20t For Sale boiler Cyprus

Working principle and characteristics of the premix 20t for sale boiler cyprus a combined module, the working principle: the premix boiler module, based on user needs and design load size, the number of modular units can operate independently of the integral boiler, through the outer chamber temperature, and monitoring the supply and return water temperature change computing, computer-controlled system may control each of a module, the module automatically adjusts the number of start and stop, so that the heat output always matches the actual heat load demand, and to ensure that each module can be kept in optimal combustion conditions, so as to achieve overall efficient operation of the boiler. Second, the main features: 1, saving fuel. Most ordinary boiler when there is a low load operation, the actual thermal efficiency is much lower than the thermal efficiency of the design defects, when the load fluctuations, will cause energy waste. Premix combustion boiler module due to its simple behavior control, with adjusting the load change fast, flexible, thermal efficiency can be always maintained at 95% (90%), thereby achieving energy efficient operation. 2, stable, easy to operate. Because of the unique premix module boiler operation mode, easy to automate the process of running the operation. Automatic control system of the boiler installation, full automation can be achieved during operation according to the set parameters, the operator is reduced. 3, transportation, easy installation, small footprint. Since the dismantling of the boiler can be like building blocks in combination, therefore, greatly facilitates transport and installation, reducing the footprint, and without foundation boilers, require a lower storey of the boiler room. 4, easy to maintain. Due to the simple structure of the boiler itself, no drums, and other ancillary equipment fan, so running failure rate; and achieve low noise operation. 5, each module backup each other without backup boiler, if the malfunction in the heating of individual modules, has little effect on the entire system.

Electric steam 20t for sale boiler cyprus features: 1, electric steam boiler automatic intelligent control technology, no need to be on duty. The operation mode is flexible and can be set to manual or automatic mode. 2. The electric steam boiler can set the automatic operation time period of the boiler according to the need, and several different working periods can be set up in one day, so that the boiler can automatically start each heating group in time-sharing. The heating group turns on and off circulation to make each contactor use time and frequency the same, and improve the service life of the equipment. 3, the electric steam boiler controller automatically controls, calculates and tracks the pressure, and it can be used to control the feed water pump when the load changes. Automatic start-up and stop control of electric heating tube, or manual control. 4, electric steam cooker The furnace has a full range of protection functions, leakage protection, water shortage protection, grounding protection, steam over-pressure protection, over-current protection, power protection, etc., boiler automatic protection, safe home. 5, Electric steam boiler body uses boiler pressure vessel steel plate, furnace body longitudinal welding seam is automatic welding, and carries on X-ray inspection, small boiler furnace body, mechatronics, easy to install and match; Large-scale boiler furnace body and electronic control separation design, to prevent the electrical control part affected by the furnace body high temperature, to ensure the stable operation of the electronic control device. 6, the steam boiler used in accordance with the JB/2379-93 and < metal tube-like electrical heating element technology. Conditions > requirements for low surface heating load electrothermal elements. High quality electric heating wire jacket thickened stainless steel pipe, filled with high purity magnesium dioxide powder, long service life of electric heating tube. Each group of electric heating components adopts flanged connection, which has the characteristics of simple structure, high mechanical strength, safety and reliability, convenient replacement and so on. 7. The electric steam boiler is compact in structure, scientific and reasonable in design and advanced manufacturing technology, which makes the boiler take up less space. Convenient transportation and saving site. 8, electric steam boiler is noise-free, pollution-free, high thermal efficiency, boiler body uses high-quality and high-efficiency insulation material as insulation, heat dissipation is small, energy saving and consumption reduction. 9, outside the electric steam boiler Packaging using famous color board package design, beautiful appearance, not easy to rust.

double 20t for sale boiler cyprus means that the boiler flue gas flows from the front of the furnace to the furnace, and then returns from the heated pipe at the upper rear part of the furnace to the heating surface in front of the furnace until the flue gas is introduced into the flue.

General Secretary Xi Jinping fully implement the important instructions on promoting clean northern winter heating, Xi Jinping adhere to the new era of socialist thought and nineteenth spirit of the party with Chinese characteristics as a guide, actively and steadily make 2018--2019 Nian northern clean heating season Heating work to ensure the safety of the masses warm winter, the energy Bureau of Beijing, Tianjin, Hebei, Shanxi, Inner Mongolia, Liaoning, Jilin, Heilongjiang, Shandong, Shaanxi, Gansu, Ningxia, Xinjiang, Qinghai, Henan province (autonomous regions and municipalities) and Xinjiang production construction Corps development and reform Commission (energy Board), Beijing Municipal Administration Commission, nuclear, China Guangdong nuclear power, China petroleum, China petrochemical, China national Offshore oil, national grid, Inner Mongolia electric power, China Huaneng, China Datang, China Huadian, the national energy State power investment Corporation, China Three Gorges, SDIC, China Resources coal, China electric power construction, China can build Group (company), power planning and Design, Water Resources and Hydropower planning and Design and other regions and major companies asked the following notification.

First, a solid grasp of clean heating embodiment implemented. At present, the country has been in accordance with the "Clean northern winter heating plan (2017-2021 years)" (hereinafter referred to as "Plan") requires the preparation of a clean heating embodiment of their respective regions, to develop a clean heating annual work plans.

Second, and steadily push forward the "coal to gas," "coal to electricity." Should adhere to the electric power, the gas should be air, should the coal is coal, the heat should be hot, for a given change, after the first stand break. "Coal to gas," gas will be to change, to implement gas supply further implementation of the transformation. All localities should earnestly fulfill the main responsibility to protect people's livelihood gas, good supply in the region decomposition of the implementation, coordination arrangements, rational use.

Third, actively expand the scale of renewable energy heating. All localities should combine resources, to improve geothermal resources exploration and development efforts under the premise of no damage to the ecological environment, simplifying formalities projects, improve the supporting policies, increased geothermal heating area.

Fourth, push forward clean coal-fired central heating. Coal should adhere to the coal, clean coal-fired central heating expanding area. By localities should give priority to production, as emergency reserves peaking power, improve the heating capacity of the unit, expand heating radius, planning and construction of people's livelihood back-pressure thermal power generating units, etc., to further encourage ultra-low emission cogeneration clean heating. Combined with coal production capacity to deploy a unified, rational part of the release of advanced coal production capacity, protect the livelihood of coal for heating. Greatly enhance the environmental performance of coal-fired boiler room, implementation of the "planning" on the ultra-low emission coal-fired boiler in City requirements.

Fifth, keep the masses warm winter safety bottom line. Around the implementation of clean energy supply in new heating facilities, safe and stable operation before, never allow removal of the original heating facilities. Better use of coal, electricity, natural gas and other energy sources for UNPROFOR, users still need to use coal for heating, a really good job of clean coal supply security work.

Sixth, to explore innovative clean heating mode. To clean around heating combined with practical, innovative institutional mechanisms to optimize the business environment, further liberalization of energy, heat production and supply areas, and guide social capital into clean heating market, encourage enterprises to carry out technological innovation and management innovation, the development of new technologies, new models The new format.

Seven, strengthen supervision clean heating work. According to "planning" urged all localities to innovative regulatory measures and means to closely follow the progress of work, mastery goal of task completion and work to promote the practical difficulties, in conjunction with the Energy Bureau sent regulators to organize the supervision and inspection and appraisal. All localities must submit the plan to the Energy Board by December 15 to submit the report within two weeks after the end of the heating season.