electricity gas steam normal pressure boiler for sale

What if there is wear and tear in the natural gas electricity gas steam normal pressure boiler for sale? Detailed inspection is the key, as is fuel management. According to the operation condition and time of natural gas boiler, we can plan reasonable wear inspection. When using fuel, we strictly control the granularity of coal and limestone. The size of bed material should be strictly controlled. Boiler waste should be disposed of. The waste residue of the boiler must be treated before it can be discharged. Natural gas boilers should be installed where heat is used, easy to install. The hot pipe should not be too long. It should have a good insulation. The pipe shall be tilted properly from the hot water outlet to the end. The water supply source shall be equipped with a control valve. To discharge exhaust gases, the chimney of the natural gas boiler should extend to the outside and the outlet should be 1.5 to 2M higher than that of the boiler. If we want to reduce the influence on the water wall tube, we can adjust the air pressure and air volume properly, and effectively reduce the wear of the water wall. Check time is usually standby or downtime. Items to be examined include wall wear, furnace sealing and smoke leakage. In case of wear and tear, repair and welding are required to ensure the normal operation of steam boiler. Generally speaking, before combustion of natural gas boilers, fossil fuels, fossil fuels and bed and circulating materials should be filled in the combustion chamber at wind speed and strength. And stiffness of the air convection under full integration. Furnace bottom air device, inner core area upward. The movement in the outer ring region flows downwards along the water wall of the furnace, thus prolonging the residence time of the coal particles in the furnace. Mineral particles, a large number of ash powder and smoke contain a large number of fly ash particles, these continue to lead to rapid wear of water-cooled wall tube, make wall thickness wear thin, resulting in wear.

Classification accuracy of gas steam electricity gas steam normal pressure boiler for sale and hydraulic machines with precision introduce gas steam boiler and hydraulic classification of a gas steam boiler By Type 1, an industrial gas steam boiler: heating and for industrial production and so on. Most of the parameters for the low, low capacity boilers, the fire bed combustion and thermal efficiency is relatively low. 2, power station boilers: mainly for power generation. Most high-parameter, large-capacity boiler, firebox and allow more efficient combustion. 3, the ship's boiler: a marine power. Such boilers generally low parameters, fuel oil, the requirements of small size, light weight, easy to move more. 4, locomotive boiler: The main use of locomotive power. Lower overall parameters are small capacity boilers, fire bed combustion, requires compact, movable. Two gas steam boiler in accordance with the kind of the working fluid and an output state classification can be divided into: 1, the steam boiler: the working fluid is steam outlet. 2, hot water boiler: hot water as the working fluid outlet. 3, special working fluid boiler: export of special working fluids, such as certain organic matter. Three outlet gas steam boiler in accordance with the pressure of the working medium can be divided into: 1, pressure boiler: the outlet steam pressure 14MPA (140kgf / cm). 2, high-pressure boiler: the outlet steam pressure 10MPA (100kgf / cm). 3, sub-pressure boiler: the working fluid outlet pressure of 2.5MPa. 4, pressure in the boiler: the outlet steam pressure of 3.9MPa (39kgf / cm). 5, supercritical pressure boiler: outlet steam pressure is about 25MPa (about 250kgf / cm). 6, subcritical pressure boiler: outlet steam pressure of 17MPa (170kgf / cm?). 7, low-pressure boiler: the outlet refrigerant pressure (gauge pressure) is less than or equal to 1.3MPa (13kgf / cm). Accuracy of the hydraulic machine, determines the precision of the parts. However, only static accuracy to measure the level of accuracy of press is not very accurate. This is because the size of the mechanical strength of the press itself has a great influence on the punching accuracy. If the strength of the press itself is low, the machine will be modified such that the pressure at the instant of Ao punching pressure is reached, so that, when the above-described conditions in a static tune even good, also since the strength of the deformation caused by the sample bed, differences occur. This indicates that the accuracy of the press and has a lot of strength, and the magnitude of the intensity of the work has a great influence on the press, so that high-precision parts and punched continuous strong cold stamping, the accuracy must be selected high, and the rigidity of the press.

Industrial gas steam electricity gas steam normal pressure boiler for sale room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger. Industrial gas boilers small volume itself, and these need not be equipped with auxiliary equipment, simply set up between a host and auxiliary room, set on more messy, covering economy. Industrial gas boiler city gas source is generally taken from the intermediate pressure gas supply line, the gas pipeline laying gas sampling point to the boiler room, then according to quell's brand, type and caliber regulating device applications, scheduling outlet pressure range, by metering the put into use. Establish a set fee just gas network tariffs, pipeline fees, hot walks pipeline fee. Gas pipeline network overall cost of capital is the sum of the gas company funds charged to the user, it can be determined depending on the circumstances around the gas company. Usually adopted buried gas pipeline type, buried depth is generally about 0.8m ~ 1.0m, seamless steel pipe can be selected or PE pipes, pipe surrounding sand 15cm ~ 20cm plating, hot water pipe laying relatively simple, somewhat messy steam pipe walks . 3, industrial gas boiler room planning results in the presence of 3.1. Selection of the size of the heat load of the boiler and its expansion tend to choose the boiler capacity, the number of great links. The larger heat load, single boiler capacity should be large. The near future can be greatly increased thermal load, it is also relatively large capacity boiler can choose, it will expand the load thought. The only thought to increase the long-term thermal load, the expansion device may leave the boiler placeholder deployment end in the boiler room, or space left on the total FIG. However, in the practice of project planning, often there is a lack of expansion heat load estimates, constitute improper boiler selection, pre-operation to cause unnecessary trouble. 3.2. Gas boiler gas regulator trivial results generally used in high-pressure (less than 5kPa) and medium voltage (5 ~ 150kPa) trivial. Gas usually before entering the boiler room will arrive this requirement. Now the gas hot water boiler is equipped with a high level of automation subsided, a calm requires the gas pressure is lower, so before further demand into a calm pace pressure boiler manufacturers themselves generally equipped. Gas pressure regulating trivial demands reliable equipment, but on the size of the gas pipeline valve is open due to the gas pressure when scheduling the gas pressure is high or low, and tempering will cause off, start and stop frequently subsided's configuration, thereby affecting the boiler work. 3.3. Gas boiler quality results planning standard gauge, the quality can not be ensured when the gas, should be provided or dust, oil and water, respectively, and a total closed drain valve before the gas main pipe before the regulator device. Most of the oil production plant in the use of oil with anger, it is often said of moisture in the summer cold weather, moisture and light hydrocarbons and other substances containing moisture, condensation will constitute a line blockage, an initiative to quell the flame, impact Heating. 3.4. Chimney condensate results because of the high thermal efficiency of industrial gas boiler, a low exhaust gas temperature, typically 180 degrees, the boiler room planning criteria (GB50041-2008) rules industrial gas boiler room chimney should be reinforced concrete or steel chimneys chimney. Chimney will appear directly in the outdoor summer steel chimney condensate freezing results, constitute icing light rusty steel chimney, would constitute a temporary corrosion, freezing severe affect chimney smoke. 3.5. The amount of air to quell the outcome's when quell Industrial gas boiler is in the boiler room, the air between the boiler must be satisfied the requirements apply to quell the device, otherwise there will be no abundant natural gas to quell working carbon monoxide poisoning.

Beiqi Panther car 6 tons of steam condensing one fuel gas steam electricity gas steam normal pressure boiler for sale project has been successfully completed. This series boiler adopt advanced design concepts, using the waste heat of flue gas cascade, with the use of the condenser and the economizer fully absorb the waste heat in the flue gas, the boiler efficiency has been greatly improved.