1 75mw gas heating hot water boiler

A gas boiler comprising a monitoring system that parts (1) capture the state of various equipment and system status; and (2) control the boiler and the various actuators. State acquisition device is mainly a state of the output point of the boiler, a circulation pump status point state point and given water supply pump, as well as tanks and other equipment. State point boiler including the boiler operating state point, the state point level tank, boiler fault state point, the boiler water temperature, return water temperature of the boiler, the boiler exhaust gas temperature; circulating pump, supply pump and an electric auxiliary control valve which state point frequency devices work. State acquisition system is divided into primary and secondary sides. A water circulation system between a primary side of the boiler to the heat exchanger, the secondary side to the water circulation system is mainly refers to the end of a heat exchanger circulation system. Acquired primary side water temperature state comprises a primary side, primary-side return water temperature, water pressure on the primary side, the primary return pressure, smoke and combustion temperature and the state of the working machine tank level,; the state of the secondary side includes a secondary collection side water temperature, return water temperature of the secondary side, the secondary side water pressure, the secondary pressure backwater; an outdoor temperature collection can automatically control monitoring system according to the outdoor temperature boiler. Boiler control the various actuators and control of the main boiler and stops the control of various electric valve. The boiler room various devices, instruments, sensors, actuators and communication module line monitoring system to achieve automatic control of the boiler room by performing data acquisition and control functions of the boiler room and other field devices, safe start-stop units, reached unattended.

Stoke coal-fired 1 75mw heating hot water boiler operating temperature range of its coal-fired hot water boiler, which operate in Stoke on what specific requirements will be? Its internal plumbing, how much temperature is generally able to withstand? And coal-fired hot water boiler hot water, whether it is secondary energy? These are associated with coal-fired boilers hot water boiler, so the following to explain the good answer, I hope that everyone in to get what you want. 1. Stokes fired hot water boiler operating requirements (1) before Stoke, first baffle opening smoke wind boiler, let the natural ventilation, the time is about 10 minutes. If mechanical ventilation is employed, then over time, for about 5 minutes. In this manner, the boiler furnace and combustible flue gas remaining in the exhaust clean. (2) For the boiler fire, it is strictly prohibited the use of volatile oils, to avoid problems. For Stoke-speed coal-fired hot water boiler, attention can not be too fast, in general, is not less than half an hour. Also, before Stoke, should open the circulating pump, so the job. 2. coal-fired hot water boiler interior water pipes, on the temperature, how many can afford to live? For coal-fired hot water boiler pipes inside this kind of boiler, it could afford, in general, hundreds or thousands of degrees is no problem. And it's also related to the boiler pressure. If the pressure is higher, the higher the temperature in the boiler furnace, so that the internal water circulation faster. 3. coal-fired hot water boiler, hot water, whether it is secondary energy? Coal-fired hot water boiler hot water, which belongs to secondary energy. This is because the secondary energy, which can also be called secondary energy, or artificial energy, primary energy is converted to a processed or derived, such as gas, coke, gasoline, heavy oil and steam and hot water. So, the question, the answer is yes. For coal-fired hot water boiler, the question raised above, as well as specific answers given, so that everyone can be a comprehensive knowledge and understanding of this kind of boiler, so as to carry out well the practical application of their work, and add some expertise. Furthermore, the use of effects and use value of the product to be improved.

Recently, Pingliang City, issued the latest "Pingliang City to win the Battle of Blue Sky 2019 annual implementation plan," we can see, Pingliang City, determination and efforts for the improvement of the atmospheric environment. Details are as follows.

First, in an orderly clean winter heating. Seriously implement the "Pingliang City winter heating clean overall plan (2018-2021 years)," according to an alternative clean, affordable, affordable residents principle, using a combination of all types of cleaning of heating, substitution of coal for heating. Full implementation of national, provincial and clean energy heating prices on northern policy support, accelerate the clean heating work.

Second, continue to promote the comprehensive improvement of coal-fired boilers. On the area of ​​coal-fired boilers comprehensive investigation, according to "a furnace of a policy" requirements, to promote the comprehensive improvement of precision work. Increase efforts to eliminate small coal-fired boilers, the county level and above urban area per hour and 10 tons of steam coal-fired boilers and pantry oven, stove operating, grain storage and drying equipment, coal-fired facilities out rate of 60%, principles the 35 tons of steam per hour, no new coal-fired boilers, in principle, to the rest of 10 tons of steam per hour, a new coal-fired boilers. Dispersing the concentrated coal-fired boiler heating pipe network grid should be eliminated, the coal-fired boilers and gas dispersion pipe network should be implemented under the premise of coal to gas in the implementation of the air supply and gas supply; central heating and no gas pipeline network coverage area scattered coal-fired boilers, energy saving and environmental protection in line with national requirements, compliance governance reform can be implemented smoke, does not meet the requirements, it should be replaced by electricity, alcohol-based fuels and other clean energy; industrial Park (zone) press the "one District one heat source "requirements, an orderly phase-out of demolition and decentralized heating boilers; in remote rural areas, affected by economic and other conditions can not be eliminated or temporarily restrict use clean energy alternative to coal-fired boilers can be taken to use clean coal and other ways to achieve the flue gas discharge standards.

Mill steam boilers to reduce pollution which method 1, leak checking and maintenance of protection: 2 mm steam leakage will cause energy losses of more than 10 tons of coal each year do? When you do not use it, you can turn it off to save energy. For water, steam and compressed air leak survey and routine maintenance, cost very little. 2, the non-contact cooling water in repeated use: Since the non-contact cooling water temperature and the quality is very good, it can be reused for desizing, scouring, rinsing and other processes. Three best source of cooling water is regenerated: sintering machine, a pre-link and compressor systems. The plant water recovery system may be installed, pipes, valves, storage tanks, and control systems. 3, reuse of steam condensate: textile mills require large amounts of saturated water vapor in the dyeing process, wherein a portion of the condensate is converted to its high temperature and purity. Water can be pumped back to the boiler to form a new steam. For those who buy steam from suppliers, or boiler is located away from the dyeing process, the condensate can be used as water washing or desizing. 4, pre-treated wastewater reuse Procedure collected bleaching, mercerizing machine, the water can be reused in other programs, there is no direct discharge of wastewater. 5, hot wash water is recovered from the hot gas in the dyeing process, large amounts of hot water are used to wash. Heat the washing water can be collected by the system plate heat exchanger to preheat the water to be sent to the next washing. 6, pre-screened coal enterprises should introduce screening spiral coal boiler technology to selection of raw materials. It is possible to improve the media tell the good, the bad quality of proportion, to avoid loss of small volumes of coal and coal calorific value. 7, maintaining steam traps traps can help maintain effective delivery of the steam plant. The valve is removed from the steam pipe and prevent further condensation water, so as to avoid heat loss and reduce fuel consumption. 8, pipe insulation pipes, valves and flanges, valves and flanges experience hot waste of resources, reducing efficiency. Steam delivery device insulated to prevent vapor loss is an inexpensive, energy-saving method of .9, the heat recovery boiler chimney smoke at a temperature of 360 deg.] C, and sometimes directly discharged into the atmosphere, there is no heat recovery. In fact, this heat can be used to preheat boiler water, steam or create a new steam system. 10, optimization of compressed air systems consume a large amount of compressed air in many parts of textile machines Mills. These instruments are prone to leakage, particularly in a threaded joint, rubber joints, valves, automatic regulator, the inflatable device and the old gasket. In addition, the use of compressed air pressure is usually based on the maximum pressure setting; reduce this pressure is feasible and would not have any negative impact manufacturing.