Agent Price Industrial 2t Natural Gas boiler Malaysia

At the end of 2018, Yantai City, Shandong Provincial People's Government Office issued the "Yantai Blue Sky win the Battle of three-year action plan implementation details," "rules" that: in principle, to new natural gas cogeneration and gas chemical projects. Details are as follows.

Continued implementation of the total coal consumption control, by 2020, the city's total coal consumption control in less than 24.19 million tons. Developed and implemented 2018-- 2020 coal consumption reduction alternatives work, the coal consumption Yajian task decomposition implemented in urban counties. Strict control of new coal project approval, approval, filing, encourage natural gas, electricity and other clean energy alternative to coal consumption. Censorship perfect substitute for coal, improve coal reduction coefficient replace coal utilization efficiency low industry. All new, revision, and expansion projects are implemented coal coal reduction alternatives, strict implementation of alternative sources and alternative proportions.

The development of special programs, out of shutting down environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance, the following priority out of 300,000 kilowatts to run at least 20 years of pure condensing unit, run over 25 years and Condensate Pumping Units still can not reach ultra-low emission standards for coal-fired units. For shutting down the unit's capacity, coal consumption and emissions targets, allowed to trade or replacement, can co-ordinate arrangements for building the capacity of ultra-low emission coal-fired units.

Accelerate the phase-out of coal-fired facilities tea furnace built in the urban counties of the region, operating a stove, grain storage and drying equipment. The city's ban on new 35 steam tons / hour and coal-fired boilers. 65 steam tons / hour or more coal-fired boilers on the basis of complete transformation of the ultra-low emissions, with the transformation of the conditions to complete all energy saving. Out of coal-fired boilers heating pipe network coverage range. In the area where no cogeneration district heating conditions, a plurality of existing coal-fired boilers, and the like in accordance with the principle of building a large-capacity volume replacement coal-fired boilers.

The implementation of non-fossil energy doubling action plan, by 2020, non-fossil fuels in energy consumption should reach its goal provincial requirements, the city's wind power, solar power, biomass power, pumped storage power generation, nuclear power and other new energy and renewable energy power generation capacity reach 7.05 million kilowatts. Where the conditions of availability of resources, to encourage the development of biomass cogeneration county, increase renewable energy consumptive, improve social proportion of the total electricity consumption of renewable energy generation.

The CFB agent price industrial 2t boiler malaysias will replace typical pulverized coal (PC) units that are outdated and worn out. Combustion of high-ash anthracite in the CFB boilers is inefficient, requires considerable co-firing of natural gas and produces high SOx and NOx emissions. The important boiler design and performance parameters, such as furnace height, fuel and limestone sizing, solids recirculation rate, combustion efficiency and emissions performance, were developed using the results of high-ash anthracite pilot CFB testing.

SZS oil gas fired horizontal steam agent price industrial 2t boiler malaysia

Horizontal industrial steam boiler manufacturer

Gas agent price industrial 2t boiler malaysia transformation precautions so that your boiler is more successful transformation

Under our frequent introduction of environmental policies, many units use coal-fired boilers or other fuel boilers are faced with the situation of the boiler. Provinces for the introduction of atmospheric emissions policy, boiler "coal to gas" imminent.