Industrial 1t Natural Gas boiler Supplier Brunei

Chemical plant four tons electric industrial 1t boiler supplier brunei price is how much chemical plant four tons of steam electric boiler steam price is how much? Now, with the increasingly more stringent environmental requirements, many companies are using natural gas boiler, but there are places, not very rich natural gas resources, therefore, only electric heating boiler. Electric heating boiler with the most current output is steam. Recently there Chemical Consulting 4 tons electric boiler steam price is. For four tons electric steam boiler prices, the market there is still a great distinction between intervals, can differ by tens of thousands, for businesses, do not blindly choose low-priced products, this is the case, the latter is very troublesome. Electric steam boilers currently fast boiler 4 tons of around 360,000. For businesses, choose a bad boiler manufacturers, although the low cost pre. But time later use of the boiler, the cost of maintenance of the latter is very high.

You must know the industrial 1t boiler supplier brunei energy problems (induced draft fan power consumption rate, steam consumption) draft fan causes problems 1.1 boiler flue dust and fouling, in particular air preheater fouling, resulting in increased resistance to smoke duct . 1.2 boiler flue, tail heating surface and dust leakage. 1.3 Leakage Rate large air preheater. 1.4 furnace excess air coefficient is too large. 1.5 unit load changes, run the adjustment is not timely, resulting in furnace pressure is too large. 1.6 unit load or low frequent starts and stops. 1.7 coal into the furnace worse, from the design value. 1.8 low efficiency filter. 1.9 draft fan blade badly worn, low operating efficiency. 1.10 fan outlet flue gas desulfurization big resistance. 1.11 soda boiler pipes for leaks. 2, 2.1 to 2.1.1 operational measures to solve the problem of the strict implementation of soot blowing system to prevent the heated area ash, blocking ash, flue gas system to reduce resistance. 2.1.2 holding the induced draft fan, the flue gas separator baffles and dampers in the fully open position. 2.1.3 The experiment showed combustion boiler, proper control of excess air in the furnace. 2.1.4 adjustment chamber negative pressure, air leakage reduction furnace and the flue. 2.2 routine maintenance and testing 2.2.1 induced draft fan performance test to determine the optimum operating point and efficient workspace. 2.2.2 boiler, air preheater, a flue, ESP and other system leakage inspection, process. 2.2.3 timely check processing chassis, shaft seal leakage. 2.3C / D repair, eliminating defects 2.3.1 down strict accordance with movement clearance adjusting fan. 2.3.2 induced draft fan blade defect action elimination hand vane opening adjustment. 2.3.3 Importers and induced draft fan baffle opening check. 2.3.4 duct tightness check process. 2.3.5 wave plate replacement air preheater, rinsed sector plate gap adjustment. 2.3.6 eliminate dust defects and improve collection efficiency. 2.3.7 clean flue gas desulfurization system, flue resistance is reduced. 2.3.8 eliminate soda boiler pipe leakage defects. 2.4A / B repair and transformation 2.4.1 Check and repair the fan blades, replace seriously damaged blades if necessary. 2.4.2 for energy saving fan efficiency below 75%. 2.4.3 The fan motor frequency transformation. 2.4.4 of the precipitator, if necessary, transform and improve collection efficiency.

1. oil and gas steam industrial 1t boiler supplier brunei system

A complete gas boiler system mainly includes the boiler body, burner, control system and other auxiliary structures

Mr. Lu Haigang mechanism for promoting the company's innovative company with a brief overview of the results related to the design and operation of the industrial 1t boiler supplier brunei were carried out on-site laboratory report. Mr. Jiang Zuojun hardware and software technology R & D infrastructure of the group now has a fully affirmed and expressed the company play a greater role in the adjustment of domestic environmental protection in low-emission structure expressed expectations.