5000kgs gas steam boiler

Electric boiler supplying domestic matters need to pay attention what? 1, electric boiler carefully check each system before opening oven parts electric boiler, focused on checking the three security controls pressure gauge, safety valve, gas pipe fittings, water level is normal, everything is correct, put on compliance clothing to continue to work. Electric 5000kgs steam boiler 2, please do one-handed operation when the water in the electric boiler, water regulatory action is single-handedly opened the door in one hand and a water injector steam valve, when the water column to a predetermined level, the first valving (valving time face not being on the water, to prevent splash injuries face) and then turn off the water gate, electric boilers provide domestic water to be alert order can not be reversed. When electric boiler work, surrounding someone must guard the moment the water level and pressure gauges, there can be no neglect of duty, to adjust work schedules when working at night, night shift work, be sure to have a good rest during the day, not at night when this work I would doze off, because if there is any carelessness, accidents will happen. Points to note what? 4, electric boilers night to the boiler daily sewage treatment, water table should clean up once every night. For motor and other mechanical equipment have always been its inspection, if any abnormal findings, the investigation must be immediate. Weekly safety valve should be checked whether it is safe.

Combustion characteristics and operation of 5000kgs steam boiler steam for steam boilers everyone know how much will the following to let everyone have a preliminary understanding of the steam boiler by two aspects, but also hope to give a friend wanted to buy a steam boiler of some help. Chain-type layer is generally fixed combustible fuel steam boiler chain grate or a grate (the traveling), it is fixed only for small coal-fired boilers. The most commonly used medium-sized coal-fired boilers or for chain grate, as the chain travels will gradually sent to the tail of the coal grate in the process of moving complete fuel combustion tube from the inlet to the lower part of the grate grate internal supplemental air required for combustion, ignition top-down, no ventilation grate uneven seam and around the relative movement, through non-flammable. After heating area of ​​the heating flue gas temperature of the working fluid designed to flow through the same furnace hot flue gas and heating surface arranged in the other exhaust flue boiler. Incidental chain grate type, scale type, beams, and other means, the current domestic applications mainly for small and medium-sized joint type and scale type chain grate, generally large chain grate beam type. Former steam boiler steam boiler system to start all waterproof steam cylinder valve open, let go condensate. The inlet steam valve slightly open, to warm up the cylinder, drain cocks to be out after closing the steam, drain cocks. The steam valve was then opened progressively larger until drainage tank vent cock and water out there, and closed vent cock drain cocks. Turn on the water supply valve to the boiler feed water. Steam boiler in operation if there is gas in timely attention tank, water tank periodically open the air discharge valve, in order to avoid air resistance tank, the influent. Pump flow regulator bypass should be adjusted to achieve the degree of opening of the valve, and not with a method of adjusting the outlet valve is adjusted. At the rated discharge pressure of the pump, which inlet pressure should not exceed a predetermined value. Inlet and exhaust pressure difference should be maintained within a predetermined range. Steam boiler steam valve should be shut down first, then turn off the water valve and turn on the water valve is open, then turn on the water faucet open the lower part of the tank and cylinder, the cylinder water drain. Of steam cylinder reciprocating pump, which cylinder two stroke difference should not exceed 5% of rated travel.

Impact of vertical 5000kgs steam boiler efficiency is basically a bunch of the root causes of the country are carrying out high-profile coal to natural gas national movement, using the vertical steam boiler, very large cuts infected micro particles, toxic gases such as nitrogen oxides same time smoke has also been suppressed. Vertical steam boiler efficiency is a measure of critical standards, common look behind a pile of roots of the impact of vertical steam boiler efficiency. After investigation authorities, vertical steam boiler heat loss is probably due to include these two: undesirable heat loss and flue gas emissions than adequate combustion air. Emission reduction in heat loss can be retrofitted aft vertical steam boiler exhaust heat recirculation installation, or use more advanced types of condensing boiler. Combustion air is not sufficiently analyze the problem over the ratio: generally vertical steam boiler burner ejector, causing the air-fuel ratio can not maneuver scheduling. Lot of non-vertical steam boiler with automatic blower burner, leading to undesirable air-fuel ratio has the following several roots: air-fuel ratio does not contain points over about two cases: when oxygen is in excess, the excess cold air will have unlimited the effect of heat, resulting in increased operating costs vertical steam boiler, low vertical steam boiler efficiency; when oxygen is insufficient, will have insufficient incineration conditions, to produce low vertical steam boiler efficiency.

In order to further standardize Xuzhou City, air pollution control construction and operation management, protecting and improving the quality of the environment, prevent environmental pollution, introduced the "Xuzhou City in 2019 the thermal power industry, air pollution control basic norms." For the raw fuel storage, handling, transportation, storage byproducts, transport, collecting and centralizing the flue gas treatment systems and other aspects of the essence of the specific requirements.

First, all coal-fired units desulfurization facilities required to install, in addition to coal-fired circulating fluidized bed boiler units to be installed denitration facilities, coal and biomass fuel units to be equipped with efficient dust removal facilities. Desulfurization, denitrification, dust removal device processing capabilities must meet the production needs, we must be able to maintain long-term stable operation, must be professional manufacturers design, produce qualified products. Exhaust pipe shall be provided with permanent sampling ports and in accordance with national and regulatory requirements related to the construction of Jiangsu Province.

Second, the boiler produces air pollutants must be in accordance with national standards and requirements related to Jiangsu Province, construction of flue gas collection systems and centralized purification facilities, flaring has been the implementation of "coal to gas," "dry FGD" and included in discontinued closure plan outside the coal boiler, and the rest are required to install the cooling and dehumidification systems, and to ensure proper operation.