Energy Saving boiler 6 ton Agent Bhutan

Response to national environmental policy in recent years, Changzhi City, various enterprises and institutions from themselves, have the energy saving boiler 6 ton agent bhutan environmental transformation and selection. However, due to various boiler plant manufacturers of products of varying quality, there is a variety of security risks in the operation; taking into account the level of professional fireman some units of non-compliance, the boiler operating procedures less skilled, the above reasons, Changzhi City Special inspection at this year's "safety month" held gas boiler safety planning activities of technical training courses, the city's use of gas-fired boiler units represent 233 enterprises and safety training. Fast boiler has a strong position in the field of clean-type gas boilers, and has a wealth of experience. Changzhi City, the special prosecutor of the special fast Boiler training for each unit represents.

Electric energy saving boiler 6 ton agent bhutan using electricity as energy, by electrothermal conversion, releasing heat from the heating boiler apparatus hot water having a waste discharge properties no no pollution, high degree of automation operation, no noise.

Through the trial operation, the installation quality of the energy saving boiler 6 ton agent bhutan, auxiliary machine, control system and other equipment can be checked; the inner surface of the pipeline is clean and there is no debris in the pipeline; the operating characteristics of the boiler and main auxiliary equipment are preliminarily understood; the boiler control system and protection system are inspected. Rationality and reliability; preliminary inspection of boiler and auxiliary equipment full-load operation capability; discovery of important defects in boilers and auxiliary machines, so as to take effective measures in a timely manner; also training relevant operators to understand and operate equipment performance The initial adjustments laid the foundation for pilot production and commercial operations.

The reason industrial energy saving boiler 6 ton agent bhutan explosion and the cause of industrial boiler explosion hazards and hazards? For chemical plant before use, it must be to raise awareness of prevention. So as to avoid unnecessary losses to yourself. During boiler operation, the pressure exceeds a predetermined pressure to certain parts of elements, the thin portion will suddenly break, crack out immediately stored in the pot will be full of steam. In an instant, a pressure drop equal to pot the external atmosphere. At this time, since the momentum intense, so that part of violent boiling pot filled with water, the expansion, a small part of the whole pot steam also will be warmed, a pressure rises again, further expansion gap. Because full of water and steam in the rapid expansion of one-tenth to twenty second, when gunpowder exploded just as the rapid expansion of the gas, they become a powerful shock wave, with great destructive power. When the boiler explosion, due to the bursting of steam and water has a very high speed, or when the front portion in contact with air, will have a huge reaction, or moves off the boiler in the direction of the reaction force, rolling. Vertical boiler mainly in the blast site and calf ring potshell welding, explosion, steam, the water jet, and then pushed up Boiler fly. Horizontal boiler explosion member burners or more in the weld of the tube plate and the drum, the drum in contact with the combustion. When the explosion occurred, steam and water splashing forward or backward or downward, parallel to the fly boiler, boiler and rolling at the scene. A boiler explosion released energy is only a small fraction of the steel sheet to tear the boiler, in addition to steam and debris and the pipes, valves and the valve body is connected to the boiler, the energy transfer most of the other great shock wave in air, causing a large number of peripherals, badly damaged buildings, as well as the formation of casualties.