boiler 8t Energy Saving Malaysia

Jinzhou construction and installation company needs an electric heating hot water boiler 8t energy saving malaysia house construction, after screening and comparison of various brand boiler industry, our excellent results in the cleaning of the boiler industry has been attracted to each other, in mid-2016, the Jinzhou construction and installation the company I signed with an electric heating pressure hot water boiler.

Gas condensate waste heat recovery boiler 8t energy saving malaysia is how to do waste heat recycling? Rapid socio-economic development, national environmental protection, energy conservation and comprehensive utilization of resources put forward higher requirements. Now, with the widespread use of gas-fired boilers in heating the heating industry, with coal-fired boilers with higher thermal efficiency, less polluting characteristics compared. Natural gas combustion in the boiler, about 90% of the energy is converted into heat, with a 9% energy loss and heat loss out of a 1% loss of energy through the surface of the heat dissipation. Thus, do a good job in front of the waste heat recovery work is particularly important.

Business issues to be considered in the selection boiler 8t energy saving malaysia summarized as follows: 1, the enterprise itself how much heat for steam and hot water needs heating or heating in the production process. 2, steam boilers or hot water parameter parameter. 3, analysis of the relationship between steam boiler and hot water boiler selection. 4. Select the boiler furnace industry. 5, a coal burning boiler. 6, other dimensions, such as load changes. 1, how to determine the capacity and the number of boilers: how to determine when to buy boiler boiler capacity is an important issue. In general should be determined according to the boiler output or capacity of the production process or heating steam consumption and living area with heat for hot water needs. First, the user wants to find out the total load range; peak followed, including the duration of the peak load, peak frequency, which is cyclical peaks occur, for example, the peak number of occurrences per month, week, month and year in winter and summer differences. Find out the peak and the total load need be considered after the device capacity and the number of units selected. Should also be considered when selecting the amount of spare accident shutdown problem. Generally it refers to an amount of a standby spare boiler. It needs to be determined based on the user's own importance, if the production and use on the higher continuity requirements must seriously consider the issue of spare equipment.

Efficient, reliable and easy to maintain.

Our selection of oil fired boilers is part of IB&M’s commitment to being the one-stop supplier of all your boiler needs.  Over the years we’ve successfully installed hundreds of oil fired boilers for customers in over a variety of many different industries.