house generator natural gas

Hefei Limin Pharmaceutical Co., Ltd. Nanjing Military Region, formerly the backbone of pharmaceutical companies, the main drug is slowly swallow rather teabag, relying on advanced R & D platform to carry out contract manufacturing, OEM OEM and other business cooperation. China's environmental protection development trend began to take shape, many environmental policies have been put forward for a positive response to the national environmental policy, Limin Pharmaceutical decided to introduce a gas station steam house generators. After an investigation of the boiler market, Limin Pharmaceutical fast boiler is strong comprehensive strength and wealth of experience working for many years in the pharmaceutical industry to attract, party fast according to the actual needs of customers for its recommendation of one of Taiwan 4 tons of steam condensate gas-fired steam boiler (WNS4-1.25-YQ).

For large and medium-sized enterprises which do not have heat supply from the central thermal power plant, when the continuous and stable steam consumption is above 20t/h, there are generally conditions for the establishment of self-provided thermal power plants. This kind of enterprise can choose 20t/h medium pressure house generator type or 35t/h medium pressure and sub-high pressure boiler, 1.5MW or 3MW back pressure type steam turbine-generator set, and build self-provided thermal power plant, which is mainly heating and auxiliary to generate electricity, and can obtain great economic benefits. Compared with the dispersed small-scale industrial boiler, the fuel consumption of the cogeneration is equal to that of the small-scale boiler due to the higher thermal efficiency of the boiler. Under the same heating conditions, it can be obtained by using co-generation of heat and power. Extra power.

Fuel gas house generator steam generator] [burner heat release, heat transfer by radiation is first drawn waterwall waterwall Boiling water occurs for a large amount of steam into the drum soda parting, parting the saturated steam enters the superheater by radiation, convection method of continuously draw furnace and the top level of the flue, the flue gases heat the back pass, and the superheated steam reaches the desired operating temperature. Fuel gas steam control system for the whole episode is the active control, touch of a button, both running into active form, without staff on duty, manipulate worry more confidence. Receiving advanced three interior vertical return pipe tubular structure, rinsed with plenty of smoke and heat exchanger fin tube, the heat regenerator] obey fuel pot reaches 92% or more. The steam boiler and burner as a whole to plan, the boiler combustion system to reach the ratio, organic joint energy saving and environmental skills. [] Large fuel boiler hot water boiler, the steam generator custom small biomass, large hot water boiler fuel, gas steam boiler for producing medium-Dongyang furnace body generally use special boiler seamless steel pipe, elongated upright. Steam generator boiler manufacturers [], [] biomass steam generator, steam generator fuel [], [] gas steam generators, biomass steam boiler [], [] steam boilers and other new energy device, select the State of the boiler plant. Its cost is only slightly more expensive than gas, gas steam generator vary depending on the market price of raw materials.

What needs to pay attention to low-carbon transformation of the house generator there? Compared to ordinary low-carbon boiler boiler, it is much more environmentally friendly, so I chose to use a low-carbon economy to be more environmentally friendly boiler, then, to use the technical transformation of the boiler low-carbon, low-carbon transformation that the boiler when what ? attention to the needs of today it Yuyao Kai large steam generator boiler manufacturers are concerned that low-nitrogen transformation of those things: 1 gas burner ignition fails the second consecutive time, should stop to check the gas supply system, the burner has occurred normal circuit wiring is correct, after the lifting of the fault before restarting the burner. 2. The supply line is prohibited or metal rod with a wrench percussion, friction, to avoid static electricity or sparks, causing a gas explosion. 3. In the non-gas manifold or pipe smoking, etc. flange, welding, cutting and other illegal operations. 4. prohibited any open flame test next to the pipeline and valve block and pressure regulator, to avoid a major accident. 5. In the gas supply line, is carried out evacuation, but the residual wall gas or liquid droplets, in case, electrostatic sparks and flame also cause fire and explosion. 6. When the air supply has the same period, and when disassembling valve failure, it shall be first distal manifold valve, then the valve to the manifold to the total length of tubing in which the gas is vented before it can be disassembled with the valve service. 7. prohibit the use of non-explosion-proof electrical power tools in the field. Leak valve 8. A device must be checked before use. 9. Before burner start, the supply pressure testing must be done to check for leaks, after confirming normal, then a simulation run. 10. When the burner is not used to inform the customer off power supply main valve and the main switch. 11. Not recommended for debugging night burning machine. 12. At the end of commissioning, to organize training of operating personnel to use the operating direction, establish operating procedures, if necessary. These are some of the issues of low-carbon transformation of the boiler should be noted that, in order to prevent danger, should strictly follow the precautions execution, where the checks have checks in place, there can be no negligence, to complete the renovation project of low-carbon boiler.