oil central heating boiler for chemical industry

Classification and characteristics of oil-fired central heating boiler for chemical industry which when the weather gets colder, people will choose different heating methods, which have a more convenient way is oil-fired boiler, but many people do not understand his usefulness, then together below take a look. Category: oil-fired boiler is the practical use of fuel, the boiler various boiler with diesel fuel and waste oil, his overall construction and arrangement of the gas boiler is similar to a common classification of mechanical and steam materialized style. Features: Multi-Fuel bottom of the pot is made of the holding furnace bottom is inclined to the back wall for holding furnace bottom, in order to obtain good combustion characteristics. This is not the kind of boiler for the gas pipeline, also want to be able to lower the cost of the normal operation of the boiler, then oil-fired boiler is a good choice. Oil-fired boiler is an important sign of progress now era, the purpose is to serve humanity well, according to further improve the people's needs.

Construction of gas steam central heating boiler for chemical industry steam requirements for the construction of a gas boiler requirements, gas steam boiler installation for the construction of the boiler room have certain requirements, must comply with national requirements in the construction process. Gas and steam 1, the construction of a gas steam boiler room requirements 1) boiler room must comply with the "boiler energy saving technical supervision and management regulations" and "industrial boiler room design specifications" requirement. Gas steam 2) boiler room should have sufficient light and good ventilation, have the necessary antifreeze measures. And boiler room should stay away from schools, housing and densely populated areas. 3) the position should be close to the boiler room heating equipment, in order to reduce head losses and heat loss from the hot oil piping circulating pump. 2, furnace heat carrier device is arranged in claim 1) the sump should be lower than the lowest position of the heat carrier furnace and heat system 1 m, in order to put the net organic heat boilers and systems, sump and furnace heat carrier spacing less than 5 m or separated by a partition wall. It should be fitted with a sump exhaust pipe, which exhaust pipe diameter should be large and specifications than the inflation tube. 2) position of the expansion tank should be higher than the other devices and the piping system, the system must be higher than the maximum bottom level 1.5 m. It should not be installed directly above any one boiler, organic heat carrier to prevent overflow cause a fire. 3) the sump vent pipe, expansion tank, should be connected to the outdoor safety. Can not be mounted on the vent pipe to the valve, to ensure that the tank, the expansion tank to atmosphere to ensure atmospheric pressure operation. 4) the high volume of the expansion tank should be greater than 1.3 times and all the organic heat carrier furnace heat the entire heating systems is at the operating temperature is increased due to thermal expansion of volume. 5) low volume tank furnace heat carrier to be less than 1.2 times the total amount of organic heat. 6) hot oil circulation pump should be at least four weeks for 0.5 m space, and the inspection to ensure the installation routine, the need for maintenance.

Gas central heating boiler for chemical industrys are ideal alternatives to coal-fired boilers. Although the thermal efficiency of oil-fired boilers is relatively high, the pollution of exhaust fumes to the atmosphere is much greater than that of gas-fired boilers, and there are also problems related to oil transportation and storage in oil-fired boilers, which make them lose the advantages of long-term development. Compared with coal-fired boilers, gas-fired boilers have obvious advantages:

In Harbin fifth session of the Fourth Session of the National People's Congress, coal-fired central heating boiler for chemical industrys governance as a key task to be mentioned again. Meeting specific targets: by 2019, Harbin will govern coal-fired boilers, boiler out of 35 tons and below do not have to upgrade conditions, starting 65 tons or more of coal-fired boilers and energy-saving ultra-low emissions transformation.

2019, Harbin will continue to strictly control the total amount and quality of coal, according to local conditions to solve the shanty towns, suburban town (township) village coal powder burning problem by briquetting, Burying to field, the way raw material cogeneration, effective path to explore the comprehensive utilization of straw, the straw open-air Jinshao continue to focus on the work to implement the required emission limits industrial emissions, car exhaust strengthen, kitchen fumes, dust and other site management, effectively improve air quality.

2018, Harbin City, air pollution, elimination of coal-fired boilers 1191 units, biomass boilers to replace more than 10,000 units, updated bi-fuel taxi 1270 units, 1323 units of new energy buses, comprehensive utilization of straw and prohibiting open-air work strength forward, ambient air quality fine days up to 312 days, an increase of 42 days over the previous year, the highest level since the ultra-high PM2.5 monitoring.