blast furnace gas burning boiler for sale

The beverage plant needs steam in its beverage degassing ,sterilization, and packaging process. 3 ton steam requirement per hour came from beverage plant steam requirements in all process. Then, why there must be WNS series, any other choice here? WNS series steam capacity is from 2 ton to 10 ton, more suitable for lower capacity steam blast furnace burning boiler for sale. Of course, we also have SZS series which capacity is from 4 ton to 30 ton. To larger steam requirements, industrial gas oil fired power plant boiler is also available. If you want to use other gas fuels like lpg gas, bio-gas or liquid fuels like diesel oil, heavy oil, light oil, our WNS series steam boiler also can burn them. But, like our advanced engineer said before, each boiler is specialized for one designated fuel, this WNS series 3 ton steam boiler is manufactured to burn natural gas. Although it can burn other fuels, it can reach highest thermal efficiency when burning designated fuel natural gas.

? First: to improve fuel will be coal into gas in principle, more in line with the standard requirements of the relevant countries, fueled by coal blast furnace burning boiler for sale has been subject to strict national authorities to stop, that there is often a boiler in the enterprise will fired boiler into gas boiler rehabilitation programs embodiments, may use natural gas or alcohol as a fuel after passing through this transformation, the raw coal to reduce all kinds of pollution caused by the fuel, thus using not only environmentally friendly but also improvement in the fuel cost. Second: the furnace to improve coal-fired boiler furnace into a gas furnace is the use of coal-fired auxiliary boiler for heating the furnace, and then to improve the use of gas for heating, if not exactly when or poor fuel atomization in the combustion gas gathering hearth or tail, it is very prone to catch fire or explode, so then you need to hearth to improve device blast doors, while adding automation and control ignition and flame failure protection devices to ensure safe operation of the furnace process. Third: When ancillary equipment prior to improvement has not improved during the coal-fired furnace operation requires a lot of ancillary equipment to carry out normal operations, ancillary equipment commonly used in general including the coal, Cleaner, dust collector and grate, etc. followed by boiler using these accessory devices do not need to use a gas stove, so you can save and invest more of boiler equipment. Fourth: to improve the degree of environmental protection we all know has been a coal-fired furnace is not allowed by the national environmental policy, coal is a serious source of pollution not only pollutes the environment but also cause a variety of effects on the body, adopted after performing boiler gas furnace and greatly reduce emissions of soot and various dust can effectively improve air quality, more environmentally better protect the cleanliness of the air, but also more in line with national standards of environment protection and energy policy.

Chinese wine culture has a long history, wine blend. In the process of making wine, almost all wine prices are inseparable from the brewing process steam, we can say the stability and quality of steam purity of the wine production plays a decisive role. Lefort Wine has been committed to producing high-quality wine products, December 2016 No. 1, Lefort wine and I signed a one 4 tons of steam condensing steam blast furnace burning boiler for sales, the company continues to provide high-quality wine work steam.

How to maintain the blast furnace burning boiler for sale shutdown? After boiler shutdown cooling, heating surface must be thoroughly cleaned of fouling and ash grate the upper, the lower portion of the furnace. Then to maintain a certain degree of natural ventilation flue. In general, in order desiccant moisture should be placed in the furnace, flue. The quicklime as a drying agent, within the furnace or flue gas per cubic meter should be placed generally about 3kg. After placing all the ventilation should be tightly closed doors. After the change of lime powder to be replaced. Low-lying position as boiler room, ground during shutdown severe flood tide, often approach should be used and placed a small fire to dry desiccant combination. How to care? If the boiler shutdown a long time, the boiler shutdown after complete removal of soot coated with an anti-corrosion red lead paint in oil or other metal surface furnace. As internal corrosion Maintenance shutdown of the boiler body, under normal circumstances, can be used wet shutdown maintenance is not more than one month, one month electrically operated steam boiler should be taken to dry more maintenance. To note the following problems when a dry maintenance: desiccant boiler not in direct contact with the metal surface, may be mounted in a container such as the iron plate after the desiccant is placed, and a hole for shutting the other hand hole cover.