Price 6t Natural Gas fired steam boiler Singapore

Zhengzhou Sunrise Optoelectronics Technology Co., Ltd. by the Dongxu Group, Henan Province, the state-owned asset management companies and Zhengzhou Investment Holdings Limited jointly made, mainly engaged in flat panel display and solar industry design materials, manufacturing and sales operations. Sunrise Optoelectronics project has been put into a production line, the second phase will continue the expansion, three new production lines to meet the production needs of Project Phase II, Sunrise Optoelectronics urgent need to increase new boiler equipment. After investigation and screening of a number of boiler brands, determined to cooperate with the fast boiler, steam signed a 10-ton integrated condensing gas price 6t fired steam boiler singapore (WNS10-1.25-Y.Q).

How do I care after the price 6t fired steam boiler singapore shutdown method Recently, many users did not know how to call maintenance shutdown after steam boilers, boiler maintenance is very simple in fact, today we explain the steam boiler and hot water boiler after shutdown maintenance. Since the cause of boiler failure or power shutdown required boiler, a steam boiler before travel should stop combustion boiler, the boiler slowly lowering the temperature until no pressure boiler, should pump before shutdown, induced draft fan and turn off the blower. After the maintenance shutdown home for boiler, furnace divided into external corrosion and home for the pot. Pot corrosion enjoying, enjoying their home for two kinds of wet and dry selected based on the length of shutdown time. When long-term disabled boiler, furnace should be paid close attention to external corrosion problems take care of themselves. First, the boiler shutdown cooling is necessary as far as possible completely eliminate fouling and ash grate heating surface of the upper, the lower portion of the furnace. Then have to adhere to certain natural ventilation flue. Under normal conditions, should be placed to dry moisture-proof agent in the furnace, flue. The dry quicklime as used, the furnace or the flue gas per cubic meter of ordinary should be placed about 3kg. After placing all the ventilation should be tightly closed doors. Lime powder to change after change. Such as boiler rooms in low-lying position, the air during shutdown severe flood tide, the method should be used regularly and placed a small fire to dry dry agent phase separation. If the boiler boiler long time, in order to thoroughly clean the soot topcoat red lead oil furnace or other metal surfaces in the anti-corrosion paint. As for the way home for corrosion inside the furnace shutdown, the shutdown Yaoan the length of time to be. Under normal circumstances, no more than one month shutdown of the available wet home for a month or more should take care of themselves dry. Dry to pay attention when enjoying the following questions: Do not dry agent in direct contact with the metal outer boiler, can be housed in a container such as an iron plate; dry agent after standing, for shutting the hole and the other hand hole cover, the vapor, the water pipe necessary to cut off valve; variant lime powder should be replaced. . Enjoying while wet, to pay attention to boiler water condensate is preferably used, followed by the available existing boiler water, demineralized water again; after adding the base, with a slow fire boiler water is heated to 80 [deg.] C the pressure rose to 100 0.2 when the 0.3MPa to maintain 2-3 hours, alkalinity boiler water circulated reach equilibrium, reduced pressure, then filled boiler water, a certain gauge, and continue to adhere to this pressure throughout the home for, alkalinity should Regular testing, decreases should be added at any time; in winter, wet enjoying pay attention to antifreeze, especially the local sewage channel and economizer; before re-use should release all the pot boiler lye, best prepared sump, in order to facilitate then. At the same time should be rinsed with clean water.

Gas-fired price 6t fired steam boiler singapore steam boiler which has the advantage compared to ordinary? With the fog and haze over the ongoing frequent occurrence, people on the importance of protecting the environment is also a new understanding of traditional coal-fired steam boiler is also limited policy, many basically let the big cities now use coal-fired steam boilers, and many areas have begun to work coal-fired boilers, low gas and steam energy saving my company's research production of boilers, environmental protection, operating costs, welcomed by the market. Energy conservation, environmental protection relative to conventional convenience I produced gas steam boiler Gas steam boiler advantages are: 1, 0.5 tons of gas steam boiler steam from the ignition to just 2-3 minutes, while the average gas steam boiler needs more than 20 minutes. 2, gas steam boiler compact, small footprint does not need to build the boiler room. 3, and does not require government departments to deal with, because the normal water level of the water capacity of only 27 liters of gas steam boiler is not within the range of technical safety supervisory inspection of the boiler, the boiler does not need professional workers, a key to start fully automatic operation. 4, heating area, there are supporting economizer 2T, increasing the heating surface of the boiler, provide the working efficiency greatly save fuel. Low cost: Compared with the fuel gas steam boiler, electric heating steam boiler can be reduced by 30% of the fuel, a steam boiler heated area can reach 92%, coupled with a supporting economizer heat generated by the boiler can be sufficiently absorbed , significant savings in operating costs of the boiler corresponding to the call of the national energy saving, gas steam boiler new products in recent years come to the fore, not only do energy conservation, which also meets the requirements of industrial production of thermal energy, ordinary steam boiler replacement product.

Commissioning of Boiler gas boiler commissioning must be carried out after the hydrostatic test. Before commissioning, should be a comprehensive inspection of each furnace parts, electronic control devices, wiring, etc. are normal, water supply, oil furnace if opened, electrical contacts are in the set position. 1, depending on the size of the fuel consumption, the initial damper, the hydraulic pressure. 2, the power is turned on, the power switch to open the cabinet, the water pump starts furnace, (if the pump is rotated into the anhydrous, pump purge valve is opened, the air exhaust pump). 3, control checks whether the normal water level electrode. 4, check the burner operation is normal. Starter burner starts combustion when the water level rose to a predetermined level, the start of combustion is normal to observe: Start no vibration noise, stable combustion, no smoke, orange yellow flame, burning bright clear. Otherwise, to make the appropriate adjustment (refer to burner instructions). Note: The oil pressure between 0.8 ~ 1.0Mpa, after a good tune, do not easily change, oil pressure is too high or too low have an effect on burner performance life. 5, check the pressure gauge pointer swing is smooth, with or without loosening stuck. 6, whether the discharge check valve is set at the set pressure steam: Pressure controller first maximum working pressure, a safety valve is adjusted to the set pressure higher than 0.05MPa, when the furnace pressure was raised to whether the exhaust pressure setting, if exhaust , pulling the safety valve a few times, and try again, if not enough to deal with safety valve to adjust. Pressure relief valve setting: boiler rated pressure + 0.03MPa. 7, check the electrical contacts of the operation: When the pressure is raised to the maximum working pressure (not exceed the rated working pressure), should stop burning, open the safety valve blowing off steam, the pressure to a minimum operating pressure (maximum operating pressure is generally lowest set to 0.10MPa), combustion burner should be restarted. Note: When the adjustment screw should slow, especially when the pointer approaches the end, otherwise, damage the screw off the wire.