Gas or Oil fired boiler Supplier Commercial Indonesia

9.4MW YQW gas-fired thermal oil heater for clean-energy industryThermal oil heater is a kind of new heat energy equipment with low pressure and high temperature, playing an important role in various industries. Huagang Gas Group is a sino-foreign joint venture enterprise, which established by Kunlun Energy Company Limited and Huabei Oilfield Company. The company is engaged in natural gas, liquefied petroleum gas, blast furnace gas and so on. Due to the stringent quality requirement for pipeline gas in China, all natural gas needs to be decarbonized and desulphurized. A high-quality steam or oil fired boiler supplier commercial indonesia is one of the key equipment for the productive process. With the development of global environmental policy, the demand of clean energy is growing with each passing day. Huagang Gas Group has carried out public bidding to purchase one set of thermal oil heater to meet the production need. Relying on rich experience and powerful comprehensive technology strength, ZOZEN won the bid and provided 9.4MW YQW series thermal oil heater for them. The heat exchange surface of the thermal oil heater adopts multi-loop round coil tube structure, which features high security and sufficient heating surface. The waste heat boiler, air pre-heater and economizer are installed on the tails of the thermal oil heater to effectively improve the thermal efficiency (The thermal efficiency of ZOZEN thermal oil heater can reach up to 95%). Moreover, this kind of thermal oil heater adopts perfect running control and safety monitoring device, which can control working temperature strictly and guarantee the safe operation.

Fuel gas-fired or oil fired boiler supplier commercial indonesia installation steps Many users in the purchase of fuel gas-fired boiler fuel gas-fired boiler installation step is not clear, here we introduce to you in detail under the fast sale of shares by Henan side: We all know that the installation of the boiler is in line with national needs promulgated regulations to execute the regulations GB50273-98 "industrial boiler installation engineering construction and acceptance", but we should also note the following in the installation of several points: 1, the first part of the underlying foundation of compacted dust do, then start concreting and tiling, to try to make level, the maximum error of boiler placed inclination of not higher than 5mm, anterior need to open up a sewage tank. 2, the oil pipeline supply line is installed through the boiler plant, a senior technical staff installed a boiler factory is to have a portable installation instructions. 3, the combustor burner installed in the supply line the same as the factory mounted directly on the boiler, so this does not require the installation site 4, piping, valves, meters, accessories mounted fast due Henan local production of fuel gas boiler packaged boiler, so these are also in the factory have been installed, but because these instruments are not precision instruments collision, it will affect its accuracy, it is necessary to gently, the installation process must be careful. More questions about the installation of fuel gas-fired boiler, please contact customer service online!

Prevent explosion of the furnace, the fuel (gas) or oil fired boiler supplier commercial indonesia flame protection means must be provided, is a function of combustion (including ignition, combustion or misfires when halfway off, typically within five seconds re-ignition furnace in the monitoring, within 1 second running off into the oil (gas) solenoid valve, and turns on and audible alarm signal, when the blower continues to operate, the residual gas was purged of combustible furnace, after 20 to 30 seconds purge, automatically cut off the blower and various auxiliary power boiler stop running.) by the flame monitoring and control device component. Role is to monitor the flame control device signals the presence of a flame or interrupted.

Recently, located in Yan'an City, Shaanxi Province, Huanglong held removal of coal-fired or oil fired boiler supplier commercial indonesias mobilization meeting, and promote the coal-fired boiler, "clear" work, Huanglong improve the overall air quality of the environment. The meeting was chaired by the Deputy Mayor Cao Zengjun, County Authority, Environmental Protection Agency, the Public Security Bureau and other coal-fired boilers Chaigai leading group members of the unit involved in coal-fired boilers and Chaigai of 16 enterprises and units attended the meeting.

At the meeting, urban management bureau announced the "urban transformation of coal-fired boiler demolition plan", and county coal-fired boiler demolition work arrangements for the deployment. Program pointed out, the county government before the end of June to remove their coal-fired boiler steam tons per 20,000 yuan subsidy standards in accordance with the relevant provisions of the provincial coal-fired boilers Chaigai subsidies, Chaigai completed in the first six months to the end of August unit task of tons of steam per 10,000 yuan subsidy standards, after the completion of the end of August Chaigai units should be punished to the unit in addition to the removal of subsidies, the person in charge accountable.

A coal-fired boiler Chaigai work is the key point to win the Battle of the blue sky, Huanglong is an important measure to improve the quality of atmospheric environment, the relevant units should fully understand the importance and urgency of the boiler Chaigai work, according to "own boiler demolition themselves, change themselves, government agencies take the lead in demolition, lead change, limited time limit must be removed, must be changed "requirements, implement them.

Second, the change involved units to firmly establish the overall awareness, to overcome the luck, to seize the opportunity boiler Chaigai premium policy, a reasonable choice of the transformation of the way, adhering to standards, early arrangement, early deployment, early start.

Third, the government supervises the room should work together with urban management, environmental protection and other departments, inspectors conduct regular supervision, to dismantle ineffective, slow-moving unit, to be criticized, and timely feedback evaluation to do, do you want to do a good evaluation appraisal work; County JISC to errant Chaigai, affected units and individuals county atmospheric objective assessment of the results, in accordance with the "air pollution prevention of accountability measures" be accountable, accountability, ensure on schedule to complete the work Chaigai city coal-fired boilers.