20t hot water boiler Low Price Commercial Myanmar

35 tph ZZ series mid-temperature and mid-pressure coal-fired steam boiler project for paper industry

Founded in September 2016, Rashid Paper Mills Ltd. is a subsidiary of Rashid Group. The company is mainly engaged in the production of paper products such as writing paper, printing paper and offset printing paper. At present, the company has two independent production lines. With a capacity of 200 tons of paper per day, the company exports high-quality paper to the overseas market. In order to ensure the heat source supply of its production lines, Rashid Paper Mills Ltd. introduced a set of ZOZEN ZZ series mid-temperature and mid-pressure boiler from China. With a design pressure of 3.82 MPa, the boiler can provide sufficient high-temperature steam.

Food Factory drum boiler water wall and its prevention package of food plant boiler water wall bulge causes and preventive measures? When the water wall tube localized corrosion occurs, the inner wall becomes rough, scaly easily formed in a relatively rough places, and then thickens. Local no good expanded metal soda mixture was cooled temperature, creep speed, and the tubes are not contaminated due to obtain good low-temperature cooling wall, creep does not occur. Water wall tube macro scale for local expansion properties. If you cut the pipe, it was discovered where the drum, the inner wall have been contaminated. Food plant boiler drum wall 1. Summary of the cooling water supply common cause unacceptable quality, contamination of impurities into the boiler heating surface. 2. Run the improper operation of the tube wall overtemperature. 3. flames sweep wall, resulting in long-term water wall tube overheating. The high temperature of the water wall, which makes the metal surface of the water wall had a great temperature gradient. If insufficient cooling capacity of the pipeline medium, the direct result of the water wall temperature is too high.

Oil-fired boiler pressure determines the operation: oil-fired boiler is ready for operation in the cold state, the oil boiler system to understand whether the failure to adjust the fuel oil system to determine the pressure, and therefore should be done before boiler ignition oil system determining the fuel pressure work, verify oil boiler system is normal, piping, valves for leaks. Procedure: (1) to the tank opens pipeline way valve, into the fuel oil pipelines; (2) start the pump, pump outlet opening regulating valve, hydraulic pressure within the passage rises pipeline; (3) when the hydraulic pressure is raised to the operating pressure, slow open return pipe of the pump or the regulating valve is adjusted to maintain the operating pressure oil passage pipeline; (4) stop the pump; wait ignition. These are the oil-fired boiler pressure determines the operational processes hope for your help. Ventilation operation flow of oil-fired boiler

Jilin Province is located in northeast China, colder winter. Jilin Province is the autumn and winter air pollution problems are most acute period is the peak period of fog and haze. To reduce the frequency of occurrence of fog and haze, to reduce emissions of air pollution, according to "implement the central Jilin Province Environmental Protection Inspector feedback reform program", Jilin cities to carry out the 2018 autumn and winter special law enforcement inspection of non-electric coal-fired boilers. Specific implementation of the program as follows.

2018 autumn and winter non-electric coal-fired boiler special law enforcement inspection action plan

First, the objectives

Through the "2018 autumn and winter special law enforcement inspection of non-electric boiler coal" action to further increase the intensity of emissions of air pollutants such as excessive penalties for violations combat, urge local governments and environmental protection departments to effectively implement the "Jilin province to implement the central environmental protection inspector feedback reform program, "Forced enterprises to speed up 10 tons of steam coal-fired boilers small and out of more than 20 tons of steam and non-electric coal-fired boiler pollution control facilities upgrade progress to ensure stable discharge standards.

Second, the scope of the inspection

Cities (prefectures) and Changbai Mountain Administrative Committee, Meihekou, Gongzhuling City, Hunchun.

Third, check the time

2018 Nian September 1 to November 30.

Fourth, inspection methods and content

Cities (prefectures) and counties under the jurisdiction of Changbai Mountain Administrative Committee to set up inspection teams to units in the area to take a cross peer review mode, Meihekou, Gongzhuling City, Hunchun to self-oriented.

The principle of mutual cross-check on the environmental violations found, the city's environmental protection departments at all levels in accordance with "should check to make investigation, should make a fine penalty, should be moved to make-shift" of errant given time out of the boiler, not dust removal facilities renovation no construction of desulphurization facilities are not required to install, networking, using automatic monitoring equipment, excessive discharge of pollutants and other acts take full advantage of "environmental law" and supporting measures to implement daily basis penalties, limited production shutdown, sequestration, administrative detention measures to deal with.

Focus on examination of the following:

(A) the progress of 10 tons of steam coal-fired boilers little out of work. According to "implement the central Jilin Province Environmental Protection Inspector feedback reform program," according to the time limit set by local governments, the progress of the phase-out of coal-fired boiler 10 tons of steam since 2014, the province's illegal 1570 newly registered units to be checked.

(B) more than 20 tons of steam coal-fired boiler non-electric dust removal, desulfurization facilities upgrade progress, automatic monitoring equipment installation, networking, usage. By ShengTing 6, July scheduling, the current to complete the rectification stage 717, stage 108 does not start the rectification, the rectification is 277, automatic monitoring equipment table 140 is not installed, the slow progress of the rectification. To complete the transformation around the boiler on-site verification, focusing on inspection facilities dust removal, desulfurization facilities upgrading and installation of automatic monitoring equipment, networking, usage. Percentage being modified, check the current progress of the major transformation of the situation, progress of the project, the time frame for completion, safeguard measures taken, it requires the use of boiler units issued commitments. For failure to start the transformation, to identify the main reason for not starting. If we do not transform the way in which the pin number to take all necessary construction and renovation tasks must be completed in accordance with the requirements of 30 September.

(C) boiler emissions standards. To install automatic monitoring equipment to monitor them than to confirm the validity of the data. For failure to require the installation of automatic monitoring equipment, shall be punished in accordance with relevant laws and regulations, at the same time supervisory monitoring, to determine whether to achieve a stable discharge standards.

Fall and winter heating season is the peak of Jilin Province, to ensure the normal heating units, we must also pay attention to boiler problems in the process of environmental protection. For the high-emission, high-polluting coal-fired boiler and other fuel boiler, to be banned or corrective action.