High Efficiency Agent Price 8t boiler Azerbaijan

6 tons of natural gas high efficiency agent price 8t boiler azerbaijan gas consumption Winter: Speaking of six tons of natural gas boiler gas consumption in winter we have to say that some of the technical terms for the property area of ​​the city, because many of the residents work during the day so is suspended until after the start of the evening run, and belongs to the efficient operation, and therefore opposed to home users, their gas consumption is higher than the individual user adoption, of course, there are some industrial use gas-fired, because they rely on to provide power boiler, so the boiler belongs all the time running at full load condition, and therefore the use of these three local boiler air consumption is also different.

Why there will be gas-fired high efficiency agent price 8t boiler azerbaijan drum wall temperature difference between the upper and lower walls of the upper and lower gas boiler drum boiler temperature difference will cause some damage to the wall of the drum by the compressive stress, tensile stress at the wall by the stress reaches a certain extent gas boiler drum damage occurs even crack. Why would the temperature difference between such a phenomenon? That is because the initial ignition gas boiler drum upper and lower walls will have a certain degree of temperature difference, it is because the initial heating gas boiler, a low metal vapor drum wall temperature, the wall surface of the steam condensation occurs on heat drum, the drum wall in contact with water in contact with the water also occur on the lower wall surface of the heat, but due to the exothermic coefficient of water vapor condensation than the larger, upper drum wall endotherm, therefore the gas temperature of the boiler drum arm is higher than that under the wall faster. This requires us to run gas boiler run time to pay attention to some issues, so as to avoid damage to the gas boiler, ensure the normal operation of the gas boiler.

Around the city to promote the coal to gas project, the major institutions of the heating system put forward higher requirements. Central Conservatory of Music is available to students and teachers clean, safe, comfortable, energy-efficient heating environment, protect the health of teachers and students, to transform the traditional high efficiency agent price 8t boiler azerbaijan treatment. Praise fast boiler Willie sharp series obtained in the transformation of low nitrogen boiler major institutions in Beijing, the Central Conservatory of Music in late 2017 with the signing of fast boiler boiler purchase contract, ordered six Willy sharp series V6-99, to for the entire school's heating facilities.

First, the boot 1, the operator must first have a fireman qualifications, so that the holder of the operation, the person in charge should carefully read the operating manual of the equipment, knowledge and proficiency in the safe operation of the method; 2, every time before starting to check the gas valve is open, otherwise, the burner does not work; 3, the power control button to start the control cabinet, the window displays the current digital case furnace pressure, the pressure level of the high efficiency agent price 8t boiler azerbaijan with reference to the judgment section control instructions; 4, after starting the burner, the first pre-blowing fan after 30-50 seconds sweep, and then open the gas valve; i.e., to establish a flame (combustion process with reference to the specific burner manual); 5, start and stop by the boiler burner controller is to issue an instruction start and stop according to a change in pressure, ( this feature is automatic) the operator should always observe the change in pressure when the abnormal phenomenon needs to stop immediately, the cease-fire; 6, boiler operator should always observe the water level during operation, in particular to ensure that fill the tank with water. The operator periodically to the boiler blowdown should ensure boiler water; 7, once the boiler during operation anomalies operator should shut down immediately after the new failure processing power; 8, burner for an operator to be used in the initial phase supply to determine before starting the motor forward, reverse, normal or not ignition (combustion engine fan case started ten seconds after the stop, alarm control box).