boiler Energy Saving Agent Price 4t Brunei

1149, what are the relevant personnel requirements and different boiler energy saving agent price 4t brunei pressure and temperature Description: The boiler of this important site of learning products, the following will continue its work to learn, because this is all hope, this can be a better understanding and about this site products and increase their expertise. So, since good for us, then, what reason not to be taken seriously and conduct it, rather than wasted such a good learning opportunity. 1.10 tons of boiler, its consumption of natural gas per hour, how much is? In addition, different boiler, it is equipped with auxiliary, it is the same as you? 10 tons of boiler, which is on the calorific value, the equivalent of 6 million kcal. Therefore, if the natural gas heating value is calculated according to 8600 kcal, then, an amount of gas consumed per hour, is about 700 cubic meters. And on the issue of two, whose answer is NO, that is, different boiler, it is equipped with auxiliary, it is not the same.

However, water-tube boiler energy saving agent price 4t bruneis are also manufactured in sizes to compete with shell boilers.

Small water-tube boilers may be manufactured and assembled into a single unit, just like packaged shell boilers, whereas large units are usually manufactured in sections for assembly on site.

Hot water boiler energy saving agent price 4t brunei heating industry is our essential equipment, gas hot water boiler water provided by the party fast flotilla, high thermal efficiency direct savings on fuel costs of inputs for our company, the intelligence facilities let the boiler run more convenient and effective to reduce the labor intensity of fireman people. --customer feedback

"Safe distance" boiler energy saving agent price 4t brunei is how much? Do not let the boiler struck a "spark"! For this special boiler equipment, its installation and boiler room are big construction projects, this is not like we normally use home appliances, on the need to consider the question of how or where to install. A safe distance from the boiler in the boiler room is how much? Safe distance from the boiler and the workshop is how much? Security between the boiler room and the building What is the distance? These data collection is good, boiler go safe "start." A boiler in net distance between the boiler and the boiler room safe distance from the building interior walls of the boiler room, fireman space should be left operating, maintenance and arrangement of auxiliary equipment. 1, spacing steam boiler furnace 1 ~ 4t / h, hot water boiler 0.7 ~ 2.8MW, not less than 3.0m; steam boiler 6 ~ 20t / h, hot water boiler 4.2 ~ 14MW, not less than 4.0m; steam boiler 35 ~ 65t / h, hot water boiler 29 ~ 58MW, not less than 5.0m. Note: When replacement boiler tube furnace, blast furnace spacing should meet operational requirements. For 6 ~ 65t h steam boiler / hot water boiler 4.2 ~ 58MW when setting glue instrument control chamber furnace, boiler to the front end of the control chamber can be set to meter spacing 3m. 2, the channel spacing steam boilers and rear side 1 ~ 4t / h, hot water boiler 0.7 ~ 2.8MW, not less than 0.8m; steam boiler 6 ~ 20t / h, hot water boiler 4.2 ~ 14MW, not less than 1.5m ; steam boiler 35 ~ 65t / h, hot water boiler 29 ~ 58MW, not less than 1.8m. Further, when it is desired sootblowing, stirring the fire, slag, installation or maintenance spiral Cleaner, channel spacing should be able to meet the requirements of the operation. Also add that the distance between the highest and the lowest operating point of the boiler structure boiler room at the top of not less than 2m. Second, no uniform workshop boiler is connected between the boiler room and a safe distance from the production plant, the two must be independent, typically 5 meters. Third, the boiler room and a safe distance from buildings 1, a safe distance from the boiler room and a class of high-rise building is 15 meters: 9-16 refers to a class of high-level layer (up to 50 m height); 2, boiler room and multi-residential buildings the safety distance is 13 meters: 2-9 refers to multi-storey buildings layers residential and other civil construction height does not exceed 24m; and 3, a safe distance from the boiler room to the podium before is 10 meters: the podium with senior connected height generally less than 24m. Note: the outer skirt means high-rise building subject projection range, the height of the building is connected to high-rise buildings of no more than 24 meters annex.