30ton oil cake steam boiler

Fuel gas-fired boiler fuel gas-fired boiler product presentation is different from coal-fired boilers, which requires the use of a burner fuel is injected into the boiler furnace using a combustion chamber without the use of fire grate facilities. Because not produce fuel ash after burning fuel gas-fired boiler, fuel gas-fired boiler so without slagging facilities. Oil injected into the furnace, if the gas and air mixture within a certain range, or turned off, it is easy to explode. Therefore, fuel gas-fired boiler combustion required to adopt automation and control systems. Fuel gas boiler compact, small boiler and ventilation, water supply, control and auxiliary equipment are arranged on a distribution box, it may also be assembled and medium-sized factory. Fuel gas-fired boiler safety valve installation points introduce fuel gas-fired boiler safety valve needs to be installed in the correct installation steps, in order to avoid mistakes, resulting in what needs to pay attention to danger, fuel gas-fired boiler safety valve installed it? Here, I introduce: 1 fuel gas boiler safety valve should prevent the lever means and movement of the self-weight limit leverage deviant guide tube, a spring safety valve should lift and handle means for preventing movement of the adjustment screw is screwed lightly . 2. Rated to 0.5t h evaporation boiler fuel gas /, at least two safety valves installed; Rated evaporation 0.5t h or less fuel gas boiler /, mounted on at least a safety valve. The separable exit of the economizer, steam superheater outlet of the safety valve must be installed. 3. Fuel gas-fired boiler safety valve to the boiler tubes, cross-sectional area should not be less than the import safety valve cross-sectional area. If several valves installed together with a short tube directly connected to the drum, short tube passage area not less than 1.25 times the area of ​​all the exhaust valve. 4. Fuel gas boiler safety valve should be installed vertically in the boiler drum, header high position. Between the valve and the drum or header, not equipped with access to the steam outlet pipe and the valve. 5. For rated steam pressure less than or equal to 3.82MPa boiler safety valve throat diameter of not less than 25mm; the rated steam pressure is greater than 3.82MPa boiler safety valve throat diameter of not less than 20mm. 6. Fuel gas-fired boiler safety valve should normally be installed exhaust pipe, exhaust pipe should be through a safe place, and there is sufficient cross-sectional area to ensure the smooth flow of exhaust. Safety valve exhaust pipe at the bottom should be fitted to the safe location of drainage pipe, the exhaust pipe and drainage pipe not allow the installation of the valve.

Power plant boiler working principle

Power station boilers are an indispensable device in thermal power plants. They generate high-temperature and high-pressure steam by burning various fuels (coal, oil, natural gas, biomass fuel, etc.). This steam is used to drive a steam turbine. Generator attached to the steam turbine generating electricity.

Hot water boiler heating mode, which has several? Indirect Heating boiler water: high temperature hot water supply system, and by directly converting the high temperature hot water heat transfer station is a low temperature and a low temperature heating system running hot water. The system contains two separate high and low warm water circulation, two lines standing pressure. Due to the heating system in their assembly separate water circulation system, high and low temperature circulating pump system, a separate area, the presence of equipment investment, operation maintenance, staffing, secondary energy consumption, infrastructure investment, covers and many other issues. Daily fuel tank hot water boiler provided steam heating means and electrical heating means, hot water boiler when cold start ignition furnace, because there is no electric heating steam, hot water boiler when the ignition is successful and handover immediately after the steam generated steam heating. Indirect heating of running hot water boiler with high viscosity heavy oil, in addition to a mechanical pulverizer means daily heater heating the oil in the tank to supply the service required corresponding to a temperature suitable viscosity, the heavy oil is pumped to Front heater - secondary heater again, the latter is to meet the needs of high temperature water boiler oil atomization nozzle. Thus, the heavy oil mainly for secondary heating boilers burning fuel, the other part is small in the circulation tank return line back into the household.

Recently, Xi'an, Shaanxi Province take minus coal, train control, dust suppression, government sources, prohibiting other measures, the air pollution caused by human factors reduced to very low, efforts to improve air quality in Xi'an winter. As of early November, Xi'an has cut 100 million tons of coal-fired, 15 high-ranked companies relocate or shut down.

In 2018, the Shaanxi provincial government issued a formal mandate to inform, Xi'an total of 140 million tons of coal to reduce the task, mainly around the Xi'an city government to cut electricity, central heating boilers Chaigai, urban and rural residents scattered coal and gas supply security in four areas of governance to carry out jobs. As of the end of October this year, has cut coal 1.015 million tons, completed 70.7% year plan. Built area of ​​29,419 catering units are the use of clean energy, outside built-up area 5196 catering units are to switch to clean energy.

Vehicle exhaust is one of the sources of atmospheric pollution. In order to strictly control the "black tail", environmental management staff at the three-ring along the line, passenger stations, farmers market, food stores and other black smoke high incidence of vehicle checkpoints set up 423-bit, low-speed vehicles investigated a total of 71,300 cases to go cut the line , black smoke car 7027 cases.

In the "anti-summer period", Xi'an continue to implement the motor vehicle limit line of control measures, and completed the 3255 update of pure electric buses put into operation, the completion rate of 102%. Newly started construction of public parking spaces 12,908, 86.1% completion rate. Investigate ChaoBiaoChe 3504.

In terms of the source rule, Xi'an cumulative Mopai "scattered dirt" Enterprise 21021 (including New West Ham), complete renovation 8163, completion rate of 38.8%; 15 high energy consumption, high emission enterprises to complete the relocation or shut down; 3399 Taiwan low nitrogen gas boiler to complete the transformation, the completion rate of 99.4%.

40 industrial enterprises complete control of volatile organic compounds, the completion rate was 88.9%; 26 224 restaurants and stalls point to install smoke purification facilities; 1259 spray paint auto repair business to complete in-depth treatment of exhaust gas, and all the installation of pollution control equipment independent meter; the Third Ring Road 336 gas stations outside the full completion of the transformation of tertiary recovery of oil and gas, and all the installation of pollution control facilities separate meter.

In terms of prohibiting, Xi'an completed summer crop straw comprehensive utilization area of ​​249.82 acres of mechanization, comprehensive utilization rate of 95.4%, exceeding the target task. At the same time, organized and implemented six acres and nine provincial and municipal straw utilization demonstration projects, compared with the provincial target increase of 12.5 percentage points; investigate and deal with the problem of black smoke burning from 457; 8 consecutive years of summer and autumn straw Jinshao to achieve "zero fire point" goal.

This year, the Xi'an handled a number of prominent air pollution problems. City of iron-fisted rule examination revealed a total haze to do all kinds of air pollution problems 1862, the city set up a team of 153 people to strengthen the supervision and inspection found problems common enterprise 6128, cross-check inspection found a total of 11,781 business problems. These issues are issued under the supervision of the list of issues to be reform.