bituminous coal fired hot oil boiler price

Jinzhou construction and installation company needs an electric heating hot water bituminous coal fired hot boiler price house construction, after screening and comparison of various brand boiler industry, our excellent results in the cleaning of the boiler industry has been attracted to each other, in mid-2016, the Jinzhou construction and installation the company I signed with an electric heating pressure hot water boiler.

Buying a set of natural gas fired steam bituminous coal fired hot boiler price for beverages plant, 3 ton steam capacity, 5,000$ is enough. In our ZG Boiler, all gas oil fired steam boiler thermal efficiency can reach to 92%, higher than those solid fuel boilers. With rich experience on consumer reception, most beverages plants prefer gas oil fired steam boiler. Now, considering with fuel costs and steam requirements, our client is pleasure to order a set of WNS series 3 ton natural gas fired steam boiler for beverages plant. 1 ton steam boiler consume nearly 74m³gas fuel per hour. Thus, 250m³natural gas fuel can ensure this 3 ton steam boiler work in one hour.

Gas oil fired bituminous coal fired hot boiler price for power plant

Why convert gas oil base power station to coal fired power plant?

A rated working pressure of the bituminous coal fired hot boiler price steam pressure in the boiler should be greater than the sum of the plate for the steam production required for the pipeline resistance and operating pressure. Do not neglect the steam pipe resistance, because the higher rated steam pressure, saturated steam temperatures will also increase. Second, the boiler heating surface heating surface (heat transfer area) is an important boiler (design) parameters. Because of the large output of Boilers generally large overload capability; otherwise, output is small. Same boiler capacity, a relatively large heating area, a lower exhaust gas temperature, the higher the efficiency of the boiler, fuel combustion heat is more fully utilized, consumes less. Third, boiler blowdown boiler blowdown is clean the inside, remove the sludge, reducing the effective measures of scale. Fourth, the construction furnace boiler furnace tube diameter is also one of the very important (design) parameters. After a lot of boiler running for some time in the furnace coke, smoke pipe soot accumulated soot, black smoke even began, will be a waste of fuel. The main reason is the diameter of the furnace small, atomized oil particles had a chance to be injected into the combustion furnace wall caused by high temperature carbonization. Thus, when selecting a gas boiler furnace to select a larger diameter.