130t h gas steam boiler shipped to argentina

Small series to introduce horizontal 130t h steam boiler shipped to argentina steam boiler arch horizontal tube plate with threaded pipe drum composition, high heat transfer efficiency, boost fast enough output, high overload capability, hard fouling smoke tube. Today, let us together look at it. Horizontal welding binding sites steam boiler using high-temperature region and large machining bundle special treatment to ensure the welding quality and service life. Flammable, widely used fuel, burn bituminous coal, anthracite coal, firewood, industrial waste, organic waste and so on. It solves the problem of tube plate crack, eliminating the dead zone at the bottom of the drum, good water cycle effect, prevent the lower drum drum kits. Horizontal steam boiler compact structure, small dimensions and saves capital investment, easy installation, tipping valves, and piping to run hydropower. Stable, easy adjustment, the unique design of air sealing, bank up a fire a long time. Times atmospheric pollutants are oxides of dust, sulfur and nitrogen contained in horizontal steam boiler flue gas, which can achieve emissions targets Protection index when a predetermined number of times to unpurified. These substances emissions control combustion pretreatment, improved combustion techniques, dust removal, desulfurization and denitration. By means of a high chimney stack can reduce the concentration of pollutants in the atmosphere of the area.

With such a 130t h steam boiler shipped to argentina now been applied, so now this boiler equipment, can be said to be able to get among the many enterprise application, so now select the boiler equipment, it becomes a very important thing. In such a device for selected time, taking into account the efficiency of the performance of equipment, facilities, and there is now power energy equipment, because now the boiler equipment, began to appear in coal, natural gas and electricity and other energy sources, it is also It enables businesses can now go to select.

10th June this year, the provincial government agrees that the ecological environment in Zhejiang Province Office issued the "Notice on the implementation of special emission limits national emission standards of air pollutants" (hereinafter referred to as "notice"), marking the full implementation of Zhejiang Province especially national emission limits of air pollutants.

"Special emission limits" is mainly for land development density is already high, the environment carrying capacity began to weaken, or less atmospheric environmental capacity, ecological environment is fragile, more stringent prone to serious air pollution problems in sensitive areas and set the emission limits. Implementation of the national emission standards for special emission limits, Zhejiang Province in favor of further strict pollution management, reduce pollutant emissions, to further improve air quality, but also help promote the integration of the Yangtze River Delta environmental standards.

In fact, back in 2013, Zhejiang has already begun in some areas particularly the implementation of the national emission standards limit emissions of air pollutants, but was limited to Hangzhou, Ningbo, Huzhou, Jiaxing and Shaoxing, Hangzhou Bay five cities; and this is to expand to the province level. In addition to a wider geographical range, "advertisement" clearer pollutant emissions targets, e.g., volatile organic contaminants not individual indicators, including not only non-methane hydrocarbons, total volatile organic compounds such as benzene, benzene and other pollutants indicators meet the definition of volatile organic compounds should be performed; also more involved in the industry, such as boilers only provides original coal-fired boiler, and "notice" it covers all types of boilers (including oil, gas).

It is reported that, in the national emission standards have been implemented, a total of 25 standards set emission limits of air pollutants in particular; at the same time, the recent ecological Ministry of Environment and the State Administration of market regulation has released three national emission standards of air pollutants, namely, pharmaceuticals, paints, inks and adhesives and volatile organic compounds fugitive emission control standards, and will be from July 1, 2019 implementation. According to "notice" requirement, the province is also involved in the enterprise should implement special emission limits specified in the three standards, the execution time of the emission standards time synchronization. Provincial Department of Atmospheric environment Department official said: "The implementation of the national emission standards for emission limits in particular, help to further strict management of our province pollution, reduce pollutant emissions, to further improve air quality, but also help promote environmental protection in Yangtze River Delta standard integration. "

Gas boiler precautions required during installation methods, or steps :( a) a foundation base of the boiler should be provided is determined according to the local soil, manufacturers design reference by the civil sector again. After reaching the base strength boiler, the boiler should drawings inspection and acceptance, and to draw the whole boiler three reference lines: a, longitudinal reference line - drum center or the center of the combustion apparatus. b, lateral reference line - the center of the front axle or chain grate slag centerline of the machine. C, elevation reference line - can be selected from a number of locations about four weeks, respectively, on the basis of the marking, the relative offset between the markers should not exceed 1mm. Furnace in place. After assembly the lower part of the boiler in place first, then the upper assembly large, the upper and lower portions need to find a combination of two positive pads firmly, should be both inside and outside the two casting. Installation location and size deviation test methods according to GB50273 "boiler installation engineering construction and acceptance" implementation. (B) lifting the boiler, during lifting, should be suspended on a lifting lug drum boiler ready large, the boiler on a foundation base coincides with the pre-drawn reference line. The longitudinal centerline of the boiler and the foundation, the deviation is not more than 3 mm, and the inclination with the center line of the drum hammer correction, allowing the central drum inclination is not larger than 5 mm, otherwise use horns foundation base and the junction pad level. Maximum level (c) Installation of boiler network (1), water supply conduit installation requirements typically require as backup pool below the normal water level line of the boiler, so as not to shutdown, boiler feedwater flowing into a large number of drainage caused to start the next . At the outlet of the tank (i.e., an inlet feed line) should be installed wire screen. (2), a main steam line installation requires the main steam lead pipe straight run section should be more than 0.5 m, the bending radius should be 4-5 times the diameter of the pipe, the trap should be fitted at the lowest line in order to prevent water hammer pipe, while to be reliable insulation. (3), the safety valve should be installed in the valve installation requirements after the hydrostatic test, the safety valve shall be fitted exhaust pipe, the exhaust pipe of the safety guide outside the boiler house, allowed valving the exhaust pipe. (4), mounting a lower water table level table downcomer must access a safe place, Hancock rotating flexible water table, not leaking, water table must be installed to the lighting device, easy to observe. (5), a pressure gauge mounting means so that when the scale gauge vertical plates, should be painted red gauge scale to show the maximum allowable pressure boiler, rotating flexible plug gauge, not leaking, water flow, pressure gauges insulation prohibited. (Iv) the boiler chimney installation requirements, when lifting the chimney, the chimney should be straight, horizontal direction lead length should not be too long, generally less than 5 meters, the height of the chimney should comply with relevant national standards. To add chimney rain cap, the weight of the chimney should not fall directly on the boiler chimney take over the host. Installation (e) combustion system: 1, according to the combustion system of FIG power line control circuit, a control signal line and the control line is electrically connected, the program should be installed reliable ignition and flame failure protection devices. Combustion process controller provides a separate set of contact start-stop control. May be formulated in a variety of burner start-stop loop cascade control relay 10A is a fuse, relay start-stop control stops the control terminal may be connected to the burner, may directly control the power of the burner. Both constant pressure sensor, water power, fuel, gas pressure set value is detected after the automatic controller opens. Time pressure sensor, water supply, oil, gas, and their detection circuit, alarm and found the problem immediately shutdown flame protection, the controller automatically displays the point of failure, an alarm sounds machine.