gas fired steam boiler supplier in bangalore

Gas-fired fired steam boiler supplier in bangalore safety valve from installation to use, it must remain vigilant safety valve is one of the most important components of the gas steam boilers, boiler probability of the risk occurring due to various incidents can effectively suppressed. This article focuses on the safety valve from installation to use several important considerations, we do not ignore the use of gas when it steam boiler. A Notes 1 safety valve, the safety valve should be mounted vertically in a high position in the pot business, set box. 2, between the safety valve and the drum or header, not equipped with access to the steam outlet pipe and the valve. 3, the lever-type safety valve should prevent movement of the self-apparatus and the weight limit leverage deviant guide tube, a spring safety valve should lift and handle means for preventing movement of the adjustment screw is screwed lightly. 4, the rated steam pressure less than or equal to 3.82MPa gas steam boiler safety valve throat diameter of not less than 25mm; power greater than the rated steam pressure 3.82MPa boiler safety valve throat diameter not less than 20mm. 5, the safety valve and coal-fired steam boiler tubes, the cross-sectional area not less than the cross-sectional area of ​​the valve inlet. If several valves installed together with a short tube directly connected to the drum, the cross-sectional area of ​​the passage should not step short tube to 1.25 times the area of ​​all the exhaust valve. 6, the safety valve should normally be installed exhaust pipe, exhaust pipe should be through a safe place, and there is sufficient cross-sectional area to ensure the smooth flow of exhaust. 7, the safety valve exhaust pipe at the bottom should have received a place of safety posturing of drainage pipe, the exhaust pipe and drainage pipe not allow the installation of the valve. 8, rated evaporation to 0.5t h coal-fired steam boiler /, at least two safety valves installed; Rated evaporation 0.5t h less than or equal to electric boiler /, mounted on at least a safety valve. 9, separable economizer outlet, the steam superheater outlet valve must be installed.

Industrial gas fired steam boiler supplier in bangalore room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger.

Since this year, Qingyang City, Gansu Province Environmental Protection Bureau to continue to improve air quality at the core, in order to implement the Air Pollution Control Act as the main line, adhere to the rule by the people, source control, increase the comprehensive management of air pollution, construction of accurate and efficient and fine air pollution comprehensive prevention and control system, to fight air pollution control tough fight.

Qingyang Xifeng Kowloon City Road, South Street neighborhood community coal-fired boilers in accordance with the "clear" work requirements, continue to increase coal-fired boilers "cleared" efforts, multi-pronged, comprehensive treatment of the families of Xifeng Animal Husbandry Bureau building coal-fired boilers were removed.

Since coal-fired boilers to carry out "clear" its work, Kowloon South attaches great importance to the community, seven coal-fired boilers within the jurisdiction of actively deployed, timely follow-up, held a special arrangement will, continue to strengthen measures. In the community workers and urged many times to persuade, the District Animal Husbandry Bureau family member courtyard boiler successfully removed. After removal of this coal-fired boilers, coal-fired boiler demolition community task has been completed.

Phase out coal-fired boilers is an important measure to improve the air quality of the environment, but also the strong expectations of the masses. The demolition action, and effectively promote the area to carry out "the image of the city, the level of management" to work for the creation of a national civilized city to make its due contribution.

Boiler multiple protection: (1) the integration of boiler water level to protect water level and boiler design, the appearance of more compact appearance, accurately show the actual water level in the boiler body function. Coupled with dual independent electronic water level control system to achieve ultra-low water level in the boiler, low water level automatic adjustment function, the normal water level, high water level, ensure that the boiler in a variety of unforeseen circumstances foolproof, secure home. (2) steam pressure protection ☆ pressure controller: selection of high sensitivity of the pressure controller, the pressure is high, or low levels of signal to the electrical switch, other control lines or automatic control chain protection. Common pressure controller and pressure gauge, vapor pressure overpressure alarm can cut off the burner limit is reached; the pressure controller may be single or double fire burning fire the actual operating pressure regulator. ☆ safety valve: safety valve is the last line of defense to protect the boiler, the boiler pressure exceeds the limit, according to the set pressure relief valve design with the school, the exhaust steam pressure relief, to ensure the normal operation of the boiler. (3) having a burner flame protection flame protection inlet means, combustion function is to detect, when the ignition failure or extinguish combustion middle, immediately off the burner into the oil (gas) solenoid valve, the blower continues to operate at this time, the furnace was purged combustible residual gas, after 20 to 30 seconds purge, and various auxiliary blowers automatically cut off power, the boiler operation stops. (4) self-locking power failure protection case, the boiler shutdown immediately burst self-locking power interruption, if the current power is restored, the boiler will not start at any time, you must reset release self-locking, to re-start the ignition.