Agent 6t Natural Gas steam boiler Industrial Brunei

The partnership, fast boiler for the user responsible attitude to have left a deep impression on our fireman boiler operation is not very skilled, fast deliberately sent a party of professional and technical personnel for our on-site supervision of installation, commissioning and training to ensure that the latter can operate our good boiler fireman. --customer feedback

Gas boiler szs 1 emergency shutdown procedures, if necessary emergency shutdown generally, when the boiler encounters one of the following, operation should be stopped in case of emergency; (1) allow the boiler steam pressure exceeds a safe pressure, fueling is stopped strengthen water supply, measures the wind pressure continues to rise. (2) boiler severe water shortages. Water meter can not see the water level. After being called water, the water level of sight. (3) When the severe water boilers, boiler water level is higher than the highest water level is visible, but the emission level not yet seen. (4) increase in boiler water, take other measures, the water level will continue to decline. (5) water supply device is turned off, standby equipment. (6) all water level gauge or invalid. (7) All the safety valve all the failures. (8) All all-off failure drain valve. (9) causing damage to the boiler pressure element (e.g., boiler tubes, etc.), or endanger the safety of the device. (10) boiler is a serious threat to other events and safety equipment. 2, natural gas boiler operation method szs immediate emergency stop operation of the controller, the boiler is off, closing the front of the boiler gas valve to stop the gas supply. The agent 6t steam boiler industrial brunei competent completely separated, opening the exhaust air valve or safety valve steam pressure. Due to lack of water, the boiler is not allowed into the boiler, the steam is not discharged to reduce pressure. No shortage of water, cold water can drain down alternate method, the water level remains complete accident should immediately stop the water supply, water reducing combustion (fire artificially changed into a small fire), play an open valve while opening the main steam pipe and the drain valve cylinder to prevent the steam to carry large amounts of water, water. In the shutdown process, the cooling rate of the furnace should not be too fast to avoid flue compression member and the expander is damaged suddenly cooled. 3, emergency shutdown processing method szs natural gas boiler in the case of emergency shutdown, due to the nature of the accident, the following may take a different approach: (1) rapid flame treatment emergency shutdown, the burner first station, and closing the valve flame gas supply is stopped after the cut valve, to maintain the water level is normal. (2) rapidly cooling the furnace or water if there is no water leakage during an emergency stop, the cooling time can be shortened to the boiler water and sanitation and reduce the pressure. When the boiler water temperature down to 80 degrees Celsius, boiler water can be discharged. If the boiler severe water shortages, the boiler can not cool quickly in the event of an outage. Non-water to the furnace, or explode. accident. (B) natural gas boiler shutdown SZS normal shutdown (complete shutdown, shutdown maintenance) procedures which can be used when needed repair or stop steam boiler. 1. If one of these faults, the leaders agreed, the boiler can be temporarily closed repair: bilge faucets, riveted joints leak, damaged tubes, the waterwall tubes, the heating tube, the flue gas contacts the drum, the head, off pipe insulation, water supply system, combustion system, a serious fail-safe accessories, in need of repair. 2, a temporary repair (or normal shutdown) the method of operation in order to stop the burner, for closing the valve. Boiler feed water to 2cm above the normal water level, to stop water supply, reduce the pressure. 3. Turn the main steam valve, open the traps, and steam boiler operation, reliable water separator. 4, boiler feed water close electric valve and manual valve, boiler feedwater reliable cutting. When the steam pressure drops to zero, the water can be supplied and discharged alternately, so that water is gradually cooled furnace, when the temperature drops to 50 degrees Celsius (or hand potshell touch feeling hot pan head), can be completely discharging furnace boiler water water . Before water, open the air valve on the boiler or lift safety valve. At this point, you can enter the furnace for inspection and repair. Cooling the furnace must be kept slow, non-violent cooling and damage to the boiler, the boiler can be stopped from the repair into the furnace, the cooling time is generally less than 24 hours. Close the furnace over 24 hours, shut off the gas supply valve at the regulator, and open the gas conduit pipe is responsible, in the exhaust gas pipeline.

Small gas agent 6t steam boiler industrial brunei best suited to the laundry room with the rapid economic development, also in the laundry industry in various regions of the world to do fast, like LDK, UCC have made the international brand. Expand the size of the laundry industry, can not be separated steam boiler, steam boiler small gas today small to say it is more suitable for laundry. Generally, 0.5 tons of steam produced by the boiler steam biomass per hour 500kg, drying clothes can be used between 300 standard. 1 ton of steam produced by the boiler steam biomass per hour 1000kg, 700 can be used for drying clothing standard room. 2 tons of steam produced by the boiler steam biomass per hour 2000kg, can be used for drying clothing between 1500 standard. So basically very large laundry room with a small steam boiler to meet. WNS type of fuel gas-fired boiler (Horizontal internal combustion chamber fuel gas-fired boiler) is specifically for this mini-laundry and students, it is the development of technical cooperation with the German boiler products, both to fuel gas can, the technical indicators reached the world advanced level, the implementation of sub-projects of the World Bank is one of GEF boiler efficient and environmentally friendly projects. The more types of boiler combustion machine to join an internationally renowned, really do clean burning, emissions of pollution-free, easy operation, ample output. As for the price of small gas boiler, in this small series is no way for you to determine the offer, which requires a combination of boilers and auxiliary equipment specifications laundry at home who they need and so on. If you need detailed quote and boiler configuration program can contact and small series, small series will be combined with your situation to give you the most appropriate answer. We just want to know there is a boiler operating costs, including fuel costs, maintenance costs, electricity, labor fees. And most of the operating costs are fuel costs, small gas boiler and gas consumption is 78m3 / h / t. The total operating costs also need to combine their laundry home to their own circumstances budget.

10 tons of horizontal gas hot water boiler safety features Henan party nearly 10 tons of gas hot water boiler can be divided according to the type of gas hot water boiler WNS and SZS gas hot water boiler, meaning both what is it? WNS means is a horizontal-type combustion chamber burner, meaning that double drum SZS vertical type burning furnace chamber, although the two different processes of different structures, but the fuel and the safety device are the same. This chapter focuses to introduce safety protection system of the two kinds of boiler: 1, interlock protection system ① As the two kinds of dual-use oil and gas boilers are in this together computing, once the fuel or air pressure below the minimum set when the standard, it will automatically cut off the fuel supply ② cold water delivery device event of a failure, will automatically cut off the fuel supply ③ water temperature is higher than the highest temperature setting, will automatically cut off the fuel supply 2, the most dangerous place is the ignition system boiler system , because many of these conditions could not be controlled once the ignition, so the first firing of the furnace should be purged to avoid residual combustible gas combustion furnace, after the purge, ignite pilot fuel (oil or gas) flame monitor reflects the flame existence, and it continues to burn about 10s. After 10s, the main fuel valve (oil or gas) driven i.e., ignite the main burner. If the normal main burner combustion, the ignition system is automatically shut down. 3, turn off the boiler system we know if it is to continue to provide fuel to the furnace in the flame will cause serious consequences of an explosion, this one so fast Henan party made a special detection device, or burn when the ignition fails halfway flameout, general in the 5S (ignition) or the 10s (runtime) off oil, gas solenoid valve, with sound and light alarm signal. 4, via the feedwater system to a steam cycle water injection drum seat, gall direct flame furnace, the flame furnace heat absorption, the heat absorption of smoke tube furnace high temperature flue gas discharged water, boiler water becomes progressively heated steam, by after separation water separation means leads from the main steam valve. Henan party fast as a professional gas boiler manufacturer, has 70 years of design and manufacturing experience, customers throughout the country, the most recent of several large cooperative enterprises and 10 tons of gas hot water boiler, Zhengzhou University, Zhengzhou Yutong Bus with 10 tons of gas hot water boiler, Gongyi aluminum plant with 10 tons of gas agent 6t steam boiler industrial brunei, your trust is fast Henan party's power in the service of idealism Henan party fast, quality-oriented principle never live up to your commitment to your trust!