6 ton Fully Automatic hot water boiler Thailand

Note Henan condensing gas boiler blowdown process (1) running Henan condensing gas boiler saturated steam, superheated steam, boiler water sample analysis by the chemical art, Henan condensing gas boiler personnel should be notified chemists sewage. Other Information Henan condensing gas boiler (2) before the sewage regularly, it should be connected to the same main pipe, by furnace. Boiler overhaul as a sewage pipe connected to the mother, to do the isolation measures to ensure that no waste water intrusion into the furnace during maintenance of sewage. (3) periodic sewage, should ensure Henan condensing gas furnace boiler water level slightly above the normal water level, discharge process must strengthen the monitoring of the boiler water level adjustment, prevent pollution accidents caused by low water levels. (4) General Procedure sewage: opening a first door slowly open the second door, after the first turn of the secondary sewage door, a rear door closed, blowdown should be only slowly added, the mother pipe to prevent sewage water impact. (5) in the discharge process, if Henan condensing gas boiler accident, should immediately stop the sewage, but the occurrence of drum level is too high boiling and soft drinks can be sewage.

February 21 this year, the Harbin Municipal People's Government issued the "blue sky Harbin win the Battle of three-year action plan to implement the program" (hereinafter referred to as the "Program"), as follows.

First, strictly control the total coal consumption

The county (city) should shoulder the main responsibility for control of the total coal consumption, according to the focus on the use of coal and clean use of principles, focusing on reduction of non-coal power, propulsion power and other clean energy alternative to coal and oil by 2020, coal accounting for the proportion of energy consumption compared to 2015 decreased by 1.5 percentage points or more.

Second, to strengthen control bulk coal

Full implementation of the "Harbin coal pollution prevention and control regulations" to strengthen quality inspection of coal, coal quality testing organizations standardized sampling, testing system, improve the sampling frequency. Promote clean and efficient coal-fired boiler, wherein an alternative embodiment the biomass must be dedicated biomass boiler, burning raw material briquettes, installation efficient dust removal equipment.

Third, steadily promote clean heating

To promote priority to the development of clean coal utilization and clean energy use, urban urban central heating. Being difficult to cover central heating, gas heating and accelerate the implementation of electrical heating and other heating decentralized cleaning implement "coal to clean energy" units should be synchronized removal of coal-fired boiler, gas boiler for an alternative to the use of low NOx combustion technologies , gas boiler efficiency can not be less than two levels. 2019, clean heating rate of more than 60%; in 2020, clean heating rate should reach 70%.

Fourth, to carry out comprehensive improvement of coal-fired boilers

To develop a comprehensive remediation plan coal-fired boilers, the implementation of cleaner alternative to coal-fired heating boilers. 2019, the urban built-up area, county (city) county towns built-up areas out of 10 tons of steam coal-fired boilers and furnaces and tea, operating the stove, grain storage and drying equipment, coal fired facilities; basic urban built-up area out of 35 tons of steam per hour coal-fired boilers; basically eliminated the urban fringe per hour 10 tons of steam coal-fired boilers; county (city) basically out of the city and county (city) financial support units (including township, village ) per hour, 10 tons of steam coal-fired boilers. By 2020, basically out of 10 tons of steam per hour urban coal-fired boilers; out of the urban built-up area per hour can not discharge standards of 35 tons of steam (or 29MW) coal-fired heating boilers. In the central heating pipe network coverage area, a ban on new or expanded scattered coal-fired boilers.

Fifth, accelerate clean energy development

Orderly development of wind power, wind power construction layout optimization, to carry out decentralized wind power development and construction in the area have developed criteria. Actively promote the construction of biomass power generation. Enhanced geothermal energy exploration, development and utilization of resources to carry out detailed investigation and evaluation of geothermal energy, geothermal energy resources in the region to find out the distribution and exploitation potential. Increase renewable energy consumptive efforts to solve the basic water abandoned, abandoned wind, abandoned light problem. By 2020, the proportion of non-fossil fuels in primary energy consumption of the city's total, compared with 2017 increased by 1 percentage point.

Hot water boiler energy consumption, what is the reason?

There are many users using hot water boilers with the purchase of the boiler again told us to question why our unit energy consumption of hot water boiler so much? And the more years using longer, the more obvious the problem. Combined with such problems, fast boiler small series as you make the answer for your reference.

For just heating area, fast Boiler existing boiler plant up to 1 ton of 6 ton fully automatic hot water boiler thailand supply 10,000 square meters of heating area. If the time for large centralized residential or heating company, the heating area is too large, we would recommend a gas pipe hot water boiler for you.