power station natural gas hot water fire tube boiler

25 tph SZS condensing gas-fired steam power station hot water fire tube boiler project for food industryA steam boiler is a piece of vital equipment in the production processes of food industry such as stewing, drying, concentrating and sterilizing.  Jiaozuo Yuzhu Instant Noodle Company, affiliated with Henan Province state-run Boai Farm, is a national professional manufacturer of instant noodles with the annual production capacity of over one hundred thousand tons; the instant noodles produced by the company are sold very well all over the country. China is advocating the development of green economy in recent years; Henan Province is vigorously controlling pollution and reforming coal-fired boilers to gas-fired boilers. As the only state-owned enterprise of instant noodle industry, Jiaozuo Yuzhu Instant Noodle Company actively promoted the "coal to gas" action and ordered one set of 25 tph gas fired boiler (SZS25-1.25-Q) from ZOZEN. The boiler is equipped with a large volume furnace and an advanced imported low NOx burner to effectively reduce the NOx emission. In addition, the boiler adopts the design of membrane water wall; the gastight test must be done before installing thermal insulation layers, to ensure there is no flue gas leak under the condition of micro-positive pressure combustion and help reduce the heat loss of the boiler body; the thermal efficiency will reach up to 98%.

Comparison of natural gas and coal-fired power station hot water fire tube boiler boiler: natural gas, including natural gas boiler water boiler, gas hot water boiler, gas steam boiler, which is also called natural gas hot water boiler natural gas heating boilers and gas boilers bath, days as the name suggests refers to the gas-fired boiler fuel for the boiler of natural gas, natural gas boilers and oil-fired boiler, electric boiler compared to the most economical, most people have opted for natural gas as a steam boiler, heating, boiler equipment for bathing. Gas boiler comprising KS-Q water natural gas boiler, CLHS (CWNS) natural gas hot water boiler, LHS (WNS) natural gas and steam boiler, wherein the natural gas comprises a natural gas hot water boiler heating boilers and gas boilers bath, with the realization of the country "West-East" project, natural gas boiler gradually become the people's choice. "Special Equipment Safety Supervision Regulations" as defined in the boiler is the use of various fuels, electricity or other energy sources, the costumes, the liquid is heated to a certain parameter, and external heat output devices. Which is defined in a range equal to or greater than the volume of the pressure of the steam boiler 30L; outlet pressure is greater than or equal to 0.1MPa (gauge pressure), greater than or equal to the rated power and the pressure of the hot water boiler 0.1Mw;

Industrial gas steam power station hot water fire tube boiler room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger. Industrial gas boilers small volume itself, and these need not be equipped with auxiliary equipment, simply set up between a host and auxiliary room, set on more messy, covering economy. Industrial gas boiler city gas source is generally taken from the intermediate pressure gas supply line, the gas pipeline laying gas sampling point to the boiler room, then according to quell's brand, type and caliber regulating device applications, scheduling outlet pressure range, by metering the put into use. Establish a set fee just gas network tariffs, pipeline fees, hot walks pipeline fee. Gas pipeline network overall cost of capital is the sum of the gas company funds charged to the user, it can be determined depending on the circumstances around the gas company. Usually adopted buried gas pipeline type, buried depth is generally about 0.8m ~ 1.0m, seamless steel pipe can be selected or PE pipes, pipe surrounding sand 15cm ~ 20cm plating, hot water pipe laying relatively simple, somewhat messy steam pipe walks . 3, industrial gas boiler room planning results in the presence of 3.1. Selection of the size of the heat load of the boiler and its expansion tend to choose the boiler capacity, the number of great links. The larger heat load, single boiler capacity should be large. The near future can be greatly increased thermal load, it is also relatively large capacity boiler can choose, it will expand the load thought. The only thought to increase the long-term thermal load, the expansion device may leave the boiler placeholder deployment end in the boiler room, or space left on the total FIG. However, in the practice of project planning, often there is a lack of expansion heat load estimates, constitute improper boiler selection, pre-operation to cause unnecessary trouble. 3.2. Gas boiler gas regulator trivial results generally used in high-pressure (less than 5kPa) and medium voltage (5 ~ 150kPa) trivial. Gas usually before entering the boiler room will arrive this requirement. Now the gas hot water boiler is equipped with a high level of automation subsided, a calm requires the gas pressure is lower, so before further demand into a calm pace pressure boiler manufacturers themselves generally equipped. Gas pressure regulating trivial demands reliable equipment, but on the size of the gas pipeline valve is open due to the gas pressure when scheduling the gas pressure is high or low, and tempering will cause off, start and stop frequently subsided's configuration, thereby affecting the boiler work. 3.3. Gas boiler quality results planning standard gauge, the quality can not be ensured when the gas, should be provided or dust, oil and water, respectively, and a total closed drain valve before the gas main pipe before the regulator device. Most of the oil production plant in the use of oil with anger, it is often said of moisture in the summer cold weather, moisture and light hydrocarbons and other substances containing moisture, condensation will constitute a line blockage, an initiative to quell the flame, impact Heating. 3.4. Chimney condensate results because of the high thermal efficiency of industrial gas boiler, a low exhaust gas temperature, typically 180 degrees, the boiler room planning criteria (GB50041-2008) rules industrial gas boiler room chimney should be reinforced concrete or steel chimneys chimney. Chimney will appear directly in the outdoor summer steel chimney condensate freezing results, constitute icing light rusty steel chimney, would constitute a temporary corrosion, freezing severe affect chimney smoke. 3.5. The amount of air to quell the outcome's when quell Industrial gas boiler is in the boiler room, the air between the boiler must be satisfied the requirements apply to quell the device, otherwise there will be no abundant natural gas to quell working carbon monoxide poisoning.

The Hulun Buir City, Inner Mongolia, due to its special geographical location, well into the cold season, heating power station hot water fire tube boilers put into use. Safe use of district heating boiler equipment, Hulunbeir special inspection carried out the inspection work to ensure the operation of heating boilers for the Evenki Autonomous Banner Dayan Town, tie Nihe mine, Bayan hematoxylin lofty Kong and other regions.

Inspectors checked one by one aspect of the boiler, safety accessories, ancillary equipment, water quality management and data review and so on; and the verification process in all corporate communications using the boiler should pay attention to regulatory knowledge and safety knowledge, urged business executives to issue timely corrective to ensure the safe use of heating boilers.