6 ton boiler Commercial Factory Price Kuwait

Boiler blowdown Precautions introduction blowdown described below: (1) 6 ton boiler commercial factory price kuwait operation saturated steam, superheated steam, boiler water sample analysis by the chemical art, the boiler should notify personnel of the sewage chemists. (2) prior to the sewage regularly, the other tube boiler should contact connected to the same parent, by furnace. Boiler overhaul as a sewage pipe connected to the mother, to do the isolation measures to ensure that no waste water intrusion into the furnace during maintenance of sewage. (3) periodic sewage, should ensure that the boiler water level slightly above the normal water level, discharge process must strengthen the monitoring of the boiler water level adjustment, prevent pollution accidents caused by low water levels. (4) General Procedure sewage: opening a first door slowly open the second door, after the first turn of the secondary sewage door, a rear door closed, blowdown should be only slowly added, the mother pipe to prevent sewage water impact. (5) in the discharge process, if the boiler accident, should immediately stop the sewage, but the occurrence of drum level is too high boiling and soft drinks can be sewage. Boiler water level gauge boiler water level gauge rinsing method step rinsing process steps described below: (1) to close the valve and turn on the water discharge side of the steam valve, open the water side valve, the water will turn on the water level indicator. (2) closed water side valve, opening the drain valve to discharge the water level gauge (3) to close the drain valve, the valve opening side of the water, the water will turn on the water level indicator. (4) Repeat the above (2) (3) until the water level gauge step is clear. (5) close the drain valve, open the steam side and the water side valve, water level gauge resume operation. (6) Verify the door closed drainage water level gauge indicates two, should be consistent with slight shaking.

After cleaning gas steam 6 ton boiler commercial factory price kuwait common method of gas-steam oven after prolonged usage will junction green coke, steam oven cleaning gas is steam oven for coking gas during use, problems of carbon deposition. It is a good solution to gas-steam oven cleaning affect the production of contradiction, and routine cleaning technology can produce a lot of wastewater problems. Here we look at the specific bar 1, Delayed Coking cleaning: after adding the diluted cleaning agent to the gas steam boiler system, fill the water level to the high slot 1/2. In addition to the amount of coke cleaning agent is added: 10-20%, determined according to the specific amount of scale thickness. Temperature: 90-95 deg.] C, time: 12-72 hours, can be determined according to the scale thickness. 2, the rinsing cleaning: steam oven gas cleaning system clean the rear end of the residual liquid, rinse added 2 times, until no foam cleaning agent in addition to the coke, water clarity is good. Temperature: 85-95 ℃, Time: 5-8 hours. 3, Chit steps of: cleaning the furnace gas and steam at the end of the gauge is connected or can be connected to other places air compressor, compressed air system to boost 0.3-0.4Mpa, in the low and vented, and so forth, until the water Chuijin so far.

Tai Chi, Jiaozuo City, Jiaozuo City Sports Center is one of important sports infrastructure, a total area of ​​11.73 hectares, held several international events. With strict management in Henan Province for air emissions of pollutants, Jiaozuo City, also launched the governance of coal-fired 6 ton boiler commercial factory price kuwaits, thermal power and other equipment. Jiaozuo Sports Center actively cooperate with municipal workers, took the lead from coal to gas activities, the serious pollution of the original extent of coal-fired boilers to replace gas boilers. Gas boiler cleaning binding understanding of the market, to achieve cooperation with the finalization fast boiler by providing a fast side 2.8MW integrally condensing gas hot water boiler (WNS2.8-1.0 / 95/70-YQ), it is used to Sports Center provides heating and hot water.

The basic principles of coal-fired 6 ton boiler commercial factory price kuwait oil-fired boiler needs to change to comply with the Government's strong support for the consolidation of the environment, resulting in a big group of laid-off coal-fired boilers, if these abandoned coal-fired boilers will cause great waste, the coal-fired boiler into oil-fired boiler has become the most economical way, but in their transformation, we have to abide by some basic principles. (1) the transformation of coal-fired boilers must meet the following conditions: ① the original boiler pressure element must be substantially intact, there is value in use; ② original boiler water vapor system and to send, the wind system to be largely intact. (2) After the transformation of oil-fired boilers should achieve the following objectives: ① maintain the rated parameters of the original boiler (e.g., steam pressure, steam temperature, a return temperature, etc.) constant; ② to maintain or improve the output and efficiency of the original boiler. (3) through the transformation of reach smoke and dust, meet environmental requirements (4) boiler rehabilitation programs must be simple, easy, less investment and quick, short construction period. Thus it involves boiler as small as possible, taking only changed the furnace and the combustion device, part of the transformation range without departing from the basic structure of the boiler body. And that is to change the basic principles of coal-fired boiler oil-fired boiler, for our safety you must be the most stringent.