Low Price 4 ton High Efficiency boiler Myanmar

1, to prevent the occurrence of hot water low price 4 ton high efficiency boiler myanmar furnace explosion

First on the boiler design, should be strictly in accordance with the requirements of GB50041-1992 "boiler room design specifications" are thermal calculation and strength calculation, structural arrangement should be reasonable, material quality should meet the requirements. Boiler manufacturing, construction plans should ensure compliance with national quality boiler scale delineation. Boiler safety accessories should be complete, agile and reliable, and maintenance schedule, often check on the failure of the attachment timely replacement. Schedule for maintenance of the boiler, the outer part of the boiler maintenance, subject to the existence of timely repairs and reconstruction to ensure test quality standards.

The power sector has established the necessary framework for the development of RE power projects. Indonesia has a strong agricultural sector and therefore a large potential to use residues from the agro industry as feedstock for power generation. It is for these reasons that the demand for biomass power station low price 4 ton high efficiency boiler myanmars in Indonesia is growing. We have comprehensively considered the customer's needs, location, boiler room size, fuel supply and other information, providing the Indonesian customers with a 3MW szl series biomass steam boiler for power generation.

Tongchuan City, Shaanxi Province is located in Fenwei plain, it is China's major coal producing area, the unique geographical location determines the Tongchuan coal energy as one of the main economic development. Tongchuan coal to bring rapid economic development, but a large proportion of heavy industry, atmospheric pollution and other issues are very serious. "Winning Blue Sky Battle three-year action plan" published this year, Fenwei plain was a key governance areas. Coal City is not achieved coal, coal is not coal, promote clean heating, Tongchuan City is a serious problem.

Tongchuan party secretary said: "This year Tongchuan 4905 ex situ poverty alleviation relocation of the masses of resettlement housing has been fully completed and turnkey, the actual stay 3763, is a large-scale relocation of mass arrival of new homes in the first year."

After a preliminary investigation, Tongchuan City to improve people's livelihood and environmental protection together, launched a "warm life, warm hearts and minds" of warm winter action. Based on the concept of local conditions, it has been completed in 40 of the city's centralized settlements, reduce operating costs, clear charges. Mastery of natural gas household heating settlements, natural gas boiler wall encouraging people to self-heating; central village of rural resettlement and scattered resettlement households, encourage and guide them to use electric heating and cleaning of heating equipment. All use of clean heating devices are available to the masses 1000 yuan subsidy.

Clean heating, an impact on the masses warm winter, a relationship with Blue Sky Battle Action Plan. It is understood that the city of Tongchuan coal-fired boiler to achieve a global "clear" in 2017. 2018, Tongchuan City by town gas central heating and household heating, rural households in accordance with the appropriate air dispersion of the gas, should the electric power, should be hot is hot, use clean coal coal should guide the masses to reduce the amount of bulk coal use, and the use of clean energy and the masses of poor people winter heating subsidies. Currently Tongchuan City, completed a total clean energy alternative to coal for 27,897, of which 25,196 coal to electricity, coal to gas 2701, the city's clean heating rate of 82%, the basic realization of the coal city does not burn coal, coal is not coal.

According to Eco-Environment Department data show that 11 cities Fenwei plain mean concentration of PM2.5 in October this year to 48 micrograms / cubic meter, down 7.7% year on year. The lowest average concentration of PM2.5 is Tongchuan city, is 38 micrograms / cubic meter.

Installation should be qualified to assume professional installation of the low price 4 ton high efficiency boiler myanmar unit. Before boiler installation, using either their own units installed or installed by a qualified professional install the unit, construction units installed boiler must be examined and approved through the provinces, autonomous regions, municipalities directly under the boiler and pressure vessel technology supervision department. Please install the specialized units should be held with the boiler level, consistent with the type of installation boiler installation license. Professional installers should save and technology supervision department for examination and approval, and explicitly allow installation scope (including pressure, volume, type of assembly), and issued a permit to install the unit.