan from the factory production process: 10 tons of gas steam boiler output 10 tons per hour high-temperature steam, for use on large-scale industrial production of the more common. Everyone in the purchase of the boiler, I do not understand a lot of time due to the boiler production process, easy to be deceived bad salespeople. Today, fast boiler will unveil the manufacturing process of the boiler, as we talk about, the main process gas steam boiler expect from the factory.

Expected by the end of this year, Jiangsu Province, the province will complete the ultra-low emissions below 100,000 kilowatts coal-fired units. It's Jiangsu Province, following more than 100,000 kilowatts ultra-low emission coal-fired units in 2017 renovation, energy-saving and environmentally friendly coal a "first in the country."

According to statistics, Jiangsu Province in energy consumption, accounting for over 60% of coal, which accounts for coal and coal consumption sticking. Industrial emissions of air pollution is the bulk, ultra-low emission power plants, clean coal is to enhance efficiency, promote air pollution control "top priority."

According to the deputy director of Jiangsu Provincial Development and Reform Commission Energy Bureau, Jiangsu Province coal units in the national energy conservation program first started, the fastest progress. In the coal transformation "mentioned standard extended surface" advancing, Jiangsu Province by the national requirements of more than 300,000 kilowatts stand-alone, single expanded to more than 100,000 kilowatts, 100,000 kilowatts this year covering the following units. In order to promote energy saving coal-fired power plant, Jiangsu Province, also the first start price subsidies, together with local award and subsidy, enterprise since the vote, five years invested a total of 23.4 billion yuan.

Price subsidies coupled with strict control of environmental protection, promote the province of large-scale coal-fired power plants, clean production. By the end of last year, Jiangsu Province, a total of 225 sets of 73.6 million kilowatts coal units to complete the environmental transformation. Combined with the transformation of coal to the end of last year, out of sync, Jiangsu Province, small thermal power units 2.95 million kilowatts.

Coal transformation of wide coverage, high standards, emissions dropped significantly. Emissions of coal dust, sulfur dioxide and nitrogen oxides three major pollutants, Jiangsu line monitoring mean values ​​of 2.3 mg / cubic meter, 18.5 mg / cubic meter and 35.5 mg / cubic meter, effective domestic optimal. Transformation, Jiangsu Province, to proceed with flue gas heat recovery, central heating, shutting down small thermal power, 25.7 million tons of standard coal last year to save.

Significantly reduce the amount of coal emissions at the same time, the province "Blue Sky index" every year. According to the Provincial Department of environment statistics, since 2013, the province PM2.5年均浓度连续 six years continued to decline, good days than from 60.3% in 2013, rising to 68% last year.