For Sale High Efficiency oil boiler Azerbaijan

How to prevent running back pass secondary combustion 1, 30% of the rated for sale high efficiency boiler azerbaijan to deal with the amount of purge air before boiler ignition; the boiler must be 30% of rated air flow purge less than 5 minutes after the boiler fire, or allowed to boiler re-ignition. 2, fine-tuning the boiler and combustion systems pulverizing system operating conditions, to prevent incomplete combustion of oil and coal accumulating on the tail heating surface or flue. 3, boiler burning oil, adjust the proper air flow, fuel flow, confirming good gun oil spray, burning completely. If you find a bad oil spray gun should be discontinued immediately, and clean up. 4, when the oil application group administered powder, cast powder should be confirmed before the oil burner ignition good, or allowed to cast powder. 5, the oil powder boiler during cofiring, and check the fuel oil gun system of fire reinforcement. 6, normal operation, operation personnel in monitoring the economizer, an air preheater flue tobacco in different conditions of temperature, abnormal, should be checked to detect a fire-place. 7, air preheater sootblowing steam system normally put into operation, the soot-blowing pressure and temperature in a predetermined range. When the unit load or less prolonged 300MW kerosene mixed combustion, air preheater sootblowing steam to be continuous. 8, the air preheater into a reliable fire alarm device. 9, an air preheater inlet and outlet fume / air damper, and should be able to put an electric shutter can be open, closed tight. 10, if found preheater stall, should be put into operation again immediately, if not turn back, they should be isolated.

WNS horizontal gas oil fired for sale high efficiency boiler azerbaijan

Full open door. the front of Boiler is designed with an open door. And the door can be opened according to the actual need, from the left or right. large space is convenient for the maintenance of the boiler.

Reform technology of coal-fired for sale high efficiency boiler azerbaijan combustion mode retrofit of coal-fired boiler by means of this technology, proper pulverized coal can be injected into the proper position of furnace chamber, and appropriate suspended combustion can be added on the basis of furnace row layer combustion, which can achieve a certain energy saving rate. For fuel oil and gas-fired boilers, the old and backward burners can be replaced by new energy-saving burners.

Tai Chi, Jiaozuo City, Jiaozuo City Sports Center is one of important sports infrastructure, a total area of ​​11.73 hectares, held several international events. With strict management in Henan Province for air emissions of pollutants, Jiaozuo City, also launched the governance of coal-fired for sale high efficiency boiler azerbaijans, thermal power and other equipment. Jiaozuo Sports Center actively cooperate with municipal workers, took the lead from coal to gas activities, the serious pollution of the original extent of coal-fired boilers to replace gas boilers. Gas boiler cleaning binding understanding of the market, to achieve cooperation with the finalization fast boiler by providing a fast side 2.8MW integrally condensing gas hot water boiler (WNS2.8-1.0 / 95/70-YQ), it is used to Sports Center provides heating and hot water.