Energy Saving gas steam boiler Cheap Cyprus

Oriental Hawaii Holiday Hotel is located in Xiaogan City of Hubei Province in accordance with international five-star hotel standard design, set business rooms, SPA bath, foot care, indoor spa and other facilities in one of the hotel. Hot water boiler is one of the important facilities normal operation can not be separated. With the pace of Hubei Province in response to the national defense of the blue sky, the use of clean fuels gradually increase the proportion of Oriental Hawaii hotel provides visitors to the more perfect leisure experience a sense of the original wishing more polluted coal-fired boilers to replace clean and green gas-fired boiler. After comparing several vendors boiler industry, a number of R & D results very fast square value in the field of clean fuels, entered into a collaboration with the fast boiler. Fast boiler integrally provided a 1.4MW condensing pressure hot water boiler (CWNSL1.4-95 / 70-Y.Q) according to their actual needs. Put into use, fully meet the needs of Oriental Hawaii Holiday Hotel heating and hot water supply.

Boiler "four" leakage phenomenon determines: whether the output of hot water, steam or thermal oil, and regardless of using coal, oil, gas, biomass or power boiler, has the following "four", respectively, of boiler waterwall tubes, superheater tubes, reheater tubes and economizer tubes. It covers all four pipes of the boiler heating surface, the internal pressure of the working fluid bear, may be external to bear the high temperature, harsh environment corrosion and wear, excessive reconcile between water and fire, where the energy is concentrated is passed .

The beverage plant needs steam in its beverage degassing ,sterilization, and packaging process. 3 ton steam requirement per hour came from beverage plant steam requirements in all process. Then, why there must be WNS series, any other choice here? WNS series steam capacity is from 2 ton to 10 ton, more suitable for lower capacity energy saving steam boiler cheap cyprus. Of course, we also have SZS series which capacity is from 4 ton to 30 ton. To larger steam requirements, industrial gas oil fired power plant boiler is also available. If you want to use other gas fuels like lpg gas, bio-gas or liquid fuels like diesel oil, heavy oil, light oil, our WNS series steam boiler also can burn them. But, like our advanced engineer said before, each boiler is specialized for one designated fuel, this WNS series 3 ton steam boiler is manufactured to burn natural gas. Although it can burn other fuels, it can reach highest thermal efficiency when burning designated fuel natural gas.

Coal-fired boilers to gas-fired boiler and the basic requirements of a program, the transformation of the basic requirements: 1, the boiler must be carried out in accordance with "Steam Boiler Safety Technology Supervision" and "Hot Water Boiler Safety Technology Supervision" and relevant national technical regulations, construction program should be sent to the local technical supervision departments for approval. 2, to determine the value in use based on the transformation of the boiler has the age and state of the art, taking into account the life expectancy of the boiler. If the boiler use a longer useful life, and the pressure there is a serious corrosion, scaling and overheating phenomena such elements, no transformation of value. 3, boiler walls, chimneys, water supply and air supply, the wind system should remain largely intact. 4, after the transformation of the original technical parameters should be kept constant boiler (operating pressure, temperature, etc.) or the load and to improve the efficiency of the original boiler. 5, after the boiler should comply with national environmental and technical indicators, solve the problem of smoke and dust, meet environmental requirements. 6, when the boiler should try not to change the original pot, and the body is pressed by the original system architecture, covers the smaller the better. 7, rehabilitation programs should be simple, low investment, short construction period and quick, safe and reliable. Second, the transformation method: 1, removal of the original coal-fired boiler slag machine, equipment on coal, dust, chain grate and gearbox. 2, according to the diameter and length of the flame, furnace installation height determining geometric dimensions and the burner. 3, making the furnace, the furnace bottom refractory brick, a semicircular shape. 4, the front arch openings mounted burner nozzle. 5, after that the flame away from the center position of the tube the arch, the arch of the pipe on the basis of the original slope, heightening baffle wall, the protective tube arch. 6, install blast doors. 7, install the induced draft fan drive. 8, the body of the boiler water test pressure 1.5 times the working pressure. 9, the automatic control system installed. Third, the technical proposal: 1, furnace design should consider the flame length and diameter of the flame of the combustion gas, so that the furnace space is filled with the best of the flame, the flame not Wall flush. 2, as the main component of natural gas CH4, H20 generated after combustion, steam share large, so that strong radiation, heating furnace suitably increased to take advantage of the radiation heat transfer, thermal efficiency, reduce the consumption of steel, ensure that the boiler output, and may increase the boiler output. 3, a slight positive pressure within the boiler furnace using a combustion or slightly negative pressure, the sealing performance of the boiler furnace walls to strengthen, not air leakage. 4, due to the smaller excess air ratio of the gas boiler, combustion requires less air flow, coupled with the removal of dust, dust and small flue system, the flue resistance is reduced, a large surplus primer fan flow, using file when the damper plate adjusting the power loss is large, frequency control can be induced draft fan air volume regulation. 5, after the furnace door and see the fire smoke chamber above the chimney, mounted two proof doors, in order to improve the antiknock performance of the boiler. 6, the boiler flue gas the volume of gas in the vapor component is generally 15% to 19%, well above the coal-fired boiler flue gases generated in the water vapor content of 6% by volume or less. Boiler shutdown and startup, due to the low wall temperature of the boiler heating element, when less than less 50 ℃, the flue gas water vapor dew condensation on the wall will, if not removed condensate with the condensate of the contact wall would be C02 acid gas corrosion of furnace wall and the insulation material due to water absorption and thermal insulation effect will be lost. Therefore, before and after the gas hot water boiler smoke box and the rear box and the rear flue smoke condensate discharge means to be provided, promptly boiler condensate removal. 7, the gas boiler-system control function should have combustion process. Pre-blowing may be implemented, auto-ignition, flame detector self-test, automatic load adjustment, flame monitoring, fault alarm interlock shutdown, the gas leak detection valve, induced draft fan and burner control sequential chain protection. 8, in order to prevent fluctuations in the gas pressure regulator to meet the burner requirements, the installation of a gas regulator metering panel outer gas inlet in the boiler room, the surge counter can be accomplished by filtration, regulating, metering, safety shut-off functions.