hot water boiler For Sale 1t Commercial Myanmar

Hotel owners and operators demand uninterrupted service when it comes to their domestic hot water and heating needs. ZGhigh efficiency gas fired hot water boiler for sale 1t commercial myanmars for hotel central heating are field tested to perform reliably and safely with little maintenance.

2. Classified by application

Power station boiler: It is used in boilers of thermal power plants with large capacity, high parameters, new technology and strict requirements.

Steam boiler is one of the indispensable devices in the pharmaceutical industry, decoction of Chinese medicine, medicine drying, sterilization, cooking gum, drying, tabletting and capsule production processes, a large amount of steam will be used. West Libang Pharmaceutical Co., Ltd. is a pharmaceutical research and development, production and sales of high-tech enterprises, the existing anesthesia, cardiovascular, child immunization, pharmaceutical raw materials, pharmaceutical excipients, nutrition series of six automated production lines. With the increasing strength of China's environmental protection, some high-pollution devices are making the transition to clean environmental protection. Libang Pharmaceutical respond positively to national coal to gas policy, decided to change the existing coal-fired boilers to clean better gas steam boiler. Fast boiler with strong comprehensive strength in the field of clean energy, Libang Pharmaceutical after conducting comprehensive consideration, determined to cooperate with the fast boiler. The two sides further understanding, party fast technical engineers according to production needs state power, and soon its development of specific solutions for its recommendation of a 6 tons of steam condensing gas steam boiler (WNS6-1.25-Y.Q).

6 tons of steam boiler maintenance procedures introduced 1, boiler during operation should pay attention to the following points: (1) does not allow pressurized combustion furnace flame, or easy to damage the door, watching the fire door and unsafe. (2) should be regularly blower, fan, electric water pump fuel. (3) It should be noted arch brick without loss, with or without overflow wall furnace fire phenomenon, identify problems and timely repair, repair shutdown if necessary. The bottom surface (4) shall boiler water to prevent corrosion of the base. (5) The class filter at least once to open check. 2, 2 a boiler operation three weeks should carry out a check. (L) before opening the flue, if smoke tube fouling should be removed, such as less fouling or non-fouling, cleaning time may be the Director, opened once a month, if still no fouling extended 2-3 May start time, checking after each turn, must be locked, shall not leak smoke. (2) Open once each class cleaning door, cleared out the gray tone, without fouling or fill extend cleaning time, according to the actual situation in the hands of fireman, and explore the experience. (3) water gauge, valves, piping, flanges, etc. should be repaired as steam leakage. (4) boiler 2 to 3 months, to the water wall, pipe and be cleared of soot ignition face. Run 3 to 6 months after the shutdown should be all inspection and maintenance. (5) inside and outside of the boiler inspection, such as the partial pressure weld steel corrosion; If it is found serious deficiencies should be repaired, if the defect can not leave shutdown repair, found suspicious, but does not affect when production safety, records should be made for reference during processing. (6) can be checked and the coated portion of the boiler water to prevent corrosion paint. (7) if necessary insulation furnace wall outer casing removed to provide a thorough examination of the prior seriously damaged portion, only after continued use must be rehabilitated, checked and repaired while the person filling the case of the present security technology registration boiler. (8) housing the heat insulation layer (outer sheath), a paint duct at least a year. (9) Maintenance of long-term without the boiler, dry and wet, dry application shutdown more than a month, the following month shutdown can be used wet maintenance method.