Manufacturing Companies boiler High Efficiency 20t

sugar refinery flow chart

Sugar Companies in India who using horizontal steam boiler :

Most gas-fired manufacturing companies boiler high efficiency 20t is installed in the boiler room, there is little left outdoors, outdoor use, and this is one way to protect the boiler. So, when building gas boiler rooms and internal structural arrangement, what are the precautions it?

the cautious layout of the horizontal manufacturing companies boiler high efficiency 20t chimney

The horizontal boiler, as a heat engine, has offered enough power for china’s industrial production. With the increasing application of the boiler, the problems raise. This passage will introduce the reasonable layout of the boiler’s chimney. After purchasing a boiler , the buyer need to install a chimney according to the boiler size and the site. The following are the relevant installation notions of the steel chimney and the brick chimney. notions for steel boiler chimney:

1.the steel chimney should be tough and hard enough. The chimney’s thickness should bear certain corrosion allowance. When the height of the chimney reaches 20~40cm,the diameter 0.2~1.0 m, the thickness of the body wall without liner should be 4~10mm, the body with liner should be 8~18mm.

2.The steel chimney’s lining can be born in subsection, the cracks between every two sections of 4~6m should be 20~50mm long. And the protection board should be installed on the top of the chimney. The chimney and the basic connection are made to conical support plate with the thickness of 20~40mm.

3.The steel chimney is better to choose the stainless steel one manufactured by the specialized factor. When the ratio of the chimney to the diameter exceed 20, a liable traction rope must be set, the rope should be 3~4 along the circle. Notions for the brick chimney :

1.the height of the brick chimney should not more than 50m. The chimney should be equipped with maintenance ladder and lightening rod. Meanwhile, the bottom of the chimney should be set with a 0.5~1.0m dust hole.

2.If there are two connections between the chimney and the horizontal flue, the two connections should be set in the opposite direction and be separated with a board . The part higher than the horizontal flue should not less than its half.

The fast manufacturing companies boiler high efficiency 20t related personnel monitoring center, started after the boiler, the boiler pressure, exhaust gas temperature and other sensors will automatically collecting various kinds of boiler operation data and real-time transmission through the mobile network to a remote monitoring center located at the headquarters of the fast boiler ; operating data once abnormal or deviation, the monitoring center monitoring personnel can detect and organize experts to analyze and issue alerts and corrective measures.