20 ton oil gas steam boiler for sugar mill

Gas boiler SZS, WNS, F, A, L, N, B and other parameters have what meaning? SZS gas boiler water is commonly used parameters. Wherein the meaning of each letter, S: double drum. There are two drum boiler, goes under the distribution structure. Z: vertical type. Using the "D" type arrangement, arranged longitudinally down drum, as the flue gas flow partition Wall full mode, the left side of the boiler convective tube bank is arranged. S: combustion chamber. Fuel is powdered (solid fuel, such as coal), mist (liquid fuels, such as oil), gaseous (gaseous fuel, such as natural gas) along with the air into the furnace (combustion) combustion in suspension. WNS is automatic gas (oil) parameters commonly used boiler. In which the meaning of each letter, W: horizontal. A boiler according to the design and installation of the outer layout, was lying state. An exhaust gas stream produced by the boiler is of horizontal flow, the flow of hot gas, in the same section on the exhaust gas temperature is low compete. N: internal combustion. After all of the fuel combustion flue gas, without burning the residue was heated with a heating surface directly mixed working fluid (water), and the flue gas, steam as the working fluid work output, the flame in the combustion furnace through the center of the drum. S: combustion chamber. Fuel is powdered (solid fuel, such as coal), mist (liquid fuels, such as oil), gaseous (gaseous fuel, such as natural gas) along with the air into the furnace (combustion) combustion in suspension. F: split. A: three return. N: N is low. L: condensation. B: Center backdraft.

ZG also manufactures high efficiency, multi fuel Industrial water tube Boilers & Steam Boiler based on technology acquired, with whom we had over 60 Years of technical collaboration. It can supply boilers upto 270 TPH capacity, steam at pressure upto 5.28Mpa. and temperatures up to 330. ZG has a large proven reference list of more than 1000 installations completed worldwide in last 6 decades. Water tube boiler fuel can be solid fuel, gas and oil fuel.The water-tube boilers described above are usually of a large capacity.

First, when the flue temperature dropped to below 50 ℃ Solution: Check the tail may enter the flue if heated, while the flue thoroughly remove soot. No burning flue tail, can be re-started ignition; if burning, should be replaced, repaired burning member. Second, the combustion chamber when the negative pressure is too large Solution: When the exhaust gas temperature close to the temperature of the injected steam, or less than 150 deg.] C over 1 hour and stable, open the inspection hole inspection; after inspection after confirming the fire source, before start the fan ventilation. Third, shutdown or fire, air gun valve ajar solutions: reinforcing and electric 20 ton oil steam boiler for sugar mill feed water drainage, or open the valve economizer recirculation tube to protect the economizer is not burning. Fourth, Kai, during shutdown lower furnace temperature, a solution of unburned fuel in the furnace: extinguishing device immediately put into vapor, carbon dioxide or other devices off fire. Five burning improperly adjusted, with insufficient wind or with the wind unreasonable Solution: Close the flue duct and baffle around the door opening, start sending prohibited, induced draft fan. These are the methods of electric heating steam boiler fast boiler to provide you with the handling of soot in the chimney, if you use electric steam boilers, with more than five can control their own boiler equipment need to be cleared up the flue, and select the appropriate method .

In response to the state-assigned air quality improvement objectives and environmental supervision central feedback coal-fired boilers environmental pollution rectification program, Kang County, Gansu Province based on "government-led, relying on real responsibility, Take Measures to proceed with" principle, accelerate the burning of remediation work out of the coal boiler, and to develop the following measures, at present, reconstruction activities are being actively promoted.

A: a comprehensive investigation, the establishment of accounting. For urban areas, towns, Kudo industrial parks all coal-fired boilers to conduct a comprehensive diagnostic investigation, a total of investigation and the use of the boiler 31 enterprises, a total of 38 boilers, electric boilers and removal of fuel two boilers, coal-fired boilers county a total of 36, including two sets of 20 tons of steam boilers, coal-fired boiler pressure 4. In the diagnostic process, the situation boiler location, type, number of units, the tonnage, use, carefully verify the age and so on, and sort out the summary, so that a boiler does not leak, the device information is not a shortage.

Two: to strengthen publicity, and create atmosphere. Through new media, focus on advocacy, government circulars issued, will be held to promote the government leaders in charge of on-site investigation led mobilization and other forms of media offensive formation, multi-level multi-angle carry out various forms of publicity and education remediation phase out coal-fired boilers, each guide society personnel support and participate actively promote the use of coal-fired boiler units understand the situation, to speed up the phase-out of coal-fired boiler renovation.

Three: supervision of interviews, results-oriented. Person in charge of the county Bureau of Quality Supervision led, in-depth coal-fired boiler unit, for the slowness, lack of knowledge, waiting to see the business units and enlighten them with reason, and emotionally moving. With the responsible persons of the two job interviews lag to not be one of them out of the situation Reconstruction of boiler in accordance with national policy requirements, on-site recovery boiler registration certificate and ordered deadline to be removed or modified.

Kang mentioned standard by the transformation, step out, closed down closed down, to gas and electricity from coal to supervise a number of measures to actively promote the elimination of remediation coal-fired boilers. Currently the county out of 29 coal-fired boiler units, of which 15 units destructive demolition, stop burning close 12 stations, two mentioned standard transformation. The remaining seven out of focus on remediation plan included in this year, the county continues to promote this work, and to call on the unit enthusiastic, standards do not fall, the team leave, determined to complete the end of October this year, the county and below 10 tons of steam coal-fired boiler work all clear.