Industrial Supplier 2t oil boiler Cambodia

To proceed from reality, should be in accordance with the electric power, gas should the gas, the coal should be coal, should be hot the thermal principle, promote the use of all kinds of clean energy for winter heating cleaning. In order to reduce air pollution and protect people's warm winter as a foothold to enterprises, government promotion, residents can withstand the principle of gas after the first change to gas will change in gas assurance, the price is acceptable on the basis of sound promote the "coal to gas" and central heating engineering, in district heating supply pipe network can not cover, vigorously implement the replacement of coal-fired power heating project.

Good job of marketing system storage capacity for natural gas. Accelerate the construction of natural gas transmission and distribution network, the new natural gas volume priority for life and severe winter areas of urban air pollution and coal for heating alternative. In principle, to new natural gas cogeneration and gas chemical projects.

Accelerate agricultural and pastoral areas "coal to electricity," the process of upgrading the power grid. Coordinate development of power transmission project construction, etc. are encouraged to promote the regenerative electric heating. Around on the "coal to electricity" project supporting grid should be given support, coordination "of coal to electricity," "coal to gas" land for construction.

In accordance with national requirements, shutting down environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance. For shutting down the unit's capacity, coal consumption and emissions targets, allowed to trade or replacement, can co-ordinate arrangements for building the capacity of ultra-low emission coal-fired units.

According to air quality improvement requirements to accelerate the delineation of high-pollution fuel combustion zone ban and to expand the scope of, and actively promote the elimination of small coal-fired boilers. The county level and above urban area basically eliminated 10 tons of steam per hour and coal-fired boilers and tea furnace, stove and other operating coal-fired facilities, in principle, to 35 tons of steam per hour, the new coal-fired boilers, in principle, other areas on no new 10 tons of steam per hour of coal-fired boilers. While banned out of coal-fired boilers, pressure boilers market regulators cancellation of registration certificate to use.

Horizontal Style and Natural Circulation Type Boiler Gas Fuel

Most factories or industries need steam boilers during their daily production process. Horizontal style steam boiler with fast assembly feature get more and more popularity in the market. ZG Boiler manufactures both horizontal style boilers and vertical style boilers for different industry fields. Take an example here, ZG Boiler manufactures WNS and SZS steam boiler fire gas or oil is horizontal type in designs. Besides, natural circulation type for burner combustion can improve boiler thermal transferring efficiency. Today, I will introduce our SZS horizontal style and natural circulation type steam boiler, gas fired, in particular.

Burner and flue installation and electrical installation and the fuel supply system of the burner 1, burner 1) before installation read "burner manual", according to the installation requirements. 2) Burner mounting flange, the middle requirements, to ensure the burner to the industrial supplier 2t boiler cambodia flue gas does not leak at the interface. 2, the installation of fuel supply system (see schematic) Note: To prevent a fire caused by generation of static electricity in the fuel tank, the tank should have a good grounding. 1) supply system tank top tank top-feed system suction recommended distance between the back plane and the tubing inside diameter of the oil pump axis, the total length of the suction pipe Hm, m, no greater than DL6-34DL40-75DL100-250Di = 10mmDi = 14mmDi = 16mm0.51.03030401.535452.03535452.540503.0404050 Notes: (1) when there is an elbow or valve on the suction pipe, each of the length of the suction pipe to be minus 0.25m. (2) Di recommended internal diameter suction pipe and return pipe. 2) the distance between the bottom of the tank bottom of the tank supply system supply system pipe inner diameter recommended oil pump axis and a plane, the total length of the suction pipe Hm, m, no greater than DL6-34DL40-75DL100-250Di = 10mmDi = 14mmDi = 16mm1.03030401.535452.03535452.540503.04040504.045 Notes: (1) when there is an elbow or valve on the suction pipe, each of the length of the suction pipe to be minus 0.25m. (2) Di recommended internal diameter suction pipe and return pipe. 3, gas pipe installation requirements Burner gas line itself has been connected, the intake port, the intake pipe bends should be minimized and good sealing performance requirements, to prevent leakage. (Iv) a chimney installation, to prevent leakage, the leakage of smoke, to prevent smoke inhalation chamber. 2, a vertical mounting, a right angle bend bends should be avoided. 3, the top of the chimney must be water-resistant measures. (E) mounting a power switch with electrical connection box 1, the power switch should be considered easy to operate, away from heat, fixation, meet the design requirements. 2, the use of 220V (380V), 50HZ power source, and a ground line. 3, voltage instability in the region use, should be safe regulators. Or affect the normal operation of the combustion engine. 4, the power cord to the electrical box must be connected in strict accordance with the requirements, otherwise, there will be dangerous!

(9)Combustion Adjustment method of Oil-fired Gas-fired Boiler

The combustion adjustment of oil-fired gas-fired boiler is successful and the load adjustment can be carried out after turning into normal operation. At this time, the combustion situation in the furnace should be observed frequently. If the atomization of oil and gas is not good, the flame jumps, the flame hits the furnace tank, and the exhaust temperature is too high or too low, the oil pressure, oil temperature, steam volume, air pressure and steam pressure should be adjusted in time to ensure the safe and economical operation of the boiler. The oil pressure and the pressure are related to the boiler load. The adjustment of the oil pressure is realized by adjusting the pressure of the burner or the amount of oil returned. The adjustment of air pressure is achieved through the opening of the valve. When adjusting a load, enter At the same time, the air volume adjustment must be carried out synchronously to ensure the reasonable match between the oil quantity and the air volume, so as to achieve the purpose of economical operation of the boiler.