Dealer boiler Energy Saving 20t Malaysia

Anyang City Power Supply Bureau as a unit in charge of the sale of electricity in Anyang City, in the choice of the dealer boiler energy saving 20t malaysia is more cautious. Based on our understanding and trust, choosing our split condensing steam boiler. Anyang Power Supply Bureau responsible person to us feedback, provide fast side of the boiler with the rest assured, product design everything, we believe that the fast side of the boiler can be used for more than 10 years and even 20 years. --customer feedback

Greenhouse heating dealer boiler energy saving 20t malaysia

With the development of science and technology, people's living standards are increasing. In the winter of decades, it is really difficult to eat fresh vegetables and fruits. But now, fresh fruits and vegetables have become a daily product in the winter. This is attributed to the development of greenhouse cultivation. Greenhouses planting require a variety of heating equipment, and the application of various heating boilers also promotes the development of greenhouse cultivation.

Questions about the gas hot water dealer boiler energy saving 20t malaysia HVAC ducts to resolve the current situation in perspective, the upcoming winter, hot water boilers are mostly used for heating use, then the problem of gas hot water heating projects users are more concerned also have HVAC ducts problem, do the following small series bring you its a simple understanding. HVAC is actually heating boiler pipes and ventilation ducts of the boiler plan, compare these two key issues is the boiler installation. So for this time it is necessary to select the particular look. First, to ensure its tightness, followed by the same wind resistance, noise as small as possible in order to preference, easy to install at the time of installation, less is more important point of connection, it can save a lot of trouble. In short, the installation process, it should be a reasonable plan, in addition to know that it is mainly soda HVAC piping pipeline, its thickness and size are variable, but must grasp the actual situation .

On issues related to hot water dealer boiler energy saving 20t malaysia circulating water system of a hot water boiler circulating water system shall have the following to prevent the hot water circulation pump suddenly stopped, furnace water vapor and water hammer protection measures: 1 into the circulating pump, there is provided a check valve between the outlet pipe of the bypass pipe, which should be similar to the diameter of the mother tube, and the bypass pipe cross-sectional area of ​​not less than 1/2 of the cross sectional area of ​​the main pipe; check the flow direction of the pump should be consistent with the direction of flow. 2. Set weight of formula inching valve in the inlet pipe section of the circulating pump, drain pipes which overpressure can open the access to the tank or drain. Second, hot water boiler circulating water system is also designed to meet the following requirements: 1 should be mounted on each cut-off valve or valve outlet pipe boiler, boiler feed water, the supply should be located on the water shut-off valve and check valve. 2. The hot water boiler is running in parallel, the control valve to be provided on each boiler inlet, so that the deviation of parallel boiler water temperature does not exceed 10 ℃. 3. The portion of the high boiler outlet pipe should be installed and easy accumulation of gas and an exhaust gas collection means, not less than an exhaust valve DN20.4. Low system and the lower recesses, should be arranged drain valve and drain pipes . The hot water system should be water pipe back to facilitate the installation position Qingtao decontamination, before and after the decontamination and closing the valve should the pressure gauge, and a small charge of 1 to 2 ratio of the bypass pipe. 6. The boiler should be provided with a plurality of trap and sump for hotspots, catchment trap and drain valve shall be arranged, thermometers, pressure gauges.