Supplier 20 ton oil fired boiler Industrial Vietnam

Combustion Adjustment of dual-use oil and gas supplier 20 ton fired boiler industrial vietnams (Skills) boiler firing was successful, the load can be adjusted to normal operation. At this point, we should always observe the furnace combustion, if there is a bad oil and gas atomization, beating the flame, the flame hit the furnace and the exhaust gas temperature is too high or too low and so, it is timely for oil pressure, oil temperature, of steam, wind, air pressure, steam pressure hanging line adjustments to ensure safe and economic operation of the boiler. Size and load size of hydraulic, pneumatic boiler related to the oil pressure adjusted by adjusting the back pressure or fuel burner to achieve the size, by adjusting the air pressure to achieve the degree of opening of the valve. Adjust the amount of oil, air pressure adjustment load, at the same time, air volume control, must be synchronized to ensure a reasonable match of oil and the amount of wind, so as to achieve economic operation of the boiler. 1, the combustion method of determining boiler fuel gas: C02 content is determined from the flue gases and excess air ratio (1) the combustion quality (2) determines the length of the flame from the combustion quality (3) from the flame color and smoke color determination 2 is good or bad combustion, fuel combustion boiler adjustment method: the normal combustion, furnace flame stability was white orange, generally rumble, or if the flame beating abnormal sound, should adjust the fuel and air volume. If the adjusted still no improvement, it should identify the cause flameout, the measures to be taken and re-ignition.

To proceed from reality, should be in accordance with the electric power, gas should the gas, the coal should be coal, should be hot the thermal principle, promote the use of all kinds of clean energy for winter heating cleaning. In order to reduce air pollution and protect people's warm winter as a foothold to enterprises, government promotion, residents can withstand the principle of gas after the first change to gas will change in gas assurance, the price is acceptable on the basis of sound promote the "coal to gas" and central heating engineering, in district heating supply pipe network can not cover, vigorously implement the replacement of coal-fired power heating project.

Good job of marketing system storage capacity for natural gas. Accelerate the construction of natural gas transmission and distribution network, the new natural gas volume priority for life and severe winter areas of urban air pollution and coal for heating alternative. In principle, to new natural gas cogeneration and gas chemical projects.

Accelerate agricultural and pastoral areas "coal to electricity," the process of upgrading the power grid. Coordinate development of power transmission project construction, etc. are encouraged to promote the regenerative electric heating. Around on the "coal to electricity" project supporting grid should be given support, coordination "of coal to electricity," "coal to gas" land for construction.

In accordance with national requirements, shutting down environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance. For shutting down the unit's capacity, coal consumption and emissions targets, allowed to trade or replacement, can co-ordinate arrangements for building the capacity of ultra-low emission coal-fired units.

According to air quality improvement requirements to accelerate the delineation of high-pollution fuel combustion zone ban and to expand the scope of, and actively promote the elimination of small coal-fired boilers. The county level and above urban area basically eliminated 10 tons of steam per hour and coal-fired boilers and tea furnace, stove and other operating coal-fired facilities, in principle, to 35 tons of steam per hour, the new coal-fired boilers, in principle, other areas on no new 10 tons of steam per hour of coal-fired boilers. While banned out of coal-fired boilers, pressure boilers market regulators cancellation of registration certificate to use.

Fluidised beds have been used in the chemical industry. The first coal combustion applications, however, were not developed until many years later even though the fired patent on coal fired fluidised bed supplier 20 ton fired boiler industrial vietnam was applied two decades earlier. The energy crisis increased the interest of using coal as an alternative to oil and fluidised bed combustion offered a way to burn coal in environmentally more friendly way than conventional pulverised coal combustion. Later, fluidised beds have also been successfully applied to combustion of alternative fuels such as biomass and materials.

Industrial gas steam supplier 20 ton fired boiler industrial vietnam room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger.